North East railway line

North East (SG)
Overview
StatusOperational passenger services from Southern Cross to Albury and Sydney
Owner
LocaleVictoria, Australia
Termini
Connecting lines
Former connectionsUpfield—Somerton link
Stations6 current stations
Service
TypeVictorian railway line
ServicesAlbury Southern
Spirit of Progress, Southern Aurora, Sydney–Melbourne Express, Intercapital Daylight
Shared tracks:
South Kensington–West Footscray, Albion–Jacana, Albury
Operator(s)
History
CommencedNovember 1959 (1959-11)
Opened
  • Southern Cross to Albury on 3 January 1962 (1962-01-03)
Completed3 January 1962 (1962-01-03)
ReopenedNew Wodonga section on 23 July 2010 (2010-07-23)
ClosedOld Wodonga section on 9 November 2008 (2008-11-09)
Technical
Number of tracksDouble track:
  • Southern Cross to Tottenham
  • Seymour to border

Single track:

  • Tottenham to Seymour
  • border to Albury
Track gauge4 ft 8+12 in (1,435 mm)
Route map
North East standard gauge railway line
km
Up arrow
Multiple lines
via Flinders Street
1.2
Southern Cross
Melbourne Freight Terminal
Left arrow
City Loop | UpperRight arrow Webb Dock line (dismantled)
Victoria Dock (North wharf)
(demolished)
Melbourne Yard & Steel Terminal | Victoria Dock (old)
(all demolished)
CityLink | Victoria Dock (Westgate)
Appleton Dock
South Dynon | Swanson Dock
North Dynon
tunnel under Bunbury Street
Whitehall Street
UpperLeft arrow
Multiple lines
to Southern Cross or Flinders Street
6.9
Footscray
Right arrow
7.8
Middle Footscray
Middle Footscray railway station#Transport links
8.3
8.6
West Footscray
West Footscray railway station#Transport links
10.3
Tottenham
10.4
Ashley Street
11.0
White City
(demolished)
Right arrow
Maidstone
(demolished)
12.2
Right arrow
13.5
Sunshine
13.6
Hampshire Road
Right arrow
Multiple lines
via Deer Park
13.3
Anderson Road
13.7
Albion
Albion–Jacana section
13.8
Albion Loop
14.2
15.4
McIntyre Road
16.0
McIntyre Sidings | McIntyre Loop
17.6
18.8
Keilor Park Drive
19.8
Albistore Siding
(demolished)
20.3
Keilor East
(proposed)
Right arrow
22.2
Tullamarine Loop
23.5
24.1
26.4
Left arrow
26.5
Jacana
26.5
27.0
Jacana Loop
27.6
Camp Road
27.9
Broadmeadows
Broadstore Siding
(demolished)
30.3
Coolaroo
Coolaroo railway station#Transport links
Left arrow
32.7
Somerton Road
32.8
Somerton
(demolished)
33.1
Somerton Yard | Roxburgh Park
Roxburgh Park railway station#Transport links
37.1
Craigieburn
37.4
38.5
end of overhead
38.5
40.8
end of Metro area
Seymour section
44.2
Donnybrook
Donnybrook railway station#Transport links
52.8
Beveridge
58.5
Wallan
Wallan railway station#Transport links
61.7
Lightwood
(demolished)
64.5
Heathcote Junction
Right arrow
66.3
Wandong
67.8
69.7
Mathieson's Siding
(demolished)
74.5
Kilmore East
Kilmore East railway station#Transport links
77.0
Kilmore East Quarry Siding
86.2
Broadford
88.3
McDougall's Siding
(demolished)
96.7
Lowry's Siding
(demolished)
99.5
101.2
Tallarook
Left arrow
105.5
Dysart
107.4
109.7
Seymour
117.9
Gravelside Siding
(demolished)
120.4
Mangalore
(demolished)
Right arrow
Albury section
127.0
Avenel
132.3
Monea
(demolished)
138.6
Locksley
(demolished)
147.3
Longwood
(demolished)
154.3
Creighton
(demolished)
162.1
Euroa
Euroa railway station#Transport linksEuroa railway station#Transport links
169.9
Balmattum
(demolished)
180.4
Violet Town
186.8
Burkes Hill Siding
(demolished)
194.2
Baddaginnie
(demolished)
202.9
Hanson's Siding
(demolished)
206.3
Benalla
Benalla railway station#Transport linksBenalla railway station#Transport linksNSW TrainLink Southern
Left arrow
Tatong line
to Tatong
(dismantled) | Right arrow
Oaklands line
to Oaklands
215.8
Winton
(demolished)
222.0
Head's Siding
(demolished)
229.8
Glenrowan
(closed)
244.1
Alumatta Siding
(demolished)
Left arrow
Whitfield line
to Whitfield
(dismantled)
245.0
Wangaratta
Wangaratta railway station#Transport linksWangaratta railway station#Transport linksNSW TrainLink Southern
250.9
Bowser
(demolished)
Left arrow
Yackandandah line
to Yackandandah
| Right arrow
Peechelba East line
to Peechelba East
(dismantled)
268.6
Springhurst
Springhurst railway station#Transport links
Right arrow
Wahgunyah line
to Wahgunyah
(dismantled)
279.4
Barambogie Ballast Siding
(demolished)
282.4
Chiltern
Chiltern railway station#Transport links
291.2
Barnawartha
(closed)
SCT Barnawartha
303.3
West Wodonga
(demolished)
310.2
Wodonga
Wodonga railway station#Transport links
311.8
Wodonga (old)
(closed)
Left arrow
Cudgewa line
to Cudgewa
(dismantled)
313.1
Wodonga Coal Siding
(demolished)
313.8
Bridge over Murray River
NSW
Victoria
border
315.9
Albury
NSW TrainLink SouthernAlbury railway station#Transport links
Down arrow
km

