Uttar Pradesh Rajya Vidyut Utpadan Nigam

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is wholly owned state thermal power utility with present generating capacity of 6134 MW, operating 4 Thermal Power Stations within Uttar Pradesh.

Uttar Pradesh Rajya Vidyut Utpadan Nigam
Native name
उत्तर प्रदेश राज्य विद्युत उत्पादन निगम लिमिटेड
Company typePublic
IndustryElectric power
Founded25 August 1980; 43 years ago (1980-08-25)
Headquarters,
OwnerGovernment of Uttar Pradesh
Websiteuprvunl.org

UPRVUNL was constituted on dated 25.08.1980 under the Companies' Act 1956 for construction of new thermal power projects in the state sector. On 14 January 2000, in accordance to U.P. State Electricity Reforms Acts 1999 and operation of U.P. Electricity Reforms Transfer Scheme 2000, U.P. State Electricity Board (U.P.S.E.B.), till then responsible for generation, transmission and distribution of power within the state of Uttar Pradesh, was unbundled and operations of the state sector thermal power stations were handed over to UPRVUNL. Unchahar Thermal Power Station - 420 MW (2X210) & Tanda Thermal Power Station 440 MW (4X110) were transferred to NTPC in year 1992 & year 2000 respectively before unbundling of U.P. State Electricity Board (UPSEB) into

  1. Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL)
  2. Uttar Pradesh Power Corporation Limited (UPPCL)
  3. UP Power Transmission Corporation Limited (UPPTCL)
  4. UP Jal Vidyut Nigam Limited (UPJVNL)

Power plants

Present Installations- (7133 MW)

At present,As of 2023 UPRVUNL is looking after generations of power of five thermal power plants located in different parts of Uttar Pradesh, with a total installed generation capacity of 6134 MW.

Though installed capacity is 6134 MW but UPRVUNL is not able to utilize its full capacity ever due poor maintenance, lack of funds, aging plants & frequent units tripping.

Future Expansions

Construction Stage- (8865 MW)

Proposed - (1320 MW)

Past Transitions (1990 MW)

Erstwhile Uttar Pradesh State Electricity Board (UPSEB) transferred its thermal power stations among others to NTPC Limited against payment overdue. These power stations are;

Human resources

As on 01.03.2022 UPRVUNL has 1533 executives and 4659 non-executives on its roll.[7]