Line 2 (Hangzhou Metro)

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[5][6]

Line 2
 2 
A train of Hangzhou Metro Line 2
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations33
Service
TypeRapid transit
SystemHangzhou Metro
Operator(s)Hangzhou Metro Corporation
Depot(s)Shushan Depot
Shuangqiao Stabling Yard
Rolling stockCRRC Nanjing Puzhen 6 cars, type B[1]
Daily ridership747,800 (2020 peak)
History
Opened24 November 2014; 9 years ago (2014-11-24)[2]
Technical
Line length42.85 km (26.63 mi)[3]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
SignallingAnsaldo STS CBTC[4]
Route map

Shushan Depot
1
Chaoyang
2
Caojiaqiao
3
Panshui
4
Renmin Road
5
Hangfachang
6
People's Square
 5 
Left arrow Guniangqiao – East Nanhu Right arrow
7
Jiansheyi Road
8
Jianshesan Road
 7 
9
Zhenning Road
10
Feihong Road
11
Yingfeng Road
12
Qianjiang Century City
 6 
Line 4 interconnection
13
Qianjiang Road
 4   9 
Left arrow Long'an – Guanyintang Right arrow
14
Qingchun Square
15
Qingling Road
16
North Jianguo Road
 5 
Left arrow East Nanhu – Guniangqiao Right arrow
17
North Zhonghe Road
18
Fengqi Road
 1 
Line 1 interconnection
19
Wulinmen
 3 
Left arrow Xingqiao – Wushanqiancun / Shima Right arrow
district Gongshu / Xihu
20
Shentangqiao
 19 
Left arrow Yongsheng Road – Tiaoxi Right arrow
21
Xianing Bridge
22
Xueyuan Road
 10 
Left arrow Yisheng Road – Huanglong Sports Center Right arrow
23
Gucui Road
24
Fengtan Road
25
Wenxin
26
Sanba
 5 
Left arrow Guniangqiao – East Nanhu Right arrow
27
Xialongwei
28
Sandun
district
Xihu
Gongshu
29
Dunxiang Street
district
Gongshu
Yuhang
30
Jinjiadu
 4 
31
Baiyang
32
Dufucun
33
Liangzhu
Shuangqiao Stabling Yard

The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[6]

Opening timeline

SegmentCommencementLengthStation(s)Name
Chaoyang — Qianjiang Road24 November 201418.3 km (11.37 mi)12Phase 1 (southeastern section)
Qianjiang Century City28 April 2016Infill station1
Qianjiang Road — Gucui Road3 July 201711.3 km (7.02 mi)9Phase 1 (northwestern section)
Gucui Road — Liangzhu27 December 201713.32 km (8.28 mi)10Phase 2 & 3
Xianing Bridge30 June 2020[7]Infill station1

Stations

Station nameConnectionsDistance
km[8]
Location
EnglishChinese
1Chaoyang朝阳0.000.00Xiaoshan
2Caojiaqiao曹家桥1.341.34
3Panshui潘水1.562.90
4Renmin Road人民路1.184.08
5Hangfachang杭发厂1.315.39
6People's Square人民广场 5 1.166.55
7Jiansheyi Road建设一路1.478.02
8Jianshesan Road建设三路 7 1.159.17
9Zhenning Road振宁路1.6210.79
10Feihong Road飞虹路1.5812.37
11Yingfeng Road盈丰路1.2313.60
12Qianjiang Century City钱江世纪城 6 0.9414.54
13Qianjiang Road钱江路 4   9 3.4618.00Shangcheng
14Qingchun Square庆春广场0.9318.93
15Qingling Road庆菱路1.2320.16
16North Jianguo Road建国北路 5 1.4721.63Gongshu
17North Zhonghe Road中河北路0.9322.56
18Fengqi Road凤起路 1 0.7423.30
19Wulinmen武林门 3 1.2924.59Gongshu/Xihu
20Shentangqiao沈塘桥 19 1.2825.87
21Xianing Bridge下宁桥1.1527.02Xihu
22Xueyuan Road学院路 10 0.9227.94
23Gucui Road古翠路1.1129.05
24Fengtan Road丰潭路1.4530.50
25Wenxin文新1.2931.79
26Sanba三坝 5 1.1632.95
27Xialongwei虾龙圩1.1934.14
28Sandun三墩1.2435.38
29Dunxiang Street墩祥街1.2736.65Gongshu
30Jinjiadu金家渡 4 0.9337.58Yuhang
31Baiyang白洋1.7939.37
32Dufucun杜甫村1.8741.24
33Liangzhu良渚1.3842.62
To scale map of Line 2 (Hangzhou Metro)

See also

References