North East (original BG line)
Overview
Other name(s)Albury
Status
  • Operational with broad gauge passenger services from Flinders Street to Seymour
  • Gauge converted beyond Seymour
Owner
LocaleVictoria, Australia
Termini
Connecting lines
Former connections
Stations
  • 38 current stations
  • 13 former stations
  • 2 current siding
  • 13 former sidings
Service
TypeVictorian railway line
ServicesAlbury Craigieburn Seymour Shepparton
Operator(s)
History
Commenced21 October 1860 (1860-10-21)
Opened
  • Southern Cross to North Melbourne on 17 January 1859 (1859-01-17)
  • North Melbourne to Essendon on 21 October 1860 (1860-10-21)
  • Essendon to Dysart on 18 April 1872 (1872-04-18)
  • Dysart to Seymour on 26 August 1872 (1872-08-26)
  • Seymour to Longwood on 20 November 1872 (1872-11-20)
  • Longwood to Violet Town on 20 March 1873 (1873-03-20)
  • Violet Town to Benalla on 18 August 1873 (1873-08-18)
  • Benalla to Wangaratta on 28 October 1873 (1873-10-28)
  • Wangaratta to Wodonga on 21 November 1873 (1873-11-21)
  • Wodonga to Albury on 14 June 1883 (1883-06-14)
  • Flinders Street to Southern Cross on 29 November 1891 (1891-11-29)
Completed14 June 1883 (1883-06-14)
Reopened
  • North Melbourne to Newmarket on 31 October 1867 (1867-10-31)
  • Newmarket to Essendon on 9 January 1871 (1871-01-09)
Electrified
  • Flinders Street to Essendon on 28 May 1919 (1919-05-28)
  • Essendon to Broadmeadows on 4 September 1921 (1921-09-04)
  • Broadmeadows to Craigieburn on 22 July 2007 (2007-07-22)
Gauge convertedSeymour to Albury on 23 July 2010 (2010-07-23)
Closed
  • North Melbourne to Essendon on 1 July 1864 (1864-07-01)
  • Seymour to Albury on 9 November 2008 (2008-11-09)
Technical
Line length307.812 km (191.27 mi)
Number of tracksBroad gauge
  • Six tracks: Flinders Street to North Melbourne
  • Four tracks: North Melbourne to Kensington
  • Double track: Kensington to Dysart
  • Single track: Dysart to Seymour

Standard gauge
Double track:

  • Seymour to border

Single track:

