List of Copenhagen Metro stations

There are 39 stations in the Copenhagen Metro, a driverless rapid transit system serving Copenhagen, Frederiksberg and Tårnby in Denmark.[1] Of the original 22 metro stations, nine are underground, twelve are elevated, and one is at street level.[2] Christianshavn Station offers transfer between the system's two original lines (M1 and M2), which share track between Vanløse and Christianshavn stations. From Christianshavn, M1 branches south traveling to Vestamager Station, while M2 heads southeast to Lufthavnen Station, which serves Copenhagen Airport.

Going east, the M1 and M2 run parallel from Vanløse to Christianshavn, after which they split. M1 goes south, ending in Vestamager, while the M2 goes southeast, ending in Lufthavnen. The M3 is a circle line connecting the Central Station with Østerbro, Nørrebro, and Frederiksberg.
Map of the Copenhagen Metro following the opening of the northern part of the M4 (2020)
A square steel and glass room with some people waiting. In the middle are the backs of two escalators.
Platform level at Forum Station

The City Circle Line, which opened on 29 September 2019, has 17 stations, with transfer between the current and new lines at Frederiksberg and Kongens Nytorv stations. The new lines have a stop at Copenhagen Central Station (København H), the largest train station in Denmark.[3] On 28 March 2020, the first part of the M4 line opened, adding two additional stations and an increased number of trains on the København H - Østerport part of the City Circle Line. Transfer from the Copenhagen Metro to regional trains is possible at Copenhagen Central Station, Lufthavnen, Nørreport, Ørestad and Østerport stations.[1] Transfers to S-train services are possible at Copenhagen Central Station, Nørreport, Østerport, Nørrebro, Flintholm, Vanløse and Nordhavn stations.

The Copenhagen Metro opened in 2002, with additional stations opening in 2003, and the M2 branch to the airport completed in 2007.[4] M1 and M2 are in total 21 kilometers (13 mi) long, of which 10 kilometers (6.2 mi) is in tunnels and 11 kilometers (6.8 mi) is elevated. It takes 23 minutes to travel on each line from one end to the other.[5] The City Circle Line is intended to form a 15.5-kilometer (9.6 mi) loop around the city center, with a full circumference taking 25 minutes. The M3 line follows the full circle whilst the M4 line only operates along the eastern half.[3] The system is owned by Metroselskabet, a company owned jointly by the municipalities of Copenhagen and Frederiksberg, and the government of Denmark. The metro and its 34 trains are operated by the private company Metro Service.[6]

Key

Bella Center Station

The following two lists name the stations. The first lists the stations that opened between 2002 and 2020. It states the station's name, which lines serve it, whether it is elevated or underground (the grade), travel time in minutes to Nørreport, the ticket zone and any transfer possibilities available at the station.[1][2] The second table lists those stations on the future M4 line which are yet to be built.[3][7]

Terminal station
#Transfer station

List of stations

Street-level access to Nørreport Station
Ørestad Station
StationLineGradeOpenedTime to Nørreport (M1 and M2)ZoneTransfer
Aksel Møllers Have Underground2019N/A1
Amager Strand Elevated2007103
Amagerbro Underground200251
Bella Center Elevated2002113
Christianshavn# Underground200331
DR Byen Elevated200271, 3
Enghave Plads Underground2019N/A1
Fasanvej Underground200352
Femøren Elevated2007123
Flintholm# Elevated200482S-train
Forum Underground200321
Frederiksberg# Underground200331, 2
Frederiksberg Allé Underground2019N/A1
Gammel Strand Underground2019N/A1
Islands Brygge Underground200251
Kastrup Elevated2007144
København H†# Underground2019N/A1Regional trains, InterCity, X 2000, S-train
Kongens Nytorv# Underground200221
Lergravsparken Underground200271
Lindevang Elevated200372
Lufthavnen†# Elevated2007154Regional trains,
X 2000, EuroNight,
Copenhagen Airport (air travel)
Marmorkirken Underground2019N/A1
Nordhavn# Underground2020N/A2S-train
Nørrebro# Underground2019N/A2S-train
Nørrebros Runddel Underground2019N/A1
Nørreport# Underground200201Regional trains, S-train
Nuuks Plads Underground2019N/A1
Orientkaj Elevated2020N/A1
Ørestad Elevated2002123Regional trains
Øresund Elevated200793
Østerport# Underground2019N/A1Regional trains, S-train
Poul Henningsens Plads Underground2019N/A1
Rådhuspladsen Underground2019N/A1
Skjolds Plads Underground2019N/A1
Sundby Elevated200293
Trianglen Underground2019N/A1
Vanløse†# Street Level200392S-train
Vestamager Elevated2002143
Vibenshus Runddel Underground2019N/A1

Future stations

Escalators at the underground Amagerbro Station
StationLineGradeOpensTransfer
Enghave Brygge Underground2024
Havneholmen Underground2024
Mozarts Plads Underground2024
Ny Ellebjerg†# Underground2024S-train, regional trains
Sluseholmen Underground2024

Terminal station.# Transfer station.

The M4 was originally planned to service Trianglen, Poul Henningsens Plads, Vibenshus Runddel and Nørrebro stations on a temporary basis. This plan was later abandoned. Since its opening, the M4 serves the København H - Østerport - Orientkaj route. The City Circle Line opened on 29 September 2019 and two Nordhavn stations opened on 28 March 2020. An extension with five Sydhavn stations (Ny Elleberg - København H) is expected to open in 2024.

The Nordhavn end of the M4 has 2 stations,[8] while the Sydhavn end will have 5 stations.[9]As the built up areas of Nordhavn expand towards the North-East, no less than 9 versions of a future extension have been examined.[10]

References

External links