MARTA rail

The MARTA rail network, a component of the MARTA transit system in Metro Atlanta, has four service lines: the Red, Gold, Blue, and Green lines. The Red and Gold lines mainly run along the North-Northeast corridor, and the Blue and Green Lines run along the West-East corridor. The two corridors connect at the Five Points station, which is the only station where transfers are possible between all four lines. In 2023, the system had a ridership of 31,110,300, or about 92,900 per weekday as of the first quarter of 2024.

MARTA rail
MARTA AnsaldoBreda CQ312 Gold train leaving College Park Station
Overview
OwnerMetropolitan Atlanta Rapid Transit Authority
LocaleAtlanta, Fulton and DeKalb Counties, Georgia
Termini
Stations38 (Five Points, 11 North, 4 Northeast, 7 South, 9 East, 5 West, 1 Proctor Creek)
Service
TypeRapid transit
Services
Daily ridership92,900 (weekdays, Q1 2024)[1]
Ridership31,110,300 (2023)[2]
History
Opened
  • 1979 (East-West)
  • 1981 (North-South)
Technical
Line length48 mi (77 km)
CharacterElevated, underground, at-grade
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationThird rail750 V DC
Route map
Map

Rail system

All trains are identified by their destinations, and an automated announcement system announces train destinations, bus and other transit connections, and landmarks that are at or nearby each rail station.

Each station also has a secondary designation that provides the cardinal direction (typically north, south, east, or west) and relative distance from the central Five Points station. For instance, Lindbergh Center is the sixth station from Five Points traveling north, and has the secondary designation (N6). Northeast of Lindbergh Center on the Gold Line, stations are designated with NE while continuing the numbering, so Lenox is (NE7). Similarly, Bankhead is on a branch from the main east-west trunk and is designated (P4),[3] a legacy of the original Proctor Creek name for the Green Line.[4]

During daytime hours, trains on the Red and Gold lines service the entire north-south trunk line and split north of Lindbergh Center (N6). All MARTA trains are identified with a destination on electronic LCD signs on the front and sides of the train and on each car. After 9pm, the Red Line is short-turned and runs as a shuttle between North Springs (N11) and Lindbergh Center (N6), connecting to the Gold Line at Lindbergh Center.[5] The connection is scheduled, with southbound Red trains arriving at Lindbergh Center just before Gold trains continuing southbound, and in reverse, northbound Gold trains arrive at Lindbergh just before Red trains leave northbound.

Blue and Green lines service the east-west trunk line together between Ashby (W3) and Edgewood–Candler Park (E4). At Ashby, Blue Line service continues to H.E. Holmes (W5) while Green Line trains divert to Bankhead Station (P4). Green Line service terminates at Edgewood–Candler Park, while the Blue Line continues east to Indian Creek. After 9pm, Green Line service is short-turned and operates as a shuttle between Bankhead (P4) and Vine City (stop W2). On weekends before 9pm, Green Line service is short-turned at King Memorial (stop E2).[5]

Older system maps used orange to denote the North-South line and blue for the East-West line, including the Northeast and Proctor Creek branches.[6] Lines were identified by the direction of travel and/or terminii.[4][7] MARTA switched to a color-based route naming system in October 2009, so the North-South or North Springs-Airport line became the Red Line, for example.[8] The former Northeast line that served Doraville, known as the "heart of Atlanta's Asian community", was initially named the Yellow Line, which Asian-Americans found derogatory.[9] It was renamed to the Gold Line in 2010 in response to the complaints.[10]

Many suburban stations offer designated free daily and paid long term parking in MARTA-operated park and ride lots.[11] These stations also have designated kiss and ride passenger drop off parking spaces closest to the stations' entrances.

