List of rail transit stations in the Klang Valley area

The Klang Valley is served by the Klang Valley Integrated Transit System, consisting of various rail transit services. Thousands of people use these train services each day. The following are lists of train stations in the Klang Valley which is sorted according to alphabetical order and also according to their routes.

Station list in alphabetical order

StationStation CodePhotoLine(s)OperatorTypeLocal authorityOpenedRemarks
Abdullah Hukum KD01 
 KJ17 
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
KTM
Rapid Rail
Commuter rail
LRT
Kuala Lumpur1 September 1998 (LRT)
28 October 2018 (KTM Komuter)
Alam Megah KJ35  5 Kelana Jaya LineRapid RailLRTShah Alam30 June 2016
Alam Sutera SP21  4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Ampang AG18  3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Ampang Park (LRT) KJ9  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Walking distance to  PY20  Ampang Park (MRT)
Ampang Park (MRT) PY20 12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023Walking distance to  KJ9  Ampang Park (LRT)
Angkasapuri KD02  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Ara Damansara KJ26  5 Kelana Jaya LineRapid RailLRTPetaling Jaya30 June 2016
Asia Jaya KJ21  5 Kelana Jaya LineRapid RailLRTPetaling Jaya1 September 1998
Awan Besar SP19  4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Bandaraya AG6 
 SP6 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996Walking distance to  KA03  Bank Negara
Bandar Puteri SP27  4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Bandar Tasik Selatan KB04 
 KT2 
 SP15 
1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
7 KLIA Transit
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur10 November 1995 (KTM Komuter)
11 July 1998 (LRT)
20 June 2002 (ERL)
There is no paid-area-to-paid-area integration. Walkways connect the three stations.
Bandar Tun Hussein Onn KG29  9 Kajang LineRapid RailMRTKajang17 July 2017
Bandar Tun Razak SP14  4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Bandar Utama KG09  9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Bangi KB08  1 Batu Caves-Pulau Sebang LineKTMCommuter railKajang1995
Bangsar (Bank Rakyat-Bangsar) KJ16  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Bank Negara KA03  1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur14 August 1995Walking distance to  AG6  SP6  Bandaraya
Batang Benar KB09  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Batang Kali KA13  2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Batu 11 Cheras KG30  9 Kajang LineRapid RailMRTKajang17 July 2017
Batu Caves KC05  1 Batu Caves-Pulau Sebang LineKTMCommuter railSelayangApril 2010
Batu Kentonmen KC02  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala LumpurApril 2010
Batu Tiga KD10  2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam1995
Bukit Badak KD13  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Bukit Bintang (MRT) (Pavilion-Bukit Bintang) KG18A  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Walking distance to  MR6  Bukit Bintang (Monorail)
Bukit Bintang Monorail MR6  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walking distance to  KG18A  Bukit Bintang (MRT)
Bukit Dukung KG31  9 Kajang LineRapid RailMRTKajang17 July 2017
Bukit Jalil SP17  4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Bukit Nanas MR8  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walking distance to  KJ12  Dang Wangi
Cahaya AG17  3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Cempaka AG16  3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Chan Sow Lin AG11 
 SP11 
 PY24 
3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
Rapid RailLRT
MRT
Kuala Lumpur16 December 1996
(LRT)
16 March 2023
(MRT)
Cheras SP12  4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Chow Kit MR10  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Cochrane KG21  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Conlay (Conlay-Kompleks Kraf) PY22  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Cyberjaya City Centre (Cyberjaya City Centre-Limkokwing) PY40  12 Putrajaya LineRapid RailMRTSepang16 March 2023
Cyberjaya Utara (Cyberjaya Utara-Finexus) PY39  12 Putrajaya LineRapid RailMRTSepang16 March 2023
Damai KJ8  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Damansara Damai PY05  12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Dang Wangi KJ12  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Walking distance to  MR8  Bukit Nanas
Dato' Keramat KJ7  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Glenmarie (CGC-Glenmarie) KJ27  5 Kelana Jaya LineRapid RailLRTPetaling Jaya30 June 2016
Gombak KJ1  5 Kelana Jaya LineRapid RailLRTSelayang1 June 1999
Hang Tuah (BBCC-Hang Tuah) AG9 
 SP9 
 MR4 
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
Rapid RailLRT
Monorail
Kuala Lumpur16 December 1996 (LRT)
31 August 2003 (Monorail)
Hospital Kuala Lumpur PY18  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Imbi MR5  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
IOI Puchong Jaya SP24  4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Jalan Ipoh PY15  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Jalan Kastam KD18  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Jalan Templer KD05  2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Jelatek KJ6  5 Kelana Jaya LineRapid RailLRTAmpang Jaya1 June 1999
Jinjang PY11  12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Kajang KB06 
 KG35 
1 Batu Caves-Pulau Sebang Line
9 Kajang Line
KTM
Rapid Rail
Commuter rail
MRT
Kajang10 November 1995 (KTM Komuter)
17 July 2017 (MRT)
Kajang 2 KB06A  1 Batu Caves-Pulau Sebang LineKTMCommuter railKajang13 March 2023
Kampung Baru KJ11  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Kampung Batu KC03 
 PY13 
1 Batu Caves-Pulau Sebang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Kuala LumpurApril 2010 (KTM Komuter)
16 June 2022 (MRT)
Kampung Dato Harun KD06  2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Kampung Raja Uda KD17  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Kampung Selamat PY03  12 Putrajaya LineRapid RailMRTPetaling Jaya16 December 2016
