Timeline of railway electrification in Norway

The Norwegian railway network consists of 2,552 kilometers (1,586 mi) of electrified railway lines, constituting 62% of the Norwegian National Rail Administration's 4,114 kilometers (2,556 mi) of line.[1] The first three mainline systems to be electrified were private ore-hauling lines. The Thamshavn Line opened in 1909, and remained in revenue use until 1973, after which it was converted to a heritage railway.[2] It is the world's oldest remaining alternating-current railway and the only narrow gauge railway in the country to have been electrified.[3] It was followed by Norsk Transport's Rjukan and Tinnoset Lines two years later,[4] and Sydvaranger's Kirkenes–Bjørnevatn Line in 1922.[5] The Norwegian State Railways' (NSB) first electrification was parts of the Drammen Line in 1922 and the ore-hauling Ofoten Line, which connects to the Iron Ore Line in Sweden, in 1923. The use of El 1 locomotives on the Drammen Line proved a large cost-saver over steam locomotives, and NSB started electrifying other lines around Oslo; from 1927 to 1930, the remainder of the Drammen Line and the continuation along the Randsfjorden and Sørlandet Lines to Kongsvinger were converted, along with the first section of the Trunk Line. In 1935, the Hardanger Line became the first section of new NSB track to be electrified. From 1936 to 1940, NSB electrified the Østfold Line, as well as more of the Sørland Line and the Bratsberg Line, connecting all electric lines west of Oslo.[3]

A small blue locomotive hauling three wooden passenger cars parked at a wooden platform
The Thamshavn Line became Norway's first electrified when it opened in 1908.
A four-car multiple unit running across a snow-covered plain with mountains in the background
Class 73 train near Dombås on the Dovre Line

During the 1940s, NSB electrified the Sørland Line, although the final section from Egersund to Stavanger was not converted until 1956.[3] In 1957, the Kirkenes–Bjørnevatn Line became the only line to remove the electrification and replace the electric locomotives with diesel power.[5] The 1950s saw the electrification of several regional and commuter lines around Oslo, including the Kongsvinger Line, the Trunk Line and the Dovre Line from Lillestrøm to Hamar, the Vestfold Line and the Eastern Østfold Line. This was largely due to NSB's program to remove all steam locomotives, either by electrification or by dieselization. In the late 1950s and 1960s, several to-be electrified lines were operated with diesel locomotives as an interim solution. The 1960s saw the remaining two steam lines in Southern Norway, the Bergen and Dovre Lines, electrified along with the Gjøvik Line. The Bergen Line was completed in 1964 and the Dovre Line completed in 1970. This finished all the planned electrifications, and the authorities deemed the remaining lines unprofitable to electrify because of low traffic. During the 1990s, a new program was attempted, this time to electrify the entire network, but only the Arendal Line was converted before the program was canceled. However, new lines around Oslo, including the Lieråsen and Oslo Tunnels on the Drammen Line and the Gardermoen and Asker Lines, were electrified at the time they opened. Further plans have been launched, in particular the section of the Nordland Line from Trondheim to Steinkjer, which is part of the Trøndelag Commuter Rail, and the Meråker Line, which connects to the electrified Central Line in Sweden.[6]

In 2008, electric traction accounted for 90% of the passenger kilometers, 93% of the tonne kilometers and 74% of the energy consumption of all trains running in Norway, with the rest being accounted for by diesel traction.[7] Technology for electric railways was demonstrated in Germany in 1879;[8] the first revenue line took electric traction into use in 1881.[9] The first electric industrial railway in Norway opened in 1892 at Skotfos Bruk near Skien. Two years later, parts of the Oslo Tramway were electrified.[10] The first alternating current (AC) line became operational in 1892, while the first line to use a single-phase, single overhead wire power supply opened in Germany in 1903.[11] In 1912, all German railways agreed to use the 15 kV  16.7 Hz AC standard, which was later adopted first by Sweden and then by NSB.[11] Several of the private lines that preceded NSB's electrification chose different standards. Sydvaranger chose to install the only mainline direct current (DC) and third rail system.[3]

Timeline

Map of the railway lines in Norway.
electrified lines
non-electrified lines
disused or heritage lines
Mæl Station where the Rjukan Line connects with the Tinnsjø railway ferry
Dm3-hauled ore train on the Ofoten Line
Voss Station is the terminus of the Bergen Commuter Rail, operated with Class 69 units.
Class 70 train near Tangen on the Dovre Line
Class 73b train on the double-track section of the Østfold Line near Vestby
Overhead wires at Movatn Station on the Gjøvik Line

