Solar power in Bulgaria

Solar power generated 12% of Bulgaria’s electricity in 2023.[1]

Solar potential in Bulgaria

By the end of 2020 about 1 GW of solar PV had been installed.[2] It has been estimated that there is potential for at least another 4 GW by 2030.[3]

On March 13, 2023, peak photovoltaics power was 30% of Bulgaria electricity generation. However, long-term share of solar power is much lower. Director of Bulgarian transmission network estimated photovoltaics growth as 30% in 2022, also he expects 700 MW new solar capacity in 2023, which could represent 30-40% YoY growth.

In April 2023 Bulgaria's Inercom signed contract with Huasun for supply of 1.5GW solar modules.

History

Solar installation, Aytos

Solar power in Bulgaria has expanded by 100 megawatts (MW) in 2011. A 16.2 MW solar power plant in Zdravetz, Bulgaria was expected to be completed in June 2012, with power being sold for $0.30/kWh in a fixed rate 20 year power purchase agreement.[4]

Since then, however, new installations have nearly come to a halt with only about 12 MW of additional capacity installed during 2013 and 2014.

YearPhotovoltaics
MWpGWh
20081.4
20095.73.3
20103515
2011141120
20121,010n.a.
20131,0201,349
20141,0221,245
2015[5]1,0411,391
2016[6]1,0431,392
2017[7]1,0461,408
2018[8]1,0521,381
2019[9]1,0591,252
2020[10]1,1211,478
2021[11]1,2461,488
2022 [1]1,948
Source: IEA-PVPS/EPIA for capacity,[12] Photovoltaic Barometerfor generation,[13] previous[14][15][16][17]

Current and upcoming projects

PV Power stationLocationCapacity in

MWp

CommissioningNotes/Ref
Karadzhalovo Solar ParkKaradzhalovo602012
Pobeda Solar ParkPleven Province512012
Verila Solar 1Dupnitsa Municipality1242023[2]
Bobov Dol Solar ParkGolemo Selo1002024[3]
KyustendilKyustendilMore than 100Concept stage[4]
Ogosta floating solar parkOgosta Reservoir500 to 800Concept stage[5]
Verila Solar 2Dupnitsa Municipality502023[6]
Chirpan solar power plantChirpan1602024[7]
Dalgo Pole PV park (Phase 1,2,3)Kaloyanovo Municipality2082023[8][9]
Knizhovnik Solar PV ParkHaskovo Province400Concept stage[10][11][12]
Tenevo solar power plantYambol Province2382025[13][14]
Apriltsi Photovoltaic ParkPazardzhik Province3002023[15]
Galabovo Solar PV ParkGalabovo1502023[16][17]
Terasol Solar ParkStara Zagora Province1162023[18]
Ravnets PV Solar + Hydrogen ParkRavnets Air Base120Concept stage[19]
"Golf" PV ParkSliven Municipality402023[20]
Winslow PV ParkMalko Tarnovo362023[21]
Gabare PV ParkByala Slatina Municipality450Concept stage[22]
Aratiden PV ParkKyustendil1002024[23]
Saint George solar parkSilistra Province2292024[24]
Hadjidimitrovo-KronosKazanlak802024[25]
Belozem Solar Park 2Stara Zagora Province1002024[26]
Tsenovo SolarTsenovo, Ruse Province802025[27]

See also

References