Kelana Jaya KJ24  5 Kelana Jaya LineRapid RailLRTPetaling Jaya1 September 1998
Kentonmen PY14  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Kepong KA07  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995
Kepong Baru PY10  12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Kepong Sentral KA08  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995Connecting station with  PY08  Sri Damansara Timur
Kerinchi KJ18  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Kinrara BK5 SP22  4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Klang KD14  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
KLCC KJ10  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Suria KLCC
KLIA T1 KE23 
 KT5 
6 KLIA Ekspres
7 KLIA Transit
ERLAirport rail linkSepang14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
KLIA T2 KE3 
 KT6 
6 KLIA Ekspres
7 KLIA Transit
ERLAirport rail linkSepang1 May 2014
Kota Damansara KG06  9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Kuala Kubu Bharu KA15  2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor5 January 2008
Kuala Lumpur KA02  1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur14 August 1995
Kuala Lumpur Sentral (KL Sentral) KA01 
 KS01 
 KJ15 
 KE1 
 KT1 
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur2001 (Kelana Jaya Line, Batu Caves-Pulau Sebang Line, Tanjung Malim-Port Klang Line)
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
1 May 2018 (KL Sentral-Skypark Line)
There is no paid-area-to-paid-area integration between the different services in KL Sentral. Walkways to  MR1  KL Sentral Monorail and  KG15  Muzium Negara
The LRT part of this station is known as KL Sentral-redONE
Kuala Lumpur Sentral (KL Sentral) Monorail MR1  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  KG15  Muzium Negara
Kuang KA10  2 Tanjung Malim-Port Klang LineKTMCommuter railSelayang1995
Kuchai PY27  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Kwasa Damansara KG04 
 PY01 
9 Kajang Line
12 Putrajaya Line
Rapid RailMRTShah Alam16 December 2016 (Kajang Line)
16 June 2022 (Putrajaya Line)
Kwasa Sentral KG05  9 Kajang LineRapid RailMRTShah Alam16 December 2016
Labu KB11  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Lembah Subang KJ25  5 Kelana Jaya LineRapid RailLRTKuala Lumpur30 June 2016
Maharajalela MR3  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Maluri (AEON-Maluri) AG13 
 KG22 
3 Ampang Line
9 Kajang Line
Rapid RailLRT
MRT
Kuala Lumpur16 December 1996 (LRT)
17 July 2017 (MRT)
The MRT station is also known as AEON-Maluri
Masjid Jamek AG7 
 SP7 
 KJ13 
3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
Rapid RailLRTKuala Lumpur16 December 1996
(Ampang & Sri Petaling Lines)
1 June 1999
(Kelana Jaya Line)
Medan Tuanku MR9  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Mentari SB2  B1 BRT Sunway LineRapid BusBRTPetaling Jaya2 June 2015
Merdeka KG17  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Integrated (paid-area-to-paid-area) link to  AG8  SP8  Plaza Rakyat
Metro Prima PY09  12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Mid Valley KB01  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur23 August 2004
Miharja AG12  3 Ampang LineRapid RailLRTKuala Lumpur16 December 1996
Muhibbah SP20  4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Mutiara Damansara KG08  9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Muzium Negara KG15  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  MR1  KL Sentral Monorail
Nilai KB10  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Padang Jawa KD12  2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam1995
Pandan Indah AG15  3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Pandan Jaya AG14  3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Pantai Dalam KD03  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Pasar Seni KJ14 
 KG16 
5 Kelana Jaya Line
9 Kajang Line
Rapid RailLRT
MRT
Kuala Lumpur1 September 1998 (LRT)
17 July 2017 (MRT)
Walking distance to  KA02  Kuala Lumpur Station
Persiaran KLCC PY21  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Petaling KD04  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Port Klang (Pelabuhan Klang) KD19  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Phileo Damansara KG12  9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Plaza Rakyat AG8 
 SP8 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996Integrated (paid-area-to-paid-area) link to  KG17  Merdeka
Puchong Perdana SP28  4 Sri Petaling LineRapid RailLRTSubang Jaya30 June 2016
Puchong Prima SP29  4 Sri Petaling LineRapid RailLRTSubang Jaya30 June 2016
Pudu AG10 
 SP10 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996
Pulau Sebang/Tampin KB17  1 Batu Caves-Pulau Sebang LineKTMCommuter railAlor Gajah10 October 2015
Pusat Bandar Damansara (Pavilion-Pusat Bandar Damansara) KG13  9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Pusat Bandar Puchong SP25  4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Putra KA04  1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur1995
Putra Heights SP31 
 KJ37 
4 Sri Petaling Line
5 Kelana Jaya Line
Rapid RailLRTSubang Jaya30 June 2016
Putra Permai PY37  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Putrajaya Sentral KT3 
 PY41 
7 KLIA Transit
12 Putrajaya Line
ERL
Rapid Rail
Airport rail link
MRT
Putrajaya20 June 2002
(ERL)
16 March 2023
(MRT)
The KLIA Transit part of this station is known as Putrajaya & Cyberjaya
PWTC AG4 
 SP4 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Raja Chulan MR7  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Raja Uda (Raja Uda-UTM) PY19  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Rasa KA14  2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Rawang KA11  2 Tanjung Malim-Port Klang LineKTMCommuter railSelayang1995
Rembau KB16 1 Batu Caves-Pulau Sebang LineKTMCommuter railRembau10 October 2015
Salak Selatan (KTM) KB03  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Salak Selatan (LRT) SP13  4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Salak Tinggi KT4  7 KLIA TransitERLAirport rail linkSepang20 June 2002
