Vanaz is the elevated western terminal metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[1] From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College.[2] The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic.[3] Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.[4]
Vanaz | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Pune Metro station | |||||||||||
General information | |||||||||||
Location | Alkapuri Society, Kothrud, Pune, Maharashtra 411038 | ||||||||||
Coordinates | 18°30′26″N 73°48′19″E / 18.50710°N 73.80527°E | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Operated by | Pune Metro | ||||||||||
Line(s) | Aqua Line | ||||||||||
Platforms | Side platform Platform-1 → Ramwadi Platform-2 → Train Terminates Here | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | VNZ | ||||||||||
History | |||||||||||
Opened | 6 March 2022 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
It is the only station to have 3 levels, two concourses and one platform level. The lower concourse is unfinished and will be opened afterwards.
Station layout
Vanaz track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound | Towards → Ramwadi next station is Anand Nagar | |
Platform 2 Westbound | Towards ← Train Terminates Here | |
Side platform | Doors will open on the left | ||
L3 |
The track beyond the station leads to Vanaz Depot and the DPR for a planned extension to Chandani Chowk is underway.