Dhaka Metro Rail

The Dhaka Metro Rail (Bengali: ঢাকা মেট্রোরেল), or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital and largest city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited (DMTCL).[2] Together with the under construction Dhaka BRT, proposed Dhaka Subway and Dhaka suburban circular rail, it is expected to reduce traffic congestion in the city. The metro rail network has five planned lines which are the MRT Line 6, the only operational line, MRT Line 1 and MRT line 5, which are under construction, and MRT Line 2 and MRT Line 4, which are in the planning stages. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority (DTCA).[7][8]

Dhaka Metro Rail
Top: Outside view of Farmgate metro station Bottom: Train entering at the platform of Agargaon metro station
Top: Outside view of Farmgate metro station
Bottom: Train entering at the platform of Agargaon metro station
Overview
Native nameঢাকা মেট্রোরেল
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Transit typeMass Rapid Transit
Number of lines
  • 1 operational
  • 3 under construction
  • 2 planned
Line numberOperational:Ongoing projects:Approved:Planned:
Number of stations16 (operational)[1], 103 (planned)[2]
Daily ridershipest. 290,000
Key people
  • Md. Nazrul Islam (Chairman)
  • M. A. N. Siddique (Managing Director)[3]
HeadquartersProbashi Kallyan Bhaban (Level-14), 71,72, Old Elephant Road, Eskaton Garden, Ramna, Dhaka-1000 [4]
Websitewww.dmtcl.gov.bd
Operation
Began operation29 December 2022; 16 months ago (2022-12-29)
Operator(s)Dhaka Mass Transit Company Limited
Number of vehiclesMRT 6: 12 pairs of trains (total 24 trains)[5]
Train length6 coaches
Technical
System length20.1 km (12.5 mi)
Track gaugeStandard gauge
Electrification1500V DC via Overhead (Elevated)
(Underground)
Average speed30 km/h (19 mph)[6]
Top speed100 km/h (62 mph)[6]

The first section of MRT Line 6 commenced commercial operations on 29 December 2022, and the second section on 5 November 2023. The other lines are either in planning or under construction.[9][10] The third phase, which will have an interchange with Line 1, Line 2 and Line 4, is set to be completed by 2026.[11][12][13] Further expansion of MRT Line 6 is expected towards Savar Upazila and Tongi. Passengers will get a 10% discount on the fare for using the MRT Pass or Rapid Pass.[14][15] MRT line 6 currently operates daily except Fridays from 7:30 am to 9:00 pm (7:10 am to 9:40 pm for MRT Pass/Rapid Pass holders).[16] Each of the metro train has a separate coach for women along with common coaches.[17]

History

To implement Dhaka's 20-year-long Strategic Transport Plan, the Government of Bangladesh invited the Japan International Cooperation Agency to conduct a primary survey and feasibility study on the transport system of Dhaka in 2009–2010. In 2012, the Executive Committee of the National Economic Council approved the project. A loan agreement between the Bangladeshi government and the Japanese International Cooperation Agency was signed in January 2013.

Dhaka Mass Transit Company Limited, the agency responsible for the implementation of the first metro line, was formed in January 2013. The General Consultant, namely the NKDM Association, commenced work beginning in February 2014. In June 2013, Dhaka Mass Transit Company Limited was established by the Government to implement the Metro Rail Lines across the city.[18].Dhaka metro rail was opened by PM Sheikh Hasina on 29 December 2022.