Segambut KA05  2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995
Semantan KG14  9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Senawang KB14  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban14 May 2011
Sentul (KTM) KC01  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Sentul (LRT) AG2 
 SP2 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Sentul Barat PY16  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Sentul Timur AG1 
 SP1 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Seputeh KB02  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Serdang KB05  1 Batu Caves-Pulau Sebang LineKTMCommuter railSubang Jaya1995
Serdang Jaya PY33  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Serdang Raya Selatan PY32  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Serdang Raya Utara PY31  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Seremban KB13  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Serendah KA12  2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Seri Setia KD07  2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Setia Jaya (Sunway-Setia Jaya) KD08 
 SB1 
2 Tanjung Malim-Port Klang Line
B1 BRT Sunway Line
KTM
Rapid Bus
Commuter rail
BRT
Petaling Jaya14 August 1995
(KTM Komuter)
2 June 2015
(BRT)
The BRT part of the station is known as Sunway-Setia Jaya.
Setiawangsa KJ5  5 Kelana Jaya LineRapid RailLRTAmpang Jaya1 June 1999
Shah Alam KD11  2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam14 August 1995
South Quay-USJ 1 SB6  B1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Sri Damansara Barat PY06  12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Sri Damansara Sentral PY07  12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Sri Damansara Timur PY08  12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022Connecting station with  KA07  Kepong Sentral
Sri Delima PY12  12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Sri Rampai KJ4  5 Kelana Jaya LineRapid RailLRTKuala Lumpur24 December 2010
Sri Raya KG28  9 Kajang LineRapid RailMRTKajang17 July 2017
Sri Petaling SP18  4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
SS15 KJ29  5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
SS18 KJ30  5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Stadium Kajang KG34  9 Kajang LineRapid RailMRTKajang17 July 2017
Subang Alam KJ36  5 Kelana Jaya LineRapid RailLRTShah Alam30 June 2016
Subang Jaya KD09 
 KS02 
 KJ28 
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
Commuter rail
LRT
Airport rail link
Subang Jaya14 August 1995 (Tanjung Malim-Port Klang Line)
30 June 2016 (LRT)
1 May 2001 (KL Sentral-Skypark Line)
Sultan Ismail AG5 
 SP5 
3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996
Sungai Besi SP16 
 PY29 
4 Sri Petaling Line
12 Putrajaya Line
Rapid RailLRT
MRT
Kuala Lumpur11 July 1998
(LRT)
16 March 2023
(MRT)
Sungai Buloh KA09 
 PY04 
2 Tanjung Malim-Port Klang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Selayang1995
(KTM Komuter)
16 December 2016
(MRT)
Sungai Gadut KB15  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban14 May 2011
Sungai Jernih KG33  9 Kajang LineRapid RailMRTKajang17 July 2017
SunMed SB4  B1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
SunU-Monash SB5  B1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Sunway Lagoon SB3  B1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Surian KG07  9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Taipan KJ32  5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Taman Bahagia KJ23  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Connaught KG26  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Equine PY36  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Taman Jaya KJ20  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Melati KJ2  5 Kelana Jaya LineRapid RailLRTSelayang1 June 1999
Taman Midah KG24  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Mutiara KG25  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Naga Emas PY28  12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Taman Paramount KJ22  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Perindustrian Puchong SP26  4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Taman Pertama KG23  9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Suntex KG27  9 Kajang LineRapid RailMRTKajang17 July 2017
Taman Tun Dr Ismail (Taman Tun Dr Ismail-Deloitte) KG10  9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Taman Wahyu KC04  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala LumpurApril 2010
Tanjung Malim KA16  2 Tanjung Malim-Port Klang LineKTMCommuter railTanjung Malim1 June 2008
Teluk Gadong KD16  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Teluk Pulai KD15  2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Terminal Skypark KS03  10 KL Sentral-Terminal Skypark LineKTMAirport rail linkSubang Jaya1 May 2018
Tiroi KB12  1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Titiwangsa AG3 
 SP3 
 MR11 
 PY17 
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
Rapid RailLRT
Monorail
MRT
Kuala Lumpur11 July 1998
(LRT)
31 August 2003
(Monorail)
16 March 2023
(MRT)
Tun Razak Exchange (Tun Razak Exchange-Samsung Galaxy) KG20 
 PY23 
9 Kajang Line
12 Putrajaya Line
Rapid RailMRTKuala Lumpur17 July 2017
(Kajang Line)
16 March 2023
(Putrajaya Line)
Tun Sambanthan MR2  8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Universiti KJ19  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
UKM KB07  1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
UPM PY34  12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
USJ 7 KJ31 
 SB7 
5 Kelana Jaya Line
B1 BRT Sunway Line
Rapid Rail
Rapid Bus
LRT
BRT
Subang Jaya30 June 2016
(LRT)
2 June 2015
(BRT)
USJ 21 KJ34  5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Wangsa Maju KJ3  5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Wawasan KJ33  5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
16 Sierra PY38  12 Putrajaya LineRapid RailMRTSepang16 March 2023