  • Broadmeadows to Seymour
  • border to Albury
Track gauge
  • 5 ft 3 in (1,600 mm)
  • 4 ft 8+12 in (1,435 mm)
ElectrificationFlinders Street to Craigieburn: 1500 V DC overhead
Operating speed
  • 130 km/h (81 mph) - Passenger
  • 115 km/h (71 mph) - Freight
Signalling
Maximum incline1 in 50 (2%)
Route map

km
Up arrow
Multiple lines
via Richmond or Jolimont
0.0
Flinders Street
Flinders Street railway station#Transport linksFlinders Street railway station#Transport links
1.4
Parliament
2.7
Melbourne Central
Melbourne Central railway station#Transport linksMelbourne Central railway station#Transport links
3.3
Flagstaff
Flagstaff railway station#Transport links
1.2
Southern Cross
2.9
North Melbourne
3.1
Dynon Road
3.7
3.7
Right arrow
Multiple lines
via Footscray
Metro section
(Craigieburn Line)
5.4
Racecourse Road
5.5
Newmarket
6.8
Ascot Vale Road
7.0
Ascot Vale
Ascot Vale railway station#Transport links
7.4
8.1
Moonee Ponds
Moonee Ponds railway station#Transport links
9.2
Essendon
9.5
10.4
Glenbervie
Glenbervie railway station#Transport links
11.0
Strathmore
Strathmore railway station#Transport links
11.3
11.7
11.8
11.9
12.5
Pascoe Vale
Pascoe Vale railway station#Transport links
14.1
Oak Park
15.6
Glenroy
Glenroy railway station#Transport links
16.7
Jacana
16.7
17.8
Camp Road
18.1
Broadmeadows
Broadstore Siding
(demolished)
20.5
Coolaroo
Coolaroo railway station#Transport links
22.9
Somerton Road
23.0
Somerton
(demolished)
23.3
Somerton Yard | Roxburgh Park
Roxburgh Park railway station#Transport links
27.3
Craigieburn
27.6
28.0
end of overhead
28.7
31.0
end of Metro area
Seymour section
34.4
Donnybrook
Donnybrook railway station#Transport links
43.0
Beveridge
48.7
Wallan
Wallan railway station#Transport links
51.9
Lightwood
(demolished)
54.7
Heathcote Junction
Right arrow
56.5
Wandong
58.0
59.9
Mathieson's Siding
(demolished)
64.7
Kilmore East
Kilmore East railway station#Transport links
67.2
Kilmore East Quarry Siding
76.4
Broadford
78.5
McDougall's Siding
(demolished)
86.9
Lowry's Siding
(demolished)
89.7
91.4
Tallarook
Left arrow
95.7
Dysart
97.6
99.9
Seymour
108.1
Gravelside Siding
(demolished)
110.6
Mangalore
(demolished)
Right arrow
117.2
Avenel
122.4
Monea
(demolished)
128.8
Locksley
(demolished)
137.5
Longwood
(demolished)
144.5
Creighton
(demolished)
152.3
Euroa
Euroa railway station#Transport linksEuroa railway station#Transport links
160.1
Balmattum
(demolished)
170.6
Violet Town
177.0
Burkes Hill Siding
(demolished)
184.4
Baddaginnie
(demolished)
193.1
Hanson's Siding
(demolished)
196.5
Benalla
Benalla railway station#Transport linksBenalla railway station#Transport linksNSW TrainLink Southern
Left arrow
Tatong line
to Tatong
(dismantled) | Right arrow
Oaklands line
to Oaklands
206.0
Winton
(demolished)
212.2
Head's Siding
(demolished)
220.0
Glenrowan
(closed)
234.3
Alumatta Siding
(demolished)
Left arrow
Whitfield line
to Whitfield
(dismantled)
235.2
Wangaratta
Wangaratta railway station#Transport linksWangaratta railway station#Transport linksNSW TrainLink Southern
241.1
Bowser
(demolished)
Left arrow
Yackandandah line
to Yackandandah
| Right arrow
Peechelba East line
to Peechelba East
(dismantled)
258.8
Springhurst
Springhurst railway station#Transport links
Right arrow
Wahgunyah line
to Wahgunyah
(dismantled)
269.6
Barambogie Ballast Siding
(demolished)
272.6
Chiltern
Chiltern railway station#Transport links
281.4
Barnawartha
(closed)
293.5
West Wodonga
(demolished)
300.4
Wodonga
Wodonga railway station#Transport links
302.0
Wodonga (old)
(closed)
Left arrow
Cudgewa line
to Cudgewa
(dismantled)
303.3
Wodonga Coal Siding
(demolished)
304.0
Bridge over Murray River
NSW
Victoria
border
306.1
Albury
NSW TrainLink SouthernAlbury railway station#Transport links
Down arrow
km

The North East railway line is a railway line in Victoria, Australia.[1] The line runs from Southern Cross railway station on the western edge of the Melbourne central business district to Albury railway station in the border settlement of Albury-Wodonga, serving the cities of Wangaratta and Seymour, and smaller towns in northeastern Victoria.