History of MRT Line-6

Construction

Line-6 under construction in 2020

The deal for the construction of the MRT Line-6, costing US$2.8 billion, was signed by the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.[19] Construction began on 26 June 2016 with an inauguration ceremony presided over by the prime minister Sheikh Hasina.[20] Civil engineering work was done by the Italian-Thai Development Public Company Ltd. and China's Sinohydro Corporation Ltd. JV, and a Tokyo-based construction company developed the depot's land.[21][22]

Construction work was divided into eight packages, covering aspects like depots, stations and rolling stock.[23]

Planning

When construction commenced in 2016, the Metro Rail was expected to open by the end of 2019.[20] By 2018, this expectation was still held to, but by 2019, completion of phase one was delayed to December 2021.[24] In 2018, the second phase was expected to be complete by December 2020.[24][25] Eventually, these dates were pushed back, with phase one opening in 2022 and phase two expected in 2023.[26] The main reason for the delays from 2020 to 2022 was the COVID-19 pandemic.[27]

Cost and length changes

Originally, the project cost was Tk 219,850 million but it was later increased by Tk 114,870 million to Tk 334,720 million, although the full Project is not yet completed. The first route, originally projected to start from Uttara, a northern area of Dhaka, to Sayedabad, in the south of the capital,[28] was eventually extended north to Uttara and truncated south to Motijheel.[29] The original length which was 20.10 km (12.49 mi) has been increased by 1.16 km to 21.26 km (13.21 mi). It was planned to have 16 stations originally but it has been increased to 17 stations.[30]

Misconceptions

The project was originally reported to be a 27 km (17 mi) underground metro rail line. It was later confirmed to be an elevated and underground metro rail project.[31] In 2014, it was reported that 56 trains would run on the metro system.[32] It was confirmed that 24 vehicles would run on the MRT Line-6.[24] It was planned to have six lines.

Trial runs

MRT Line-6's train made its first run on 29 August 2021. It traveled from Diabari Depot to Mirpur 12. It successfully made its second run on 29 November 2021. It traveled from Uttara to Mirpur 10. The line's train made its longest trial run on 12 December 2021. It traveled from Uttara to Agargaon. The train ran for 11.3 km (7.0 mi). It ran at 100 km/h for 9 km (5.6 mi) and ran at 15–20 km (9.3–12.4 mi) for the rest.[33]

Architecture

Multiple-use MRT Pass contactless smart card of Dhaka Metro Rail which is also Rapid Pass compatible.

Line 6 consists of 16 operational elevated stations of 180m length each, and 20.1 km (12.5 mi) of electricity-powered light rail tracks. All of line 6, save for the depot and some of its accompanying LRT, will be elevated above current roads. Mostly, this will be above road medians to allow traffic flow underneath, with stations also elevated. The Dhaka Metro is projected to serve more than 60,000 passengers per hour by 2022, with headways of approximately 4 minutes.[34] The entire route can be travelled in less than 40 minutes at a speed of 100 km/h (62 mph), and is expected to drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long standstills.[35][36] The system is using magnetic contactless Integrated Circuit Ticketing, commonly known as smart cards.[8] Platform screen door (PSD) barriers used at the platform level will increase safety and increase efficiency.[8]Trains of six spacious air-conditioned cars will arrive every four minutes going each way at each of the 16 stations.[36]

The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a consortium of foreign and Bangladeshi firms known as the NKDM Association is acting as the project's general consultant. The NKDM Association consists of Nippon Koei Japan and Development Design Consultants (local consultant - Bangladesh).

Infrastructure

Rolling stock

Japan-based Kawasaki Heavy Industries made Rolling stock for Dhaka Metro with latest technology and necessary security equipments. The body of this air-conditioned train is made of light and durable stainless-steel.[37][38]

Network

Planned network map of Dhaka Metro Rail

Operational

Operational
LineFirst runStationsNumber of StationsLength (km)TerminalsInterchange StationsDepot
MRT 6
First Phase
29 December 2022Uttara North, Uttara Center, Uttara South, Pallabi, Mirpur-11, Mirpur-10, Kazipara, Shewrapara, Agargaon[39]9[39]11.73[39]Uttara TerminalAgargaon MRT Line 5N  at Mirpur 10Diabari Depot
MRT 6
Second Phase
4 November 2023Bijoy Sarani, Farmgate, Kawran Bazar, Shahbagh, Dhaka University, Bangladesh Secretariat, Motijheel89.53Motijheel MRT Line 5S  at Kawran Bazar