Operation

The MARTA rail system operates between approximately 4:45 a.m. and 1 a.m. Monday through Friday, and 6 a.m. to 1 a.m. Saturdays and Sundays.[12]

System headways (August 2023)[12][13]
PeriodHeadway
(min.)
WeekdayDaytime
(6 AM – 7 PM)
12
(non-rush)15
Nights
(9 PM+)
20
Weekends20

Due to the COVID-19 pandemic in Atlanta, train headways were reduced to 15 minute intervals between trains during most weekday hours and 20 minutes at other times.[13] In August 2023, MARTA announced that frequencies would increase to every 12 minutes on all rail lines between 6 a.m. and 9 a.m. and 2:30 p.m. and 7:30 p.m. Following the increase, headways would be every 6 minutes along the interlined portion of the network.[14]

Historical system headways
PeriodHeadway (min.)
1979–20052005–2020
WeekdayRush
(6–9 AM & 3–7 PM)
810
Non-rush12
Nights
(9 PM+)
1520
Weekends10/1520

Originally, MARTA operated trains every eight minutes during the day on weekdays on each route. When two routes operated on the same tracks, the effective headway was cut in half, and the North-South Line operated on a combined four-minute headway between Lindbergh Center and Airport stations on the trunk. On Saturdays, it was every ten minutes (five minutes combined on the North-South Line trunk), and on Sundays it was every 15 minutes (7.5 minutes on the North-South Line trunk). At night, trains operated every 15 minutes.[15]

After budget cuts in 2005 affected the rail system, headways were increased by 25–50% to 10 minutes weekdays during rush hour and 12 minutes during midday, and 20 minutes nightly and weekends. For combined service, headways decrease to 5 minutes during rush hour and 6 minutes during midday and 10 minutes on the weekends during the day. All rail lines operate 20 minutes during late night (8:30pm weekdays, 8:50pm weekends) as the Red Line was short-turned and only ran from North Springs to Lindbergh Center; likewise the Green Line was short turned and operated from Bankhead to Vine City. Due to ongoing rail system maintenance, weekend headways were variable and could range from the normal 20 minutes to as much as 24 minutes, with the Green and Red lines occasionally being truncated all weekend. During weekends in the latter case, headways along the shared lines will increase from 10 minutes to 20 minutes.[16]

Stations

Red and Gold lines
 Red 
N11
North Springs
N10
Sandy Springs
N9
Dunwoody
N8
Medical Center
N7
Buckhead
 Gold 
NE10
Doraville
NE9
Chamblee
NE8
Brookhaven/​Oglethorpe
NE7
Lenox
N6
Lindbergh Center
Armour Yards
N5
Arts Center
N4
Midtown
N3
North Avenue
N2
Civic Center
N1
Peachtree Center
0
Five Points
S1
Garnett
S2
West End
Murphy Crossing
S3
Oakland City
S4
Lakewood/​Fort McPherson
S5
East Point
S6
College Park
South Yard & Shops
Red
Gold
S7
Airport
Key
Red Line
Gold Line
Red/Gold
Blue/Green
Yard tracks

All stations are accessible
Blue and Green lines
 Blue 
W5
Hamilton E. Holmes
W4
West Lake
 Green 
P4
Bankhead
Joseph E. Boone
W3
Ashby
W2
Vine City
W1
GWCC/​CNN Center
0
Five Points
E1
Georgia State
E2
King Memorial
Krog Street/Hulsey Yard
E3
Inman Park/​Reynoldstown
 Green 
E4
Edgewood/​Candler Park
E5
East Lake
E6
Decatur
E7
Avondale
Avondale Yard
E8
Kensington
 Blue 
E9
Indian Creek