The railway line is both standard gauge and broad gauge. It originally was built as broad gauge the entire length, but another track was built as standard gauge between Seymour and Albury, with construction of the standard gauge track commencing in November 1959 and completed in January 1962, completing the Sydney-Melbourne standard gauge railway. Between 2008 and 2010, the broad gauge track between Seymour and Albury was finally converted to be the line's second standard gauge track. The original section between Southern Cross and Jacana remains broad gauge, with the standard gauge joining and running parallel to the broad gauge between Jacana and Seymour, where the broad gauge branches off on the Tocumwal line, and finally continuing as standard gauge all the way to Albury.

The line is owned by VicTrack, but the standard gauge sections are leased to and maintained by the Australian Rail Track Corporation.[2]

History

Broad gauge via Essendon

New A 398 leads a B class up Glenroy Bank on the Sydney Express, circa 1900
S class 4-6-2 leading the Sydney Limited between Seymour and Melbourne, circa 1928
A streamlined S class locomotive hauling the Spirit of Progress near Kilmore East in 1937
Junction of the North East and Shepparton lines at the site of Mangalore station
V/Line Albury line train
Steamrail "Farewell Broad Gauge" special, Benalla, 2008
Former end of the broad gauge, the break-of-gauge platform at Albury

The Melbourne and Essendon Railway Company opened the first section of the Albury line, from North Melbourne to Essendon, in 1860.[3] Following its takeover by the Victorian Government in 1867, the line was extended by 1872[4] to School House Lane on the south side of the Goulburn River near Seymour, and later that year to Seymour and then to Longwood. Violet Town, Benalla, Wangaratta, Springhurst and Wodonga were reached in 1873,[3] connecting with the New South Wales Government Railways at Albury at a break of gauge in 1883. The design engineer was Robert Watson.

The section between Flinders Street and Essendon was used by suburban services and in May 1919, that section was part of the first lines to be electrified in Melbourne, apart from a test installation on the Flemington Racecourse line.[5] In 1921, the line was electrified to Broadmeadows, where it remained till the extension of electrification in 2007.

Until 2008, the Albury V/line service continued to run via Essendon along the broad gauge tracks, together with the Seymour and Shepparton V/line services.

First standard gauge track

Standard-gauge Pacific National container freight train near Seymour

Preliminary work for construction of the standard gauge track began in November 1957 with the establishment of camps for the building gangs, with the first section being laid in November 1959, and the final section on 5 April 1962.[6] The track ran via what is now Albion–Jacana railway line and does not run parallel with the broad gauge track between Jacana and Spencer Street stations.

The line was used by prestige passenger services between the state capitals of Melbourne and Sydney, including the Sydney Limited, Spirit of Progress, Southern Aurora, and Intercapital Daylight. Due to high costs and declining patronage, they were replaced by the XPT in the 1990s.

Gauge conversion

Maintaining two parallel railways between Seymour and Albury drew criticism, noting inefficiencies in maintaining track, operating trains, and duplicated train control centres.[7] By 2001, the State Government announced the conversion of the broad gauge line to standard,[8] but action was stifled, due largely to complex leasing arrangements. Speed restrictions were eventually applied to the broad gauge line due to track deterioration.[9]

In May 2008, it was announced that the tracks would be upgraded, including a 5 km (3.1 mi) bypass around Wodonga, the conversion of 200 kilometres (120 mi) of the North East railway line to standard gauge between Seymour and Albury as well as other upgrades to the North East line.[10] Costing A$501.3 million, the Victorian Government was to contribute A$171.3 million, the Australian Government A$45 million for the Wodonga Rail Bypass, and the Australian Rail Track Corporation A$285 million and take responsibility for the standard-gauge line under a 45-year lease from Victoria.[11] The project was due for completion by 2010, with passenger services to be disrupted for up to 12 months.[12]

On 8 November 2008, broad gauge passenger trains ceased after the evening V/Line service from Melbourne to Albury and a special train operated by the Seymour Railway Heritage Centre, the final broad-gauge passenger train from Albury to Melbourne.[13][14] In December 2008, standardisation works commenced, contracted by ARTC to the Southern Improvement Alliance. The first train on the Wodonga Rail Bypass was in March 2010.[15]