The following list contains a chronology of when the various sections of mainline railway lines were electrified. The list excludes industrial and short branch lines, as well as systems installed at ports and yards. The list contains the date when the electrification was taken into regular use on each section.[12] It also notes if a section was opened as an electric railway, and if the line was prepared as an electric line, but where this was not taken into use immediately. The list contains the line and section to be electrified,[12] and its length. The length indicates the length of the mainline section at the time of electrification. Due to changes of routes and shortening of lines, the current length of sections may be shorter. The sixth column shows the electrification system, including voltage and frequency in case of AC and no frequency in case of DC.

Opened as electric
††Planned as electric
*Private
DateLineSectionLength
(km)
Length
(mi)
SystemRef(s)
10 July 1908Thamshavn*ThamshavnSvorkmo19.312.06.6 kV 25 Hz AC[2][13]
October 1908Thamshavn*SvorkmoLøkken6.03.76.6 kV 25 Hz AC[2][13]
11 July 1911††[note 1]Tinnoset*NotoddenTinnoset30.018.610 kV 16+23 Hz AC[4][14]
30 November 1911††[note 2]Rjukan*RjukanMæl16.09.910 kV 16+23 Hz AC[4][14]
23 December 1920Kirkenes–Bjørnevatn*KirkenesBjørnevatn7.54.7750 V DC[5][15]
26 November 1922DrammenOslo VBrakerøya50.831.615 kV 16+23 Hz AC[16]
11 July 1923OfotenNarvikRiksgränsen41.926.015 kV 16+23 Hz AC[17]
1 September 1927TrunkOslo ØLillestrøm21.013.015 kV 16+23 Hz AC[18]
15 October 1928Loenga–AlnabruLoenga–Alnabru7.34.515 kV 16+23 Hz AC[19]
10 April 1929SørlandetDrammenKongsberg48.630.215 kV 16+23 Hz AC[20]
6 May 1930DrammenBrakerøyaDrammen2.41.515 kV 16+23 Hz AC[21]
1 April 1935HardangerVossGranvin27.517.115 kV 16+23 Hz AC[3][22]
29 January 1936SørlandetKongsbergHjuksebø36.922.915 kV 16+23 Hz AC[23]
7 May 1936BratsbergNotoddenBorgestad60.637.715 kV 16+23 Hz AC[24]
9 December 1936ØstfoldOslo ØLjan7.24.515 kV 16+23 Hz AC[25]
18 January 1937ØstfoldLjanKolbotn5.63.515 kV 16+23 Hz AC[25]
1 September 1939ØstfoldKornsjø–Riksgrensen1.00.615 kV 16+23 Hz AC[26]
10 September 1939ØstfoldHaldenKornsjø32.520.215 kV 16+23 Hz AC[27]
24 September 1939ØstfoldKolbotnÅs18.911.715 kV 16+23 Hz AC[28]
9 January 1940ØstfoldÅsDilling34.121.215 kV 16+23 Hz AC[29]
1 May 1940ØstfoldDillingFredrikstad28.918.015 kV 16+23 Hz AC[30]
15 July 1940ØstfoldFredrikstadSarpsborg15.29.415 kV 16+23 Hz AC[31]
11 November 1940ØstfoldSarpsborgHalden27.216.915 kV 16+23 Hz AC[31]
15 October 1942SørlandetNordagutuLunde31.619.615 kV 16+23 Hz AC[32]
18 April 1943SørlandetLundeNeslandsvatn44.227.515 kV 16+23 Hz AC[33]
18 February 1944SørlandetMarnardalSira62.438.815 kV 16+23 Hz AC[34]
20 March 1944VestfoldSkienEikonrød3.32.115 kV 16+23 Hz AC[35]
24 November 1944††[note 3]FlåmMyrdalFlåm20.412.715 kV 16+23 Hz AC[3][36]
16 May 1946††[note 4]SørlandetKristiansandMarnardal36.722.815 kV 16+23 Hz AC[3][32]
26 August 1948SørlandetNeslandsvatnNelaug60.737.715 kV 16+23 Hz AC[23]
1 June 1949SørlandetNelaugKristiansand83.952.115 kV 16+23 Hz AC[23]
