Jump to content

Bukit Kiara MRT station

101°39′4.86″E / 3.1339861°N 101.6513500°E / 3.1339861; 101.6513500
From Wikipedia, the free encyclopedia
 KG12A   CC01 
Bukit Kiara Selatan
Rapid KL (brand)
Future rapid transit station
General information
LocationDamansara Link, Bukit Kiara, Kuala Lumpur
Malaysia
Coordinates3°8′2.35″N 101°39′4.86″E / 3.1339861°N 101.6513500°E / 3.1339861; 101.6513500
Owned byMRT Corp
Line(s)9 Kajang
13 Circle MRT
Tracks4
Construction
Structure typeElevated
ParkingNot available
Bicycle facilitiesNot available
Other information
StatusPlanning
Station code KG12A   CC01 
History
OpeningMarch 2027 (Kajang Line)
December 2028 (Circle Line)
Services
Preceding stationFollowing station
Phileo DamansaraKajang LinePusat Bandar Damansara
towards Kajang

The Bukit Kiara Selatan MRT station, previously known as the Bukit Kiara MRT Station, is a future mass rapid transit (MRT) station on the MRT Circle Line and Kajang Line.[1] The proposed site for the station will be located in between Phileo Damansara and Pusat Bandar Damansara stations. The station is expected to be built as an interchange for both of the lines with constructions slated to begin in 2023. It will be an elevated station under the working name of Bukit Kiara South.[2]

Location

Bukit Kiara South station is planned to be to the south of the Bukit Kiara suburban area, where it would serve nearby administration buildings, convention centers, a small residential community, sports complexes and the Royal Selangor Club. The station location is also within the reach of the Medan Damansara residential area.[3]

History

In 2006, initial plans were to construct an LRT line from Kota Damansara to Cheras, serving areas such as TTDI, Section 17, Section 16 and Bukit Damansara which are near Bukit Kiara.[4] The planned termini have since been extended to Sungai Buloh and Kajang in 2009 to provide a convenient interchange to the KTM lines and to boost development in Sungai Buloh.[5] In 2010, the line plan has been altered to be a rapid transit line which costs RM36 billion.[6][7][8]

After the 2011 public displays, it was announced that Bukit Kiara is to be a future station, located between Phileo Damansara and Pusat Bandar Damansara stations.[9] Construction began on the MRT line in 2012 with marks placed along the tracks for the future station site.[3][10] The first phase of the line opened on 16 December 2016 which skips the site.[11]

The MRT Circle Line was planned with an interchange here, between Pusat Sains Negara and PPUM stations. However, it has been scrapped since May 2018 due to shortage of funds.[12][13]

A revival was then announced in November 2020 for the MRT Circle Line project, with plans to build the Bukit Kiara MRT station along with other stations for the loop line. Constructions are expected to begin in 2023 and it will be opening in stages, starting with Phase 1 which will include Bukit Kiara.[14]

Planned services

The MRT Kajang Line is currently having a typical frequency of 7 to 9 minutes during off-peak hours, equivalent to 6 to 9 trains per hour (tph).[15] Trains run non-stop between Phileo Damansara and Pusat Bandar Damansara where it is nearer to the former.[3]

References

🔥 Top keywords: Main PageSpecial:SearchWikipedia:Featured picturesYasukeHarrison ButkerRobert FicoBridgertonCleopatraDeaths in 2024Joyce VincentXXXTentacionHank AdamsIt Ends with UsYouTubeNew Caledonia2024 Indian general electionHeeramandiDarren DutchyshenSlovakiaKingdom of the Planet of the ApesAttempted assassination of Robert FicoLawrence WongBaby ReindeerXXX: Return of Xander CageThelma HoustonFuriosa: A Mad Max SagaMegalopolis (film)Richard GaddKepler's SupernovaWicked (musical)Sunil ChhetriXXX (2002 film)Ashley MadisonAnya Taylor-JoyPlanet of the ApesNava MauYoung SheldonPortal:Current eventsX-Men '97