In early August 2010, CountryLink decided to terminate all Sydney-Melbourne XPTs at Albury for an indefinite length of time, due to defects in the newly re-sleepered track. "Mud holes" resulted in speed restrictions on more than 200 kilometres (about 66 per cent) of the line, adding an extra 1.5 hours to the travelling time.[16] Train drivers have blamed the ARTC's $285 million concrete sleeper project for the track issues, stating that the incorrect insertion of 300,000 new concrete sleepers is to blame. They have repeatedly reported freight trains breaking couplings due to the rough track.[17] CountryLink trains resumed in mid September 2010, V/Line trains the following year.[18]

Wallan train derailment

On 20 February 2020, a NSW TrainLink XPT passenger train towards Sydney derailed at Wallan, resulting in suspension of freight, V/Line and NSW TrainLink services on the North East Line and the adjacent broad gauge Tocumwal railway line. V/Line services resumed on 1 and 2 March 2020.[19]

Regional Rail Revival

The North East Line Upgrade (part of the Regional Rail Revival Program) was unveiled in mid 2018, with a series of upgrades announced to the line.[20][21] Upgrades were delivered by different parties, including:[22][23][24]

  • The Australian Rail Track Corporation, which completed:
    • Track resurfacing
    • New ballast
    • New underground wires
    • Drainage improvements
    • Rail bridge upgrades
    • Mud-hole removal
    • Upgrades to 20 more rail bridges
    • The renewal of track turnouts at Violet Town and Seymour
  • Rail Projects Victoria, which completed:
    • A number of level crossing closures and upgrades
    • Modifications to train stabling at South Dynon
    • Upgrades to train stabling and accessibility at Albury station

The upgrades were completed December 2020 and allowed the introduction of VLocity DMUs on the Albury V/Line rail service, replacing existing locomotive hauled train sets.[25]

Network and operations

Services

Craigieburn service

Seymour service

Seymour and Shepparton V/Line services continue to use the adjacent broad gauge tracks.

Albury service

Since 2010, the entire line is utilised by V/Line Albury trains, which stops at every station between Albury and Seymour. South of Seymour, all passenger trains heading to, and from, Melbourne (Southern Cross) only make a scheduled stop at Broadmeadows. The services are run using dedicated standard gauge VLocity DMUs.

Spirit of Progress

The Spirit of Progress was the premier express passenger train on the Victorian Railways in Australia.

From its introduction in November 1937 until April 1962 the train service ran on the broad gauge line from Spencer Street station to Albury, on the New South Wales / Victorian border, where passengers changed to a New South Wales Government Railways train (the Melbourne Limited Express), running on the standard gauge track to complete the journey to Sydney. Following the completion of the standard gauge line between Melbourne and Albury in April 1962 the Spirit of Progress was extended to Sydney. With declining passenger numbers it was decided to combine the Spirit of Progress and Southern Aurora into one train, the Sydney/Melbourne Express. The Spirit of Progress ran for the last time on 2 August 1986.[26][27]

Intercapital Daylight

The Inter-Capital Daylight was a daytime express passenger train that operated between Australia's two largest cities, Sydney and Melbourne

On 26 March 1956, the New South Wales Government Railways and Victorian Railways introduced connecting daytime services named the Sydney–Melbourne (Melbourne–Sydney) Daylight Express.[28] Following the completion of the standard gauge to Melbourne, the New South Wales train was extended to Melbourne from 16 April 1962 and named Inter-Capital Daylight.[29] With deregulation of the Australian airline industry in the 1990's, patronage dropped to around 30%. A decision was made to cancel the service with the last service operating on 31 August 1991.[30]

Southern Aurora

The Southern Aurora was an overnight express passenger train that operated between Australia's two largest cities, Sydney and Melbourne. First-class throughout, including the dining facilities, the Southern Aurora featured all-sleeper accommodation.

The train first ran on 13 April 1962 after the opening of the standard gauge line from Melbourne to Albury,[31] eliminating the break-of-gauge between the capital cities.[32] The Southern Aurora ran for the last time on 2 August 1986.[33][27]

Sydney–Melbourne Express

The Sydney–Melbourne Express was an overnight intercapital passenger train service that operated between Australia's largest two cities, Sydney and Melbourne, the name depended on the direction of travel, with the train nicknamed the 'Sex' or 'Mex'.[26][27]

The Sydney–Melbourne Express was formed to replace the Spirit of Progress and Southern Aurora to cut operating costs of the intercapital rail service with the first train operating on 2 August 1986. The last Melbourne Express ran on the night of 20 November 1993 ex Sydney, with the last Sydney Express running ex Melbourne on 21 November.[27]

XPT

In November 1993, XPTs replaced locomotive hauled stock on the overnight Sydney/Melbourne Express.[34] In December 1994 an XPT daylight service to Melbourne was introduced by extending the Riverina XPT from Albury.[35]

The entire line is used by NSW TrainLink Southern services to, and from, Sydney (Central), which makes limited stops on this section. The services are run using New South Wales XPT diesel-powered passenger trains.