19 July 1949BrevikBorgestadBrevik9.45.815 kV 16+23 Hz AC[37]
1 February 1950SørlandetSiraEgersund56.935.415 kV 16+23 Hz AC[32]
15 June 1951KongsvingerLillestrøm–Riksgrensen114.671.215 kV 16+23 Hz AC[38]
15 June 1953TrunkLillestrømEidsvoll46.929.115 kV 16+23 Hz AC[39]
15 June 1953DovreEidsvollHamar58.636.415 kV 16+23 Hz AC[40]
2 July 1954BergenBergenVoss106.766.315 kV 16+23 Hz AC[41]
3 June 1956SørlandEgersundStavanger76.347.415 kV 16+23 Hz AC[23]
5 October 1956VestfoldEidangerLarvik34.021.115 kV 16+23 Hz AC[42]
20 May 1957VestfoldLarvikTønsberg43.026.715 kV 16+23 Hz AC[32]
5 December 1957VestfoldTønsbergDrammen57.936.015 kV 16+23 Hz AC[43]
11 December 1957HortenSkoppumHorten7.04.315 kV 16+23 Hz AC[44]
5 December 1958Eastern ØstfoldSkiSarpsborg80.550.015 kV 16+23 Hz AC[45]
4 October 1959RandsfjordenHokksundHønefoss54.033.615 kV 16+23 Hz AC[46]
1 February 1961Roa–HønefossRoaHønefoss32.019.915 kV 16+23 Hz AC[47]
1 February 1961AlnaGrefsenAlnabru5.23.215 kV 16+23 Hz AC[19]
1 February 1961GjøvikLoenga–Kværner2.11.315 kV 16+23 Hz AC[19]
1 February 1961GjøvikOslo ØJaren71.944.715 kV 16+23 Hz AC[48]
1 December 1962BergenHønefossÅl138.686.115 kV 16+23 Hz AC[49]
17 February 1963GjøvikJarenEina29.018.015 kV 16+23 Hz AC[50]
21 August 1963GjøvikEinaGjøvik22.914.215 kV 16+23 Hz AC[50]
15 December 1963BergenÅlUstaoset36.522.715 kV 16+23 Hz AC[51]
1 August 1964BergenTunestveit–Bergen12.07.515 kV 16+23 Hz AC[52]
7 December 1964BergenUstaosetVoss120.775.015 kV 16+23 Hz AC[50]
1 November 1966DovreHamarFåberg65.440.615 kV 16+23 Hz AC[53]
5 November 1967DovreFåbergOtta106.666.215 kV 16+23 Hz AC[54]
29 September 1968DovreOttaHjerkinn84.552.515 kV 16+23 Hz AC[55]
1 November 1970DovreHjerkinnTrondheim S171.1106.315 kV 16+23 Hz AC[32]
3 June 1973DrammenAskerBrakerøya15.59.615 kV 16+23 Hz AC[56]
1 June 1980DrammenOslo SSkøyen3.62.215 kV 16+23 Hz AC[56]
15 June 1995ArendalNelaugArendal36.222.515 kV 16+23 Hz AC[57]
8 October 1998GardermoenLillestrømEidsvoll48.330.015 kV 16+23 Hz AC[40]
22 August 1999GardermoenEtterstadLillestrøm15.79.815 kV 16+23 Hz AC[40]
1 August 2005AskerSandvikaAsker9.76.015 kV 16+23 Hz AC[58]
Under construction, to open spring 2024Stavne–LeangenMarienborgLeangen5.83.615 kV 16+23 Hz AC[59]
Under construction, to open spring 2024NordlandTrondheimStjørdal34.721.615 kV 16+23 Hz AC[59]
Under construction, to open autumn 2024MeråkerHell–the border near Storlien70.743.915 kV 16+23 Hz AC[60]

Notes and references

Notes

References

Bibliography

  • Aspenberg, Nils Carl (2001). Elektrolok i Norge (in Norwegian). Oslo: Baneforlaget. ISBN 82-91448-42-6.
  • Bjerke, Thor; Holom, Finn (2004). Banedata 2004 (in Norwegian). Hamar / Oslo: Norsk Jernbanemuseum / Norsk Jernbaneklubb. ISBN 82-90286-28-7.
  • "Railway Statistics 2008" (PDF). Norwegian National Rail Administration. 2009a. Archived from the original (pdf) on 22 November 2010. Retrieved 28 April 2010.
  • "Miljørapport 2008" (pdf) (in Norwegian). Norwegian National Rail Administration. 2009b. Retrieved 28 April 2010.[permanent dead link]