Sri Damodaram Sanjeevaiah Thermal Power Station[1] is located in Nelatur Village,[2] near Krishnapatnam and at a distance of 23 km from Nellore city of Andhra Pradesh. The power plant is one of the coal-based power plants of Andhra Pradesh Power Development Company Limited (APPDCL). It is the Special Purpose Vehicle (SPV), a joint venture company of APGENCO (with 50% equity) and IL AND FS (50% equity) partnership.[3]

Sri Damodaram Sanjeevaiah ultra mega super critical Thermal Power Station
Map
CountryIndia
LocationNellore, Andhra Pradesh
Coordinates14°19′N 80°06′E / 14.31°N 80.10°E / 14.31; 80.10
StatusUnder Construction
Construction cost84,322.0 million (US$1.0 billion)
Owner(s)Andhra Pradesh Power Development Company Limited (APPDCL)
Operator(s)APGENCO
Thermal power station
Primary fuelCoal
Power generation
Units operational3 × 800 MW = 2400 MW Ultra mega super critical Thermal Power Station-APPDCL
Nameplate capacity2400 MW

The proposed capacity of plant is 1600 MW. The project is under construction and likely to be completed by the end of 2014. The Power station is designed for blended coal in the ratio of 70% washed domestic coal from Talcher Coalfield to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5 km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC contract for the main plant has been awarded to BHEL, L&T and Tata Projects Limited during July, 2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.[4]

Etymology

In view of the exemplary Statesmanship and dedicated services rendered to the state by late Sri. Damodaram Sanjeevaiah, Former Chief Minister of Andhra Pradesh, the Govt.of Andhra Pradesh ordered ∃∈ 1600 MW Thermal Power Project proposed to be named as "Sri.Damodaram Sanjeevaiah Thermal Power Station".

Capacity

StageUnit NumberInstalled Capacity (MW)Date of CommissioningStatus
I18002014, march 31Operational [5]
I28002014 December 16Operational [6]
II1800Work StartedEPC contracted to TATA, Boiler and Turbine Generator Contract to BHEL [7]

References


🔥 Top keywords: Main PageSpecial:SearchPage 3Wikipedia:Featured picturesHouse of the DragonUEFA Euro 2024Bryson DeChambeauJuneteenthInside Out 2Eid al-AdhaCleopatraDeaths in 2024Merrily We Roll Along (musical)Jonathan GroffJude Bellingham.xxx77th Tony AwardsBridgertonGary PlauchéKylian MbappéDaniel RadcliffeUEFA European Championship2024 ICC Men's T20 World CupUnit 731The Boys (TV series)Rory McIlroyN'Golo KantéUEFA Euro 2020YouTubeRomelu LukakuOpinion polling for the 2024 United Kingdom general electionThe Boys season 4Romania national football teamNicola CoughlanStereophonic (play)Gene WilderErin DarkeAntoine GriezmannProject 2025