All stations are accessible
Key
Blue Line
Green Line
Blue/Green
(weekdays)
Blue/Green
(all days)
Red/Gold
Yard tracks
  • † denotes a terminal station
  • Until 1994, the NE codes were designated as N
StationCodeLinesJurisdictionStructureOpenedEntries/day
(2013)[17]
Ref.
AirportS7   College ParkElevatedJune 18, 19889,173[18]
Arts CenterN5   AtlantaUndergroundDecember 18, 19826,605[19]
AshbyW3   AtlantaUndergroundDecember 22, 19791,791[20]
AvondaleE7 DecaturAt-gradeJune 30, 19794,327[21]
BankheadP4 AtlantaElevatedDecember 12, 19921,903[22]
Brookhaven/OglethorpeNE8 BrookhavenElevatedDecember 15, 19842,357[23]
BuckheadN7 AtlantaAt-gradeJune 8, 19962,643[24]
ChambleeNE9 ChambleeElevatedDecember 19, 19873,785[25]
Civic CenterN2   AtlantaUnderground, elevatedDecember 4, 19812,692[19]
College ParkS6   College ParkOpen-cutJune 18, 19889,026[18]
DecaturE6 DecaturUndergroundJune 30, 19793,821[21]
GWCC/CNN CenterW1   AtlantaAt gradeDecember 22, 19792,107[20]
DoravilleNE10 DoravilleElevatedDecember 12, 19925,521[22]
DunwoodyN9 DunwoodyElevatedJune 8, 19963,545[24]
East LakeE5 Atlanta/DecaturAt-gradeJune 30, 19791,241[21]
East PointS5   East PointOpen-cutAugust 16, 19864,571[26]
Edgewood/Candler ParkE4   AtlantaElevatedJune 30, 19791,143[21]
Five Points*0   AtlantaUndergroundDecember 4, 198119,447[21]
   At-gradeDecember 22, 1979
GarnettS1   AtlantaElevatedDecember 4, 19811,516[19]
Georgia StateE1   AtlantaElevatedJune 30, 19794,055[21]
H. E. HolmesW5 AtlantaElevatedDecember 22, 19796,480[20]
Indian CreekE9 Unincorporated DeKalb CountyAt-gradeJune 26, 19935,612[27]
Inman Park/ReynoldstownE3   AtlantaAt-gradeJune 30, 19792,525[21]
KensingtonE8 Unincorporated DeKalb CountyAt-gradeJune 26, 19935,950[27]
King MemorialE2   AtlantaElevatedJune 30, 19791,517[21]
Lakewood/Fort McPhersonS4   Atlanta / East PointEmbankmentDecember 15, 19842,207[23]
LenoxNE7 AtlantaUndergroundDecember 15, 19843,284[23]
Lindbergh CenterN6   AtlantaOpen-cutDecember 15, 19848,604[23]
Medical CenterN8 Sandy SpringsAt-gradeJune 8, 19961,629[24]
MidtownN4   AtlantaUndergroundDecember 18, 19825,664[19]
North AvenueN3   AtlantaUndergroundDecember 4, 19815,045[19]
North SpringsN11 Sandy SpringsElevatedDecember 16, 20006,436[28]
Oakland CityS3   AtlantaEmbankmentDecember 15, 19844,432[23]
Peachtree CenterN1   AtlantaUndergroundSeptember 11, 19827,453[19]
Sandy SpringsN10 Sandy SpringsUndergroundDecember 16, 20002,322[28]
Vine CityW2   AtlantaAt-gradeDecember 22, 1979821[20]
West EndS2   AtlantaElevatedSeptember 11, 19827,056[19]
West LakeW4 AtlantaAt-gradeDecember 22, 19791,378[20]

Rolling stock

MARTA currently operates a total of 312 married paired rail cars which can operate at speeds of up to 70 miles per hour (110 km/h). The trains are powered by an electrified third rail and can be operated in any combination from two to eight rail cars,[29] with six cars being the normal length for the Blue, Red and Gold rail lines, and two cars for the Green line (due to the shorter platform at Bankhead).

MARTA rail fleet
TypeManufacturerImageFleet #YearsQuantity builtConstructedIn serviceTraction motorsNotes
CQ310Société Franco-Belge 101–2001979–1981981976–198094Adtranz/Bombardier MITRAC 1508C[a]111/112 converted to a work unit. 101 and 102 unpaired with unknown fate. 103/104 scrapped after 2019 derailment.
501–520200All single units. Cars retired in 2006 and stored at Avondale Yard until 2023. Currently in the process of disposal in preparation for delivery of CQ400 pilot cars. Units 509 and 510 preserved by the Southeastern Railway Museum[30] and the Trolley Museum of New York,[31] respectively. Some of the cars were dumped into the Atlantic Ocean for use as an artificial reef. [32]
CQ311Hitachi 201–3201984–19881201982–1985118All units received life extension work from Kinki Sharyo.[33] 2 units scrapped after damage from an incident.
CQ312AnsaldoBreda[34] 601–664, 667–7022001–20051001998–200098[35]Ordered from Breda before creation of AnsaldoBreda. Cars 665/666 purposely numbered 701/702 due to negative connotations with 666. Units 601/602 were retired in 2023 due to mechanical issues and were reefed later that year in December.[36][37]
CQ400Stadler RailTBA2025–254 on order + 100 options[38]2020–present0TBACurrently on order. Scheduled to enter service in 2025. Will gradually replace all current rail cars.