Station list according to lines

Railway lines around Klang Valley
LinesTypeTerminiNumber of StationsOwnerOperatorStatus
1 Batu Caves-Pulau SebangCommuter railBatu Caves27Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Operational
Pulau Sebang/Tampin
2 Tanjung Malim-Port KlangCommuter railTanjung Malim34Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Operational
Port Klang
3 AmpangLight rapid transit (LRT)Sentul Timur18Prasarana MalaysiaRapid RailOperational
Ampang
4 Sri PetalingLight rapid transit (LRT)Sentul Timur29Prasarana MalaysiaRapid RailOperational
Putra Heights
5 Kelana JayaLight rapid transit (LRT)Gombak37Prasarana MalaysiaRapid RailOperational
Putra Heights
6 KLIA EkspresExpress Airport rail linkKL Sentral3Express Rail LinkExpress Rail LinkOperational
KLIA T2
7 KLIA TransitAirport rail linkKL Sentral6Express Rail LinkExpress Rail LinkOperational
KLIA T2
8 KL MonorailMonorailKL Sentral11Prasarana MalaysiaRapid RailOperational
Titiwangsa
9 KajangMass rapid transit (MRT)Kwasa Damansara29Mass Rapid Transit CorporationRapid RailOperational
Kajang
10 KL Sentral-Terminal SkyparkLimited express airport rail linkKL Sentral3Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Suspended[1]
Terminal Skypark
11 Shah AlamLight rapid transit (LRT)Bandar Utama25Prasarana MalaysiaRapid RailUnder construction (Opening in 2025)
Johan Setia
12 PutrajayaMass rapid transit (MRT)Kwasa Damansara36Mass Rapid Transit CorporationRapid RailOperational
Putrajaya Sentral
13 Circle MRTMass rapid transit (MRT)Loop line31Mass Rapid Transit CorporationRapid RailPre-construction[2]
B1 BRT SunwayBus rapid transit (BRT)Sunway-Setia Jaya7Prasarana MalaysiaRapid BusOperational
USJ 7

Legend
Interchange station (paid link)

Connecting station (unpaid link)

Connected with airport

Connected with intercity rail service

Connected with long-distance bus terminal

Rail line denoted in Italics - Under construction

Station name denoted in Italics - Provisioned/future station

Commuter rail lines

The KTM Komuter has two main lines, namely the 1 Batu Caves-Pulau Sebang Line and the 2 Tanjung Malim-Port Klang Line.[3] These two lines begin separately, but share a common route between Putra and KL Sentral stations, before splitting again and heading towards their respective termini. This effectively makes Putra, Bank Negara, Kuala Lumpur and KL Sentral stations interchanges between the two lines. The station codes are given based on the portion of the lines the stations are on. (Station code legend: K-Komuter, A-Tanjung Malim route, B-Pulau Sebang/Tampin route, C-Batu Caves route, D-Port Klang route)

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
1 - KTM Batu Caves-Pulau Sebang Line
 KC05 Batu CavesGombak  Selangor
 KC04 Taman Wahyu  Kuala Lumpur  Federal Territories
 KC03 Kampung Batu 12 Putrajaya Line
 KC02 Batu Kentonmen
 KC01 Sentul
 KA04 Putra 2 Tanjung Malim-Port Klang Line

(PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03 Bank Negara 2 Tanjung Malim-Port Klang Line

(Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02 Kuala Lumpur 2 Tanjung Malim-Port Klang Line