 MRT Line 2  at Motijheel

Under construction/planned

Under construction/planned
LineExpected completionStationsNumber of StationsLength (km)TerminalsInterchange StationsDepot
MRT 1
(Airport Route)
2026Shahjalal International Airport Shahjalal International Airport Terminal 3, Khilkhet, Nadda, Notun Bazar, North Badda, Badda, Aftabnagar, Rampura, Malibagh, Rajarbagh, Kamalapur21[a]
31.233[a][40]
Shahjalal International AirportKamalapur MRT Line 5N  at Notun Bazar

 MRT Line 5S 

at Aftabnagar

 MRT Line 2 

 MRT Line 4 

 MRT Line 6 

at Kamalapur

Pitalganj Depot
MRT 1
(Purbachal Route)
Notun Bazar, Nadda, Joar Sahara, Boalia, Mastul, SHCS, Purbachal Centre, Purbachal East, Purbachal TerminalPurbachal Terminal MRT Line 6 

at Notun Bazar

MRT 2 (Main Line)2030Gabtoli, Dhaka Uddan, Mohammadpur, Jhigatola, Science Laboratory, New Market, Azimpur, Palashi, DHK Medical College, Gulistan, Motijheel, Kamalapur, Manda, Dakkhingaon, Damripara, Signboard, Vuighar,Jalkuri, Downtown Narayanganj2235GabtoliNarayanganj MRT Line 5N 

 MRT Line 5S 

at Gabtoli

 MRT Line 6 

at Motijheel

 MRT Line 1 

 MRT Line 4 

 MRT Line 6 

at Kamalapur

 MRT Line 4 

at Signboard

Matuail Rail Depot
MRT 2 (Branch Line)Gulistan, Golap Shah Mazar, Nayabazar, SadarghatN/A
MRT 42031Kamalapur, Sayedabad, Jatrabari, Shonir Akhra, Signboard, CTG Road, Kanchpur, Madanpur816[41]KamalapurMadanpur MRT Line 1 

 MRT Line 2 

 MRT Line 6 

at Kamalapur

 MRT Line 2 

at Signboard

Madanpur
MRT 5
(Northern Route)
2028Hemayetpur, Baliarpur, Bilamalia, Amin Bazar, Gabtoli, Darus-Salam, Mirpur 1, Mirpur 10, Mirpur 14, Kochukhet, Banani, Gulshan-2, Notun Bazar, Vatara1420HemayetpurVatara MRT Line 2 

 MRT Line 5S 

at Gabtoli

 MRT Line 6 

at Mirpur 10

 MRT Line 1 

at Notun Bazar

Hemayetpur Depot
MRT 5
(Southern Route)
2029Gabtoli, Technical Circle, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russel Square, Karwan Bazar, Hatirjheel, Tejgaon, Aftabnagar, Aftabnagar Centre, Aftabnagar East, Nasirabad, Dasherkandi1517.3GabtoliDasherkandi MRT Line 2 

 MRT Line 5N 

at Gabtoli

 MRT Line 6 

at Kawran Bazar

 MRT Line 1 

at Aftabnagar

Dasherkandi Depot
MRT 6

Third Phase

2025Kamalapur11.17Uttara TerminalKamalapur MRT Line 1 

 MRT Line 2 

 MRT Line 4 

at Kamalapur

Diabari Depot
Total104[b]128.7[c]