In 2002, Alstom was contracted by MARTA to overhaul 98 CQ310 cars and all 120 CQ311 cars as part of a $246m refurbishment contract.[39] The rehabilitated cars feature upgraded passenger amenities and upgraded propulsion and train control hardware. The first rehabilitated cars began service on March 12, 2006. The rehabilitation was completed on February 23, 2009.[40]

In 2011, Alstom was awarded an additional $117 million 5-year contract with MARTA to upgrade its train control and SCADA systems.[41] The new technology is designed to provide MARTA's rail team with more efficient operations, better communication between trains and stations, enhanced monitoring capabilities, quicker response times, and reduced maintenance costs.[42] Included in the project is an upgrade for all 318 rail cars to install an enhanced Fault Identification and Monitoring System (FIMS) and full color driver's display built by Quester Tangent.[43] The new systems passed "mini fleet" testing in 2015.

On December 1, 2017, MARTA posted a notice of intent to award a $146 million contract for the "Rail Car Life Extension Program" to Kinki Sharyo International LLC. On January 26, 2018, Kinki Sharyo signed the $146 million rail car refurbishment contract. The work starts with 118 cars, with 94 more options.[44][45]

On March 29, 2019, Stadler Rail was awarded the contract to manufacture up to 354 new CQ400 rail cars for MARTA. These cars, which will enter into service in 2025, will replace the entire fleet of CQ310, CQ311, and CQ312 trains and provide expansion to the rail fleet.[46][47][48]

Historical timeline

This is a list of key dates which led to the formation of the MARTA stations along the established rapid rail lines.[49]

  • June 30, 1979 – MARTA's first line, the East Line, began operating between Avondale and Georgia State. It also marked the start of MARTA's combined bus and rail service.
  • December 22, 1979 – MARTA's second line, the West Line, began operating between Hightower (H.E. Holmes) and Five Points Station.
  • December 4, 1981 - Garnett, Civic Center, North Avenue, and Five Points (north-south platform) stations began service. The North Line was introduced.
  • September 11, 1982 – the Peachtree Center and West End stations, along the North Line began service.
  • December 18, 1982 – the Arts Center and Midtown stations began service.
  • December 15, 1984 – five new stations opened: Lindbergh Center, Lenox, Brookhaven, Oakland City and Lakewood/Fort McPherson. The South Line was introduced.
  • August 16, 1986 – the East Point Station opened, extending the South Line by about two miles.
  • December 19, 1987 - the Chamblee Station began service and served as the temporary end of the Northeast Line.
  • June 18, 1988 – the Airport Station opens, and becomes the southern terminus of the North-South Line.
  • December 12, 1992 – The Bankhead Station/Proctor Creek Line went into service.
  • December 29, 1992 – The Doraville Station opens and becomes the northern terminus of the Northeast Line.
  • June 26, 1993 – MARTA extended East Line services through Kensington to Indian Creek Station – the first time the rail line went beyond the I-285 perimeter.
  • June 8, 1996 – MARTA extended North Line services through Buckhead, Medical Center and Dunwoody Stations.
  • 1999 – MARTA announced a partnership with BellSouth to create the Lindbergh Transit Oriented Development (TOD), a live, work and play community built around a rail station and the largest multi-use development of its kind in the United States at the time.
  • December 16, 2000 – MARTA opened two new rail stations – Sandy Springs and North Springs – on the North Line.
  • October 1, 2009 – MARTA renames its lines based on colors instead of directions.
  • February 2010 – MARTA agrees to rename the Yellow Line as the Gold Line in response to outcry from members of the Doraville Asian community.[50]
  • March 25, 2024 – Atlanta mayor Andre Dickens announces plans for four new infill stations, including one at Murphy Crossing on the Westside of the BeltLine.[51]
  • April 11, 2024 – The locations of the remaining three infill stations are revealed to be at Krog Street/Hulsey Yard, Joseph E. Boone, and Armour Yards.[52]

See also

KML is from Wikidata

Notes

References