Line 3 (Ningbo Rail Transit)

Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Fenghua District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.[3]

Line 3
Line 3 platform of Yinzhou Government station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations24
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened30 June 2019; 4 years ago (2019-06-30)[1]
Technical
Line length37.45 km (23.27 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary with 1,500 V DC
Route map

Route

Line 3 starts from Jinhai Road station as a elevated line. It goes north behind the Airport Road until Chaoyang station and turns into east direction on Yanhu Road to Shishan station. Then it turns north again and underground into Gaotang Bridge Station. Then it turns into east-west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses the Ningbo–Taizhou–Wenzhou railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.[4]

Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[5] The rest 3 stations of phase 2 has started construction since 2 December 2019,[6] and will temporary run trains of line 5 until phase 2 of line 5 completed. Test run of phase 2 of line 3 started in 1 February 2024.[7]

Opening timeline

SegmentCommencementLengthStation(s)Name
Datong Bridge — Gaotang Bridge30 June 2019[1]16.73 km (10.40 mi)[1]15Line 3 (Phase 1)
Gaotang Bridge — Minghui Road28 September 20195.61 km (3.49 mi)[citation needed]3Yinfeng line
Minghui Road — Jinhai Road27 September 2020[8]15.92 km (9.89 mi)6

Stations

Phase 1

Station nameConnectionsDistance
km
Location
EnglishChinese
Datong Bridge大通桥 2 0.000.00Jiangbei
Zhongxing Bridge South中兴大桥南1.721.72Yinzhou
Minglou明楼 6 1.262.98
Sports Center体育馆 7 0.983.96
Sakura Park樱花公园 1 0.964.92
Children's Park儿童公园 4 1.196.11
Qiubi仇毕0.987.09
Qianhu North Road钱湖北路1.438.52
Jinyu Road锦寓路0.979.49
Siming Middle Road四明中路1.1710.66
Yinzhou Government鄞州区政府 5 0.7411.40
Southern Business District南部商务区 8 1.3312.73
Yinzhou Coach Terminal鄞州客运总站1.2513.98
Gouzhang Road句章路1.3415.32
Gaotang Bridge高塘桥0.8216.14
Jiangshan姜山1.7317.87
Shishan狮山1.3519.22
Minghui Road明辉路1.3120.53
Chaoyang朝阳1.8822.41
Fangqiao方桥4.4626.87Fenghua
Jinlin琎琳2.5829.45
Nandu南渡1.6131.06
Dacheng East Road大成东路4.0435.10
Jinhai Road金海路2.3537.45

Phase 2

Station nameConnectionsLocation
EnglishChinese
Luotuo Bridge骆驼桥Zhenhai
Zhenhai Avenue (Cihai)镇海大道(慈海) 7 
Yongmao Road永茂路
Through train to  5 .

References


🔥 Top keywords: Main PageSpecial:SearchWikipedia:Featured picturesYasukeHarrison ButkerRobert FicoBridgertonCleopatraDeaths in 2024Joyce VincentXXXTentacionHank AdamsIt Ends with UsYouTubeNew Caledonia2024 Indian general electionHeeramandiDarren DutchyshenSlovakiaKingdom of the Planet of the ApesAttempted assassination of Robert FicoLawrence WongBaby ReindeerXXX: Return of Xander CageThelma HoustonFuriosa: A Mad Max SagaMegalopolis (film)Richard GaddKepler's SupernovaWicked (musical)Sunil ChhetriXXX (2002 film)Ashley MadisonAnya Taylor-JoyPlanet of the ApesNava MauYoung SheldonPortal:Current eventsX-Men '97