Freight

Operators

New South Wales operators

OperatorAssumed operationsCeased operationsLength of operations
Department of Railways New South Wales3 January 196219 October 197210 years
Public Transport Commission, NSW20 October 197230 June 19807 years
State Rail Authority, NSW1 July 198016 January 19898 years
State Rail Authority (as CountryLink)16 January 198931 December 200314 years
RailCorp (as CountryLink)1 January 200430 June 20139 years
NSW TrainLink30 June 2013incumbent10 years (ongoing)

Victorian operators

OperatorAssumed operationsCeased operationsLength of operations
Melbourne and Essendon Railway Company21 October 18601 July 18643 years
Victorian Railways31 October 186730 June 1983115 years
Metropolitan Transit Authority (The Met)1 July 198330 June 19895 years
State Transport Authority (V/Line)1 July 198330 June 19895 years
Public Transport Corporation (The Met)1 July 198930 June 19988 years
Public Transport Corporation (V/Line)1 July 198919955 years
Public Transport Corporation (V/Line Passenger)199530 June 19983 years
Bayside Trains1 July 199829 August 199913 months
V/Line Passenger1 July 199829 August 199913 months
National Express (as Bayside Trains)29 August 1999October 200013 months
National Express (as V/Line Passenger)29 August 199922 December 20023 years
National Express (as M>Train)October 200022 December 200226 months
M>Train22 December 200218 April 200415 months
V/Line Passenger22 December 20021 July 20107 years
Connex Melbourne18 April 200429 November 20095 years
Metro Trains Melbourne30 November 2009incumbent14 years (ongoing)
V/Line1 July 2010incumbent13 years (ongoing)