5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
KTM ETS

 KA01 KL Sentral 2 Tanjung Malim-Port Klang Line


5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
KTM ETS

 KB01 Mid Valley (Abdullah Hukum)
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
 KB02 Seputeh
 KB03 Salak Selatan
 KB04 Bandar Tasik Selatan
4 Sri Petaling Line
7 KLIA Transit
KTM ETS
Southern Integrated Terminal (TBS)
 KB05 SerdangSubang Jaya  Selangor
 KB06 Kajang
9 Kajang Line
KTM ETS
Hulu Langat
 KB06A Kajang 2
 KB07 UKM
 KB08 Bangi
 KB09 Batang BenarSeremban  Negeri Sembilan
 KB10 Nilai
 KB11 Labu
 KB12 Tiroi
 KB13 Seremban KTM ETS
 KB14 Senawang
 KB15 Sungai Gadut
 KB16 RembauRembau
 KB17 Pulau Sebang/Tampin KTM ETSAlor Gajah  Malacca
2 - KTM Tanjung Malim-Port Klang Line
 KA16 Tanjung Malim KTM ETSMuallim  Perak
 KA15 Kuala Kubu Bharu KTM ETSHulu Selangor  Selangor
 KA14 Rasa
 KA13 Batang Kali KTM ETS
 KA12 Serendah
 KA11 Rawang KTM ETSGombak
 KA10 Kuang
 KA09 Sungai Buloh
12 Putrajaya Line
KTM ETS
Petaling Jaya
 KA08 Kepong Sentral
12 Putrajaya Line (Sri Damansara Timur)
KTM ETS
 KA07 Kepong  Kuala Lumpur  Federal Territories
 KA05 Segambut
 KA04 Putra 1 Batu Caves-Pulau Sebang Line

(PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03 Bank Negara 1 Batu Caves-Pulau Sebang Line

(Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02 Kuala Lumpur 1 Batu Caves-Pulau Sebang Line


5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
KTM ETS

 KA01 KL Sentral 1 Batu Caves-Pulau Sebang Line



5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
KTM ETS

 KD01 Abdullah Hukum
5 Kelana Jaya Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)
 KD02 Angkasapuri
 KD03 Pantai Dalam 13 Circle Line
 KD04 PetalingPetaling Jaya  Selangor
 KD05 Jalan Templer
 KD06 Kampung Dato’ Harun
 KD07 Seri Setia
 KD08 Setia Jaya B1 BRT Sunway Line (Sunway-Setia Jaya)
 KD09 Subang Jaya
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KD10 Batu TigaShah Alam
 KD11 Shah Alam
 KD12 Padang Jawa
 KD13 Bukit BadakKlang
 KD14 Klang
 KD15 Teluk Pulai
 KD16 Teluk Gadong
 KD17 Kampung Raja Uda
 KD18 Jalan Kastam
 KD19 Port Klang

Light rapid transit (LRT) lines

There are three LRT lines in the Klang Valley which are currently operating, namely the 3 Ampang Line, 4 Sri Petaling Line, and 5 Kelana Jaya Line.[4] The 11 Shah Alam Line was proposed in 2015 and is still currently under construction.[5]

The Ampang and Sri Petaling Lines operate as a single LRT system. They share a common route from Sentul Timur station to Chan Sow Lin station, therefore, all stations on this route act as interchange stations between both the lines. After Chan Sow Lin, the lines split toward their respective termini. The Kelana Jaya Line starts in Gombak in the north, passing through the city centre, and terminating at Putra Heights station which is also the southern terminus of the Sri Petaling Line, serving as an interchange between the two lines.

The third LRT system, the Shah Alam Line is planned to be opened in 2025. It will be the first rail transit line in the Klang Valley Integrated Transit System to be situated completely outside the borders of Kuala Lumpur.

This is the new stations numbering of the 3 Ampang Line, which can be found on the Rapid KL's official website here.
This is the stations numbering of 4 Sri Petaling Line, which can be found on Rapid KL's official website here.
Official transit line map of the 5 Kelana Jaya Line, which can be found on Rapid KL's official website here.
Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
3 - LRT Ampang Line
 AG1 Sentul Timur 4 Sri Petaling Line  Kuala Lumpur  Federal Territories
 AG2 Sentul 4 Sri Petaling Line
 AG3 Titiwangsa
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line13 Circle Line
 AG4 PWTC 4 Sri Petaling Line

(Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG5 Sultan Ismail 4 Sri Petaling Line

8 KL Monorail (Medan Tuanku)

 AG6 Bandaraya 4 Sri Petaling Line

(Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG7 Masjid Jamek
4 Sri Petaling Line
5 Kelana Jaya Line
 AG8 Plaza Rakyat
4 Sri Petaling Line
9 Kajang Line (Merdeka)
 AG9 BBCC–Hang Tuah
4 Sri Petaling Line
8 KL Monorail
 AG10 Pudu 4 Sri Petaling Line
 AG11 Chan Sow Lin
4 Sri Petaling Line
12 Putrajaya Line
 AG12 Miharja
 AG13 Maluri 9 Kajang Line
 AG14 Pandan JayaAmpang  Selangor
 AG15 Pandan Indah 13 Circle Line
 AG16 Cempaka
 AG17 Cahaya
 AG18 Ampang
4 - LRT Sri Petaling Line
 SP1 Sentul Timur 3 Ampang Line  Kuala Lumpur  Federal Territories
 SP2 Sentul 3 Ampang Line
 SP3 Titiwangsa
3 Ampang Line
8 KL Monorail
12 Putrajaya Line13 Circle Line
 SP4 PWTC 3 Ampang Line

(Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP5 Sultan Ismail 3 Ampang Line

8 KL Monorail (Medan Tuanku)

 SP6 Bandaraya 3 Ampang Line

(Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP7 Masjid Jamek
3 Ampang Line
5 Kelana Jaya Line
 SP8 Plaza Rakyat
3 Ampang Line
9 Kajang Line (Merdeka)
 SP9 BBCC–Hang Tuah
3 Ampang Line
8 KL Monorail
 SP10 Pudu 3 Ampang Line
 SP11 Chan Sow Lin
3 Ampang Line
12 Putrajaya Line
 SP12 Cheras
 SP13 Salak Selatan 13 Circle Line
 SP14 Bandar Tun Razak
 SP15 Bandar Tasik Selatan
1 Batu Caves-Pulau Sebang Line
7 KLIA Transit
KTM ETS
Southern Integrated Terminal (TBS)
 SP16 Sungai Besi 12 Putrajaya Line
 SP17 Bukit Jalil
 SP18 Sri Petaling
 SP19 Awan Besar
 SP20 Muhibbah
 SP21 Alam Sutera
 SP22 Kinrara BK5Subang Jaya  Selangor
 SP24 IOI Puchong Jaya
 SP25 Pusat Bandar Puchong
 SP26 Taman Perindustrian Puchong
 SP27 Bandar Puteri
 SP28 Puchong Perdana
 SP29 Puchong Prima
 SP31 Putra Heights 5 Kelana Jaya Line
5 - LRT Kelana Jaya Line
 KJ1 Gombak  ECR  East Coast Rail Link (ECR)
Eastern Integrated Terminal (TBT)
Gombak  Selangor
 KJ2 Taman Melati  Kuala Lumpur  Federal Territories
 KJ3 Wangsa Maju
 KJ4 Sri Rampai
 KJ5 Setiawangsa 13 Circle LineAmpang  Selangor
 KJ6 Jelatek
 KJ7 Dato' Keramat  Kuala Lumpur  Federal Territories
 KJ8 Damai
 KJ9 Ampang Park 12 Putrajaya Line
 KJ10 KLCC
 KJ11 Kampung Baru
 KJ12 Dang Wangi 8 KL Monorail (Bukit Nanas)
 KJ13 Masjid Jamek
3 Ampang Line
4 Sri Petaling Line
 KJ14 Pasar Seni 9 Kajang Line

(Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM ETS

 KJ15 KL Sentral–redONE
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
KTM ETS
 KJ16 Bank Rakyat–Bangsar
 KJ17 Abdullah Hukum
2 Tanjung Malim-Port Klang Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 2]
 KJ18 Kerinchi
 KJ19 Universiti 13 Circle Line
 KJ20 Taman JayaPetaling Jaya  Selangor
 KJ21 Asia Jaya
 KJ22 Taman Paramount
 KJ23 Taman Bahagia
 KJ24 Kelana Jaya
 KJ25 Lembah Subang
 KJ26 Ara Damansara
 KJ27 CGC-Glenmarie 11 Shah Alam LineShah Alam
 KJ28 Subang Jaya
2 Tanjung Malim-Port Klang Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KJ29 SS15
 KJ30 SS18
 KJ31 USJ 7 B1 BRT Sunway Line
 KJ32 Taipan
 KJ33 Wawasan
 KJ34 USJ 21
 KJ35 Alam MegahShah Alam
 KJ36 Subang Alam
 KJ37 Putra Heights 4 Sri Petaling LineSubang Jaya
11 - LRT Shah Alam Line (opening 2025)
 SA01 Bandar Utama 9 Kajang LinePetaling Jaya  Selangor
 SA02 Kayu Ara
 SA03 BU11
 SA04 Tropicana
 SA05 Damansara Idaman
 SA06 SS 7
 SA07 Glenmarie 5 Kelana Jaya LineShah Alam
 SA08 Temasya
 SA09 Kerjaya
 SA10 Stadium Shah Alam
 SA12 Dato Menteri
 SA13 Raja Muda
 SA14 UiTM Shah Alam
 SA15 Seksyen 7 Shah Alam
 SA16 Bukit Raja SelatanKlang
 SA17 Bandar Baru Klang
 SA18 Pasar Besar Klang
 SA19 Jalan Meru
 SA20 Pasar Jawa
 SA21 Taman Selatan
 SA22 Seri Andalas
 SA23 Klang Jaya
 SA24 Bandar Bukit Tinggi
 SA25 Bandar Botanik
 SA26 Johan Setia

Bus rapid transit (BRT) Lines

The B1 BRT Sunway Line is a bus rapid transit line in Bandar Sunway, Selangor. The BRT line is a public-private partnership project between Prasarana Malaysia and Sunway Group to provide a better and integrated transit service for the residents and commuters of Bandar Sunway and USJ.[6] A second BRT line known as the B2 BRT Federal Line was proposed but has been scrapped by the government.