Official time table for Dhaka metro rail

Time Table[44]
FULL TIMETABLE
SunMonTueWedThuFriSat
  • 7:10AM to 11:00AM (peak hour) - every 10min
  • 11:01 AM to 04:00PM (off peak) - every 12min
  • 04:01PM to 09:40PM (peak hour) - every 10min
  • 7:10AM to 11:00AM (peak hour) - every 10min
  • 11:01 AM to 04:00PM (off peak) - every 12min
  • 04:01PM to 09:40PM (peak hour) - every 10min
  • 7:10AM to 11:00AM (peak hour) - every 10min
  • 11:01 AM to 04:00PM (off peak) - every 12min
  • 04:01PM to 09:40PM (peak hour) - every 10min
  • 7:10AM to 11:00AM (peak hour) - every 10min
  • 11:01 AM to 04:00PM (off peak) - every 12min
  • 04:01PM to 09:40PM (peak hour) - every 10min
  • 7:10AM to 11:00AM (peak hour) - every 10min
  • 11:01 AM to 04:00PM (off peak) - every 12min
  • 04:01PM to 09:40PM (peak hour) - every 10min
The weekly closure of Dhaka Metro service is on Friday
  • 7:10AM to 11:00AM (off peak) - every 12min
  • 11:01 AM to 09:40PM (peak hour) - every 10min

Dhaka Metro
Airport
 
 1  Airport Route
Aiport Terminal 3
 
 6 
Uttara Terminal
Khilkhet
Uttara North
Purbachal Terminal
 1  Purbachal Route
Uttara Center
Purbachal East
Uttara South
Purbachal Centre
Pallabi
SHCS
Mirpur 11
Mostul
 5  Northern
Hemayetpur
Boalia
Depot (5 Northern)
Joar Sahara
Baliarpur
Nadda
Bilamalia
Vatara
 5  Northern Route
Amin Bazar
Nutun Bazar
 1  Purbachal Route
 2   5  Southern
Gabtoli
Gulshan 2
Darus Salam
Banani
Mirpur 1
Kachukhet
Mirpur 10
Mirpur 14
Technical Circle
Kallyanpur
North Badda
Shyamoli
Badda
College Gate
Asad Gate
Dasherkandi
 5  Southern Route
Russel Square
Nasirabad
Kazipara
Aftabnagar East
Shewrapara
Aftabnagar Center
Agargaon
Aftabnagar
Bijoy Sarani
Niketon
Farmgate
Tejgaon
Karwan Bazar
Hatirjheel
Shahbagh
Rampura
Dhaka University
Malibagh
Bangladesh Secretariat
Rajarbagh
 6 
Motijheel
Kamalapur
 1  Airport Route  4   6 
 4 
Narayanganj
Chittagong Road
 2 

Lines 2, 4 and 5 (Southern) may change in the future

MRT lines

MRT Line-1

Airport Route

The construction of the 19.872 km (12.348 mi) long underground line, MRT Line-1 (Airport Route), is set to begin in December 2022, costing US$6.1 billion after many delays. Its deadline is set for 2026.[45] It will start from Shahjalal International Airport and stop at Kamalapur Railway Station. The line will have 12 underground stations. Stations will be constructed at Shahjalal International Airport, Shahjalal International Airport Terminal 3, Khilkhet, Jamuna Future Park, Notun Bazar, Uttar Badda, Badda, Hatirjheel East, Rampura, Malibagh, Rajarbagh and Kamalapur Railway Station. MRT Line-1 will have an interchange with MRT Line-6, MRT Line-2 and MRT Line-4 at Kamalapur Railway Station. There will be an interchange for the MRT Line-5 Northern Route and the MRT Line-1's Purbachal route at the Notun Bazar. Hatirjheel East of MRT Line-1 and Aftab Nagar West Station of MRT Line-5: Southern Route will have an Interchange. Above all, the airport will have an interchange of MRT Line-1 with BRT Line-3.[40] The government will provide US$1.5 billion while the Japan International Cooperation Agency (JICA) will fund US$4.6 billion.[46] The use of soundless TBMs will make it possible to build MRT-1's underground infrastructure without disrupting the daily lives of residents and businesses.