Stations

BG

Station Histories (broad gauge only)
StationOpened[36][37]Closed[36][37]AgeNotes[36][37]
Flagstaff27 May 198538 years
Melbourne Central26 January 198143 years
  • Formerly Museum
Parliament22 January 198341 years
Flinders Street12 September 1854169 years
  • Formerly Melbourne Terminus
Southern Cross (BG)17 January 1859165 years
  • Formerly Batman's Hill
  • Formerly Spencer Street
North Melbourne6 October 1859164 years
Kensington1 November 18601 July 18643 years
9 October 1871152 years
Newmarket1 November 18601 July 18643 years
9 October 1871152 years
Ascot Vale1 November 18601 July 18643 years
9 October 1871152 years
Moonee Ponds1 November 18601 July 18643 years
9 October 1871152 years
Essendon1 November 18601 July 18643 years
9 October 1871152 years
Glenbervie11 September 1922101 years
Strathmore28 October 1890133 years
  • Formerly North Essendon
Pascoe Vale10 November 1885138 years
Oak Park13 August 195667 years
Glenroy24 January 1887137 years
Jacana15 February 195965 years
Broadmeadows (BG)1 February 1873151 years
Broadstore Siding12 October 1942c. 1980'sApprox. 37 years
Coolaroo6 June 201013 years
Roxburgh Park18 April 187224 September 196391 years
  • Was originally Somerton
1 October 200716 years
  • Reopened as Roxburgh Park
Somerton Yard (BG)30 June 1889134 years
Craigieburn18 April 1872152 years
Donnybrook14 October 1872151 years
Beveridge14 October 18722 April 1990117 years
Wallan18 April 1872152 years
Lightwood189024 April 194150 years
  • Formerly Merri Merri Siding
  • Formerly Merri
  • Formerly Merri Siding
Heathcote Junction17 March 1890134 years
  • Formerly Kilmore Junction
Wandong11 April 1876148 years
  • Also known as Morpeth's Siding
Mathieson's Siding12 August 1885?
  • Was originally Wandong Ballast Pits Siding
2 July 188826 February 192435 years
  • Reopened as Mathieson's Siding
Kilmore East18 April 1872152 years
  • Formerly Kilmore
Kilmore East Quarry Siding13 September 197647 years
Broadford18 April 1872152 years
McDougall's Siding26 March 189013 January 198796 years
  • Formerly McDougall
Lowry's Siding19 November 1888c. 31 May 1909Approx. 20 years
Tallarook18 April 1872152 years
Dysart18 April 187220 August 18724 months
  • Was originally Schoolhouse Lane
1 June 18893 May 198797 years
  • Formerly Schoolhouse Lane
  • Also known as Dysart Military Siding
Seymour (BG)26 August 1872151 years
Gravelside Siding24 June 1885c. 6 December 1890Approx. 5 years
  • Was originally Gravel Pit Sidings
7 August 189411 January 193843 years
  • Formerly Gravel Pit Sidings
Mangalore13 January 1880c. 5 October 1982Approx. 102 years
Avenel (BG)20 November 18729 November 2008135 years
Monea27 February 188213 June 196078 years
Locksley18 October 18821 April 197390 years
  • Formerly Burnt Creek Wood Siding
  • Formerly Burnt Creek
Longwood20 November 1872c. 5 October 1982Approx. 109 years
Creighton9 February 18871 September 197083 years
  • Formerly Synon's Siding
  • Formerly Creighton's Creek
Euroa (BG)20 March 18739 November 2008135 years
Balmattum12 March 188924 July 196576 years
Violet Town (BG)20 March 18739 November 2008135 years
Burkes Hill Siding25 April 18895 February 189233 months
13 October 189914 July 190233 months
Baddaginnie19 June 18827 May 197895 years
Hanson's Siding3 May 1904c. 3 February 1925Approx. 20 years
  • Formerly Caelli's Siding
Benalla (BG)18 August 18739 November 2008135 years
Winton9 December 18771 May 197193 years
Head's Siding9 September 1907c. 20 Oct 1942Approx. 35 years
  • Formerly Head and Green's Siding
Glenrowan2 November 1874c. 5 October 1982Approx. 107 years
Alumatta Siding17 June 1882c. 1908Approx. 25 years
  • Was originally Wangaratta Meat Siding
16 April 194316 August 198946 years
  • Reopened as Alumatta Siding
Wangaratta (BG)28 October 18739 November 2008135 years
Bowser2 February 18911 October 197281 years
  • Formerly Beechworth Junction
Springhurst (BG)29 November 18739 November 2008134 years
  • Formerly Springs
  • Also known as Bontherambo or Naringa
Barambogie Ballast Siding1874187624 months
  • Was originally Doma Mungi Siding
February 19227 April 193311 years
  • Reopened as State Rivers & Water Supply Commission's Siding
7 January 193514 September 196025 years
  • Reopened as Chiltern Valley Siding
Chiltern (BG)c. 18739 November 2008Approx. 135 years
Barnawarthac. 187326 October 1986Approx. 113 years
Wodonga West?1899
Wodonga (BG)21 November 18739 November 2008134 years
Wodonga Coal Siding (BG)7 August 19169 November 200892 years
  • inc. Bogie exchange area
Albury (BG)14 June 18839 November 2008125 years

SG

Station histories (standard gauge only)
StationOpened[36][37]Closed[36][37]AgeNotes[36][37]
Southern Cross (SG)16 March 196262 years
  • Formerly Spencer Street
Victoria Dock (Westgate)?
Appleton Dock?
Swanson Dockc. 1969Approx. 55 years
Melbourne Yard?
Melbourne Steel Terminal1995201520 years
South Dynon196460 years
North Dynon?
Sunshine (SG)January 1963200441 years
McIntyre Sidings12 May 196460 years
  • Formerly Lysaght's Siding
Broadmeadows (SG)200915 years
Somerton Yard (SG)5 August 196261 years
Seymour (SG)197450 years
Avenel (SG)August 201013 years
Euroa (SG)August 201013 years
Violet Town (SG)August 201013 years
Benalla (SG)10 March 196460 years
Wangaratta (SG)10 March 196460 years
Springhurst (SG)August 201013 years
Chiltern (SG)August 201013 years
SCT BarnawarthaOctober 20167 years
Wodonga (SG)25 June 201112 years
Wodonga Coal Siding (SG)7 August 19161 September 200993 years
  • inc. Bogie exchange area
Albury (SG)3 February 1881143 years

Infrastructure

Branch lines

South of Craigieburn

In October 1889, the Upfield railway line was extended to Somerton, but closed in July 1903. In March 1928, despite strong resistance from the Railways Commissioners, the state government ordered the reopening of the section from Fawkner to near Somerton for passengers,[38] although no actually connection was provided at this time.In May 1956, the line from Fawkner to Somerton was again closed, but only three years later, in July 1959, the Upfield to Somerton section reopened for goods trains.[39] In January 1963, the line from Somerton to the Ford factory was re-laid as dual gauge gauntlet track, a year after the North East standard gauge line through Somerton opened.