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
B1 - BRT Sunway Line
 SB1 Sunway-Setia Jaya 2 Tanjung Malim-Port Klang Line (Setia Jaya)Petaling Jaya  Selangor
 SB2 Mentari
 SB3 Sunway LagoonSubang Jaya
 SB4 SunMed
 SB5 SunU-Monash
 SB6 South Quay-USJ 1
 SB7 USJ 7 5 Kelana Jaya Line

Airport rail link lines

There are two main airport rail link systems. One is operated by Express Rail Link (ERL) and another one by Keretapi Tanah Melayu (KTM).

The ERL system consists of two lines, namely the 6 KLIA Ekspres and the 7 KLIA Transit.[7] The KLIA Ekspres is a non-stop service between KL Sentral and the Kuala Lumpur International Airport (KLIA), and does not stop at any station in between (hence the name "express"). The KLIA Transit services all stations between KL Sentral and KLIA (hence the name "transit").

The 10 KL Sentral-Terminal Skypark Line, operated by KTM as part of its KTM Komuter service, serves the Sultan Abdul Aziz Shah Airport (also known as Subang Airport), spanning 26 km from KL Sentral to Terminal Skypark station.[8]

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
6 - ERL KLIA Ekspres
7 - ERL KLIA Transit
 KE1  KT1 KL Sentral
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
KTM ETS
 Kuala Lumpur  Federal Territories
 KT2 Bandar Tasik Selatan
1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
KTM ETS
Southern Integrated Terminal (TBS)
 KT3 Putrajaya & Cyberjaya
12 Putrajaya Line (Putrajaya Sentral)
14 Putrajaya Monorail
 Putrajaya
 KT4 Salak TinggiSepang  Selangor
 KE2  KT5 KLIA T1 Kuala Lumpur International Airport
 KE3  KT6 KLIA T2
10 - KTM KL Sentral-Terminal Skypark Line
 KS01 KL Sentral
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
KTM ETS
 Kuala Lumpur  Federal Territories
 KS02 Subang Jaya
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
Subang Jaya  Selangor
 KS03 Terminal Skypark Sultan Abdul Aziz Shah AirportShah Alam


Monorail lines

This is the stations numbering of 8 KL Monorail line, which can be found on Rapid KL's official website here.

The 8 KL Monorail is situated entirely within the Kuala Lumpur city centre and serves to connect various shopping and entertainment centres throughout the city centre.

The 14 Putrajaya Monorail is a proposed transit line that was meant to serve the administrative capital of Putrajaya. The line's construction began in 2004 but was halted due to the city's low population. In 2020, plans to resume the construction are underway.

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
8 - KL Monorail
 MR1 KL Sentral
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
KTM ETS
 Kuala Lumpur  Federal Territories
 MR2 Tun Sambanthan
 MR3 Maharajalela
 MR4 BBCC–Hang Tuah
3 Ampang Line
4 Sri Petaling Line
 MR5 Imbi
 MR6 Bukit Bintang 9 Kajang Line
 MR7 Raja Chulan
 MR8 Bukit Nanas 5 Kelana Jaya Line (Dang Wangi)
 MR9 Medan Tuanku (Sultan Ismail)
3 Ampang Line
4 Sri Petaling Line
 MR10 Chow Kit
 MR11 Titiwangsa
3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line13 Circle Line

Mass rapid transit (MRT) lines

There are two MRT lines currently operational in the Klang Valley, namely the 9 Kajang Line and the 12 Putrajaya Line.

A third MRT line, the proposed 13 Circle Line, is currently undergoing a pre-construction phase, with constructions of the loop line set to commence in 2023.[2]

CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
9 - MRT Kajang Line
 KG04 Kwasa Damansara 12 Putrajaya Line
Northern Integrated Terminal (TBU)
Shah Alam  Selangor
 KG05 Kwasa Sentral
 KG06 Kota DamansaraPetaling Jaya
 KG07 Surian
 KG08 Mutiara Damansara
 KG09 Bandar Utama 11 Shah Alam Line
 KG10 Taman Tun Dr Ismail–Deloitte (TTDI)  Kuala Lumpur  Federal Territories
 KG12 Phileo Damansara
 KG13 Pavilion Damansara Heights–Pusat Bandar Damansara
 KG14 Semantan
 KG15 Muzium Negara (KL Sentral)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
10 KL Sentral-Terminal Skypark Line
KTM ETS
 KG16 Pasar Seni 5 Kelana Jaya Line

(Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTM ETS
 KG17 Merdeka (Plaza Rakyat)
3 Ampang Line
4 Sri Petaling Line
 KG18A Pavilion Kuala Lumpur–Bukit Bintang 8 KL Monorail
 KG20 Tun Razak Exchange–Samsung Galaxy (TRX) 12 Putrajaya Line
 KG21 Cochrane
 KG22 AEON–Maluri 3 Ampang Line
 KG23 Taman Pertama
 KG24 Taman Midah 13 Circle Line
 KG25 Taman Mutiara
 KG26 Taman Connaught
 KG27 Taman SuntexHulu Langat  Selangor
 KG28 Sri Raya
 KG29 Bandar Tun Hussein Onn
 KG30 Batu 11 Cheras
 KG31 Bukit Dukung
 KG33 Sungai Jernih
 KG34 Stadium Kajang
 KG35 Kajang
1 Batu Caves-Pulau Sebang Line
KTM ETS
12 - MRT Putrajaya Line[9]
 PY01 Kwasa Damansara 9 Kajang Line
Northern Integrated Terminal (TBU)
Shah Alam  Selangor
 PY03 Kampung SelamatPetaling Jaya
 PY04 Sungai Buloh
2 Tanjung Malim-Port Klang Line
KTM ETS
 PY05 Damansara Damai
 PY06 Sri Damansara Barat
 PY07 Sri Damansara Sentral
 PY08 Sri Damansara Timur (Kepong Sentral)
2 Tanjung Malim-Port Klang Line
KTM ETS
 PY09 Metro Prima  Kuala Lumpur  Federal Territories
 PY10 Kepong Baru
 PY11 Jinjang
 PY12 Sri Delima
 PY13 Kampung Batu 1 Batu Caves-Pulau Sebang Line
 PY14 Kentonmen
 PY15 Jalan Ipoh
 PY16 Sentul Barat
 PY17 Titiwangsa
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail13 Circle Line
 PY18 Hospital Kuala Lumpur
 PY19 Raja Uda–UTM
 PY20 Ampang Park 5 Kelana Jaya Line
 PY21 Persiaran KLCC
 PY22 Conlay–Kompleks Kraf
 PY23 Tun Razak Exchange–Samsung Galaxy (TRX) 9 Kajang Line
 PY24 Chan Sow Lin
3 Ampang Line
4 Sri Petaling Line
 PY27 Kuchai 13 Circle Line
 PY28 Taman Naga Emas
 PY29 Sungai Besi 4 Sri Petaling Line
 PY31 Serdang Raya UtaraSubang Jaya  Selangor
 PY32 Serdang Raya Selatan
 PY33 Serdang Jaya
 PY34 UPM
 PY36 Taman Equine
 PY37 Putra Permai
 PY38 16 SierraSepang
 PY39 Cyberjaya Utara–Finexus
 PY40 Cyberjaya City Centre–Limkokwing
 PY41 Putrajaya Sentral
7 KLIA Transit (Putrajaya & Cyberjaya)
14 Putrajaya Monorail
 Putrajaya  Federal Territories
13 - MRT Circle Line (Opening 2028)[10]
 CC01 Bukit Kiara South 9 Kajang Line  Kuala Lumpur  Federal Territories
 CC02 Sri Hartamas
 CC03 Mont Kiara
 CC04 Bukit Segambut
 CC05 Taman Sri Sinar
 CC06 Dutamas
 CC07 Jalan Kuching 2 Tanjung Malim-Port Klang Line
 CC08 Titiwangsa
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
 CC09 Kampung Puah
 CC10 Jalan Langkawi
 CC11 Danau Kota
 CC12 Setapak
 CC13 Rejang
 CC14 Setiawangsa 5 Kelana Jaya LineAmpang  Selangor
 CC15 AU2
 CC16 Taman Hillview
 CC17 Tasik Ampang
 CC18 Kampung Pandan
 CC19 Pandan Indah 3 Ampang Line
 CC20 Taman Kencana
 CC21 Taman Cheras  Kuala Lumpur  Federal Territories
 CC22 Taman Midah 9 Kajang Line
 CC23 Jalan Yaacob Latif
 CC24 Sri Permaisuri
 CC25 Salak Selatan 4 Sri Petaling Line
 CC26 Kuchai 12 Putrajaya Line
 CC27 Jalan Klang Lama
 CC28 Pantai Dalam 2 Tanjung Malim-Port Klang Line
 CC29 Pantai Permai
 CC30 Universiti 5 Kelana Jaya Line
 CC31 UM

Klang Valley Integrated Transit Map

The Klang Valley Integrated Transit Map, released by Rapid KL illustrates the connectivity between the different lines through interchanges and connecting stations. The map consists of all operational lines in the Klang Valley Integrated Transit system, as well as the remainder of the Putrajaya Line and the upcoming Shah Alam Line. The map also features stations with parking facilities.

The transit map does not include the proposed Circle Line and Putrajaya Monorail.

  • Latest version: [1]

Notes

References