Purbachal Route

MRT Line-1 (Purbachal Route) will be 11.369 km (7.064 mi) long and it will have stations at Notun Bazar, Jamuna Future Park, Bashundhara, Police Officers’ Housing Society, Mastul, Purbachal West, Purbachal Centre, Purbachal Sector-7 and Purbachal depot. Of these stations, Notun Bazar and Jamuna Future Park would be underground as a part of the airport route.[47]

A metro station platform at night

MRT Line-2

MRT Line-2 will connect Gabtali with Chittagong Road. The stations on this route are - Gabtoli, Dhaka Uddan, Mohammadpur, Jhigatola, Science Laboratory, New Market, Azimpur, Palashi, DHK Medical College, Gulistan, Motijheel, Kamalapur, Manda, Dakkhingaon, Damripara, Signboard, Vuighar, Jalkuri and Downtown Narayanganj in the Main Line and Gulistan, Golap Shah Mazar, Nayabazar and Sadarghat in the Branch Line. The length of this line will be 22 km (14 mi).

MRT Line-4

MRT Line-4 will connect Kamalapur Railway Station with Narayanganj with elevated and underground lines (planned).[47] Length of this line will be 8 km (5.0 mi). According to a survey conducted by Japan International Cooperation Agency (JICA), MRT Line-4 will run parallel to an existing line which will be converted to a dual gauge railway line by the order of the Bangladesh Railway Authority. The stations in this line are Kamalapur, Sayedabad, Jatrabari, Shonir Akhra, Signboard, CTG Road, Kanchpur and Madanpur.

MRT Line-5

Northern Route

Construction of MRT Line-5 (Northern Route) will begin in September 2023.[48] MRT Line-5 (Northern Route) will start from Hemayetpur of Savar Upazila and end at Vatara (at Bashundhara), costing US$4.85 billion.[47] It expected to be 20 km (12 mi) long in total.[47] Northern route will be 13.5 km (8.4 mi) underground and 6.5 km (4.0 mi) elevated. It will have 14 stations, of which 9 stations will be underground. Those underground stations will be constructed at Gabtoli, Darus Salam, Mirpur 1, Mirpur 10, Mirpur 14, Kachukhet, Banani, Gulshan-2 and Notun Bazar. 5 stations will be elevated. 5 elevated stations will be constructed at Hemayetpur, Baliarpur, Bilamalia, Amin Bazar and Vatara (at Bashundhara R/A). MRT Line-5 (Northern Route) will have depot at Hemayetpur of Savar Upazila.[49]

Southern Route

The MRT Line-5 (Southern Route), which is about 17.4 km (10.8 mi) long, is expected to be operational between 2027 and 2030. It will connect Gabtoli with Dasherkandi. The stations on this route are Gabtoli, Technical, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russel Square, Karwan Bazar, Hatirjheel, Tejgaon, Aftabnagar, Aftabnagar Centre, Aftabnagar East, Nasirabad and lastly Dasherkandi. It is possible to interchange with MRT line 5 (Northern Route) and MRT line 2 at Gabtoli, interchange with MRT line 6 at Karwan Bazar.

MRT Line-6

View of Sector 15 from train window while traveling from Uttara North to Uttara Center metro station

MRT Line-6 has 17 elevated stations each 180 meters long and 21.26 km (13.21 mi) of electric light rail track (LRT). All Line-6 and some attending LRTs, except the depot, have been elevated above the existing roads to allow traffic flow below.

This line consists of five phases, of which only the first and second are currently operational.

  • Opened on 29 December 2022, from Uttara North to Agargaon with a length of 11.73 kilometres (7.29 mi).
  • Opened on 5 November 2023, from Agargaon to Motijheel,[50] which has a length of 8.37 kilometres (5.20 mi).
  • Slated for completion in December 2025, from Motijheel to Kamalapur, which will be 1.16 kilometres long (0.72 mi)
  • With construction expected to start after Phase 3, from Uttara North to Tongi, with a length of 4.61 kilometres (2.86 mi)[51][52]
  • Further extension in the north-west through Ashulia and Baipayl to Nabinagar is planned.[53]