A branch line was opened during the Second World War to Broadstore, designed to connect Broadmeadows station with the Maygar Barracks. The line opened on 12 October 1942 and remaining in operation until 1982, when usage of the base began to.[40]

Between Craigieburn and Seymour

A branch line opened from Heathcote Junction (near Kilmore) to Kilmore in 1888 and to Tooborac in 1890, connecting with a line from Bendigo to Heathcote opened a little earlier. The Heathcote Junction – Heathcote line closed in 1968. A branch line from Kilmore to Lancefield opened in 1892, closed in 1904.

The Mansfield line opened from Tallarook to Yea in 1883, Molesworth in 1889, Cathkin and Merton in 1890 and Mansfield in 1891. It is now closed. A branch line was built from Cathkin to Koriella in 1890 and Alexandra in 1909. This line closed in 1978.

North of Seymour

The Tocumwal line opened from Mangalore to Toolamba, Shepparton and Tocumwal in 1880.

A branch line opened from Benalla to St James in 1883, Yarrawonga in 1886 and Oaklands in 1938, with a break of gauge there until the State Rail Authority line closed south of Boree Creek. A second 18+14-mile (29.4 km) branch line from Benalla to Tatong was opened in 1914 and closed in 1947. In 2008 with the gauge conversion the Albury line from broad gauge to standard gauge would have left the Oaklands branch as an isolated and useless spur.[41] The local MP reported that the cost of converting this 125 km (77.7 mi) branch to standard gauge was just over $13m.[42] In October 2008 the Victorian State Government announced that an upgrade would take place.[43] The conversion was completed in December 2009.

The narrow-gauge Whitfield branch line opened from Wangaratta to Whitfield in 1899, closing in 1953.

A branch line opened from Bowser (north of Wangaratta) to Everton in 1875, which was extended to Beechworth in 1876 and Yackandandah in 1891. The line closed in 1954. Another branch line was built from Everton to Myrtleford in 1883 and Bright in 1890, now closed.

A short line to Peechelba East, which opened in 1928 and closed in 1986, also branched from Bowser.

A short branch line opened from Springhurst via Rutherglen to Wahgunyah in 1879. Services were suspended in 1995.

A branch line opened from Wodonga to Tallangatta between 1889 and 1891, Shelley in 1916, Beetoomba in 1919 and Cudgewa in 1921.[44] A connection from Albury was added near Wodonga, creating a turning triangle to enable the Sydney Limited and its successor Spirit of Progress with their observation cars to be turned as complete trains. part of the line was converted to dual gauge in 1944 to serve freight depots around Bandiana. The line closed beyond Bandiana in 1981,[45] and the connection to Wodonga later removed, with only standard gauge traffic continuing to use the line via Albury.[46] The Wodonga-Bandiana section closed on 1 September 2009 as part of the Wodonga Rail Bypass project.[47]

Signalling

Maintenance

Alongside the passenger trains, North East line tracks and equipment are maintained by a fleet of engineering trains. The two types of engineering trains are: the shunting train, designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives; and the infrastructure evaluation carriage designed for general infrastructure evaluation including track and electrical infrastructure (if travelling along electrified corridors).[48] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[48]

References

External links

Further reading

  • Turton, Keith W. (1973). The North East Railway. (A Lineside Guide) Melbourne to Wodonga. Australian Railway Historical Society (Victorian Division). ISBN 0-85849-013-7.
  • John C. Jennings and Robert K. Whitehead (July 2005). Seymour - A Railway Town. Seymour and District Historical Society. ISBN 0-9751658-0-1.
  • Turton, Keith W. (1973). Six And A Half Inches From Destiny. The first hundred years of the Melbourne-Wodonga Railway 1873-1973. Australian Railway Historical Society (Victorian Division). ISBN 0-85849-012-9.
  • Covell, C.M. (November 1967). "Some Impressions and Reflections of the North-Eastern Line". Australian Railway Historical Society Bulletin. pp. 230–244.