MIA station is an under-construction Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Parañaque. It is a part of the LRT-1 South Extension Project.

MIA
Manila Light Rail Transit System
Construction of MIA station in April 2023
General information
LocationRoxas Boulevard cor. NAIA Road
Tambo, Parañaque
Coordinates14°31′06″N 120°59′35″E / 14.51843°N 120.99299°E / 14.51843; 120.99299
Owned byLight Rail Transit Authority
Line(s)Line 1
Platforms2 (2 side)
Tracks2
Construction
Structure typeElevated
Other information
StatusUnder construction
History
Opening2024
Services
Preceding stationLRTA_Logo
Manila LRT
Following station
RedemptoristLine 1Asia World
towards Niog

Name

MIA is the abbreviation for the former name of Ninoy Aquino International Airport (NAIA), which was Manila International Airport, which opened in 1948, two years after independence from the United States. Following the government's renaming of MIA as NAIA in 1987, a road that was previously named the same became NAIA Road between Roxas Boulevard and the terminals.

History

MIA station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers (7.3 mi). The extension will have 8 passenger stations with an option for 2 future stations (Manuyo Uno and Talaba).[1] The project was first approved on August 25, 2000, and the implementing agreement for the project was approved on January 22, 2002.[2] However, construction for the extension was repeatedly delayed until the project was shelved years later.

The plans for the southern extension project were restarted as early as 2012 during the second Aquino administration and was expected to begin construction in 2014, but was delayed due to right-of-way issues. The issues were resolved in 2016 and the project broke ground on May 4, 2017.[3] Meanwhile, construction works on the south extension began on May 7, 2019, after the right-of-way acquisitions were cleared.[2]

As of April 1, 2023, the project is 82.7% complete; the station itself is 66.8% complete.[4] Phase 1 of the extension (from Redemptorist to Dr. Santos) is slated to be operational by the 4th quarter of 2024,[4] with full operations by second quarter of 2027.[5]