South Station (subway)

South Station (also signed as South Station Under) is a transfer station on the MBTA rapid transit Red Line and bus rapid transit Silver Line, located at Summer Street and Atlantic Avenue in downtown Boston, Massachusetts. It is a part of the South Station complex, the second busiest transportation center in New England.[4] Eight MBTA Commuter Rail and three Amtrak intercity rail services terminate at South Station; many of those passengers then transfer to the rapid transit lines to reach other destinations in the city. With 24,639 daily boardings in 2019, South Station is the busiest station on the MBTA rapid transit system.[3]

South Station
A southbound Red Line train departing South Station in May 2024
General information
Other namesSouth Station Under
LocationAtlantic Avenue and Summer Street
Boston, Massachusetts
Coordinates42°21′09″N 71°03′19″W / 42.35261°N 71.05536°W / 42.35261; -71.05536
Line(s)Cambridge-Dorchester Tunnel (Red Line)
South Boston Transitway (Silver Line)
Platforms2 side platforms (Red Line)
2 side platforms (Silver Line tunnel)
1 side platform (Silver Line street)
Tracks2 (Red Line)
ConnectionsBus transport MBTA bus: 4, 7, 11
Mainline rail interchange MBTA Commuter Rail and Amtrak at South Station
Bus transport Intercity buses at South Station Bus Terminal
Construction
Structure typeUnderground
Bicycle facilities"Pedal and Park" bicycle cage
AccessibleYes
History
OpenedAugust 22, 1901 (Atlantic Avenue Elevated)[1]
December 3, 1916 (Red Line)[2][1]
December 17, 2004 (Silver Line)[1]
ClosedSeptember 30, 1938 (Atlantic Avenue Elevated)[1]
Rebuilt1988–1993, 2002–2004
Passengers
FY201924,639 (weekday average boardings)[3]
Services
Preceding station MBTAFollowing station
Downtown Crossing
toward Alewife
Red LineBroadway
toward Ashmont or Braintree
TerminusSilver LineCourthouse
Silver LineCourthouse
Silver LineCourthouse
toward Chelsea
Chinatown
One-way operation
Silver Line
(at surface stop)
Terminus
Chinatown Gate
toward Nubian
Former services
Preceding station MBTAFollowing station
TerminusSilver Line
Closed 2009
Courthouse
toward City Point
Preceding stationBoston Elevated RailwayFollowing station
TerminusAtlantic Avenue Elevated
Closed 1938
Rowes Wharf
Dover
toward Dudley
Atlantic Avenue Elevated
Rush hours only
Closed 1938
Location
Map

Station layout

A Silver Line bus at South Station in March 2023

South Station has three underground levels. The Red Line runs under Summer Street at the lowest level, with two side platforms serving the line's two tracks. The Silver Line runs under Atlantic Avenue on the middle level, with two side platforms serving the subway. A fare mezzanine is just below street level, with stairs, escalators, and elevators to the platforms below. It has entrances at street level on all four corners of the intersection of Summer Street and Atlantic Avenue, with elevators at the north and south corners.[5] An accessible passage also connects the mezzanine with the interior of the South Station terminal, served by Amtrak and MBTA Commuter Rail trains.

Silver Line route SL4 runs on the surface rather than the underground busway; it stops on Essex Street at Atlantic Avenue.[6][7] MBTA bus routes 4, 7, and 11 stop on Summer Street near Atlantic Avenue.[8] South Station Bus Terminal, the main intercity bus terminal in Boston, is located over the South Station platforms.

History

In this early 1900s view, the Atlantic Avenue Elevated passes in front of South Station. The old elevated station is on the far right.

A station serving South Station was located on the Atlantic Avenue Elevated. Service on the Atlantic Avenue "El" was discontinued on September 20, 1938. The structure itself was torn down in the spring of 1942. Before stairs were added, passengers wishing to change lines from the underground station—itself opened on December 3, 1916—had to use a paper transfer and go outside to change trains.[9] The underground station had four staircases and one escalator leading from the surface to the mezzanine, and two exit escalators.[10]

In 1957, the original fare lobby and the rounded top of the tunnel to the west were removed during construction of the Dewey Square Tunnel. The tunnel was rebuilt with a flat ceiling, while the fare lobby was moved to the east closer to the South Station headhouse.[11] In the 1970s, an artwork by Sylvana Cenci entitled Wheels in Motion was placed in the station. Cenci created the artwork by using explosives to warp a steel plate. She had previously been runner-up in a 1971 competition for public art at State station.[12][13]

Tile mosaic being restored in 2005

A second renovation began around 1980. An entrance was also added to the Federal Reserve Bank Building as well as a passageway under Summer Street connecting the other street entrances. In 1985, the Red Line platforms were extended 60 feet on either end to allow 6-car trains.[9] A passageway between the Red Line lobby and the interior of South Station opened in June 1990.[14]

The final renovation was triggered by the Big Dig highway project. Since the Red Line tunnel beneath Summer Street is perpendicular to Atlantic Avenue, where the new I-93 northbound tunnel was to be built, builders had to tunnel under the tracks. After the first tunnel was complete, another tunnel was added along with a station for the Silver Line. Since the new tunnel was built at the former fare level, another fare level was constructed a level above. This allowed combined access for the Silver and Red lines. The original lobby that was destroyed was replaced by stairways.[9] This project was completed at a cost of $35 million.[15] An additional $13 million renovation of the Red Line level was undertaken.[16]

After the first sections of the Silver Line opened in 2002 and 2004, a Phase III was proposed which would build a tunnel connecting South Station and the South Boston Waterfront section with the Washington Street section of the line. In 2010, the project was placed on indefinite hold.[17] However, route SL4, operating to a surface stop on Essex Street at Atlantic Avenue, began service on October 13, 2009.[7]

In early 2005, a blue and white tile mosaic reading 'South Station Under' was discovered during renovations to the Red Line platform. The MBTA had the mosaic restored to its original condition during the project.[18] Network, a 650-square-foot (60 m2) glass mosaic map by Ellen Harvey, was built on the interior walls of the northeast headhouse in 2019.[19] Plans for wayfinding signage, lighting, and other station improvements were completed by May 2021.[20]

References