Ambala–Chandigarh Expressway

Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of 2.98 billion (US$37 million)[2] The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.

Ambala Chandigarh Expressway
Route information
Length35 km (22 mi)
Major junctions
West endAmbala
East endChandigarh
Location
CountryIndia
StatesHaryana, Punjab
Highway system

38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).

See also

References