Tsukuba Express

The Tsukuba Express (つくばエクスプレス, Tsukuba Ekusupuresu), or TX, is a Japanese railway line operated by the third-sector company Metropolitan Intercity Railway Company, which links Akihabara Station in Chiyoda, Tokyo and Tsukuba Station in Tsukuba, Ibaraki. The route was inaugurated on 24 August 2005.[2]

Tsukuba Express
A Tsukuba Express train (TX-2000 series)
Overview
Native nameつくばエクスプレス
StatusIn operation
OwnerMetropolitan Intercity Railway Company
LocaleKanto Region
Termini
Stations20
Service
TypeCommuter rail
Operator(s)Metropolitan Intercity Railway Company
Depot(s)Moriya
Rolling stockTX-1000 series / TX-2000 series / TX-3000 series
Daily ridership431,060 (daily 2015)[1]
History
Opened24 August 2005
Technical
Line length58.3 km (36.2 mi)
CharacterUrban
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary (Akihabara–Moriya)
20 kV AC, 50 Hz (Moriya–Tsukuba)
Operating speed130 km/h (81 mph)

(video) Tsukuba Express line train
Platform level of Tsukuba Station

History

A comparison of Tsukuba Express with Jōban Line and express bus service between Tokyo and Tsukuba

The Metropolitan Intercity Railway Company (首都圏新都市鉄道株式会社, Shuto-ken Shin Toshi Tetsudō Kabushiki-gaisha) was founded on 15 March 1991 to construct the Tsukuba Express, which was then provisionally called the Jōban New Line (常磐新線, Jōban Shinsen). The new line was planned to relieve crowding on the Jōban Line operated by East Japan Railway Company (JR East), which had reached the limit of its capacity. However, with the economic downturn in Japan, the goal shifted to development along the line. This was facilitated by the enactment of the Special Measures Law in September 1989 which allowed the expedition of large housing projects as well as the expansion and construction of new and existing railway lines.[2]

During the early stages of construction, the construction company (Japan Railway Construction, Transport and Technology Agency, or JRTT) as well as associated keiretsu and associates in the public sector purchased land situated on the alignment of the route. Eventually, all the lots would be joined continuously, completed or not, and their ownership transferred to the eventual railway operator, MIRC.[2] Construction of all stations were centered around the theme of universal design.[2]

Also, the initial plan called for a line from Tokyo Station to Moriya, but expenses forced the planners to start the line at Akihabara instead of Tokyo Station, and pressure from the government of Ibaraki Prefecture resulted in moving the extension from Moriya to Tsukuba into Phase I of the construction.

The original schedule called for the line to begin operating in 2000, but delays in construction pushed the opening date to summer 2005. The line eventually opened on 24 August 2005.[3]

From the start of the revised timetable on 15 October 2012, new "Commuter rapid" (通勤快速, tsūkin kaisoku) services were introduced in the morning (inbound services) and evening (outbound services) peak periods.[4]

Future plans

In September 2013, a number of municipalities along the Tsukuba Express line in Ibaraki Prefecture submitted a proposal to complete the extension of the line to Tokyo Station at the same time as a new airport-to-airport line proposed as part of infrastructure improvements for the 2020 Summer Olympics.[5]

On 31 March 2023, four proposals for possible northern extensions were submitted to Ibaraki Prefecture governor Kazuhiko Ōigawa.[6] The proposals included plans to extend the line to either:

According to the proposals, the plan for the extension to Tsuchiura Station produced the most favourable cost-benefit analysis.

Driving

The Tsukuba Express is operated as a one-man train. The driver opens and closes the doors manually, but operation of the train is done automatically. The line has a top speed of 130 km/h (81 mph). The Rapid service reduced the time required for the trip from Akihabara to Tsukuba from the previous 1 hour 30 minutes (by the Jōban Line, arriving in Tsuchiura, about 15 km (9.3 mi) from Tsukuba) or 70 minutes (by bus, under optimal traffic conditions) to 45 minutes. From Tokyo, the trip takes 50–55 minutes. The line features no level crossings.

Electrification and rolling stock

To prevent interference with the geomagnetic measurements of the Japan Meteorological Agency at its laboratory in Ishioka, the portion of the line from Moriya to Tsukuba operates on alternating current. As a result, three train models are used on the line; TX-1000 series DC-only trains, which can operate only between Akihabara and Moriya, TX-2000 series and TX-3000 series dual-voltage AC/DC trains, both of which can operate over the entire line.[7]

Volume production of the line's initial rolling stock began in January 2004, following the completion in March 2003 of two (TX-1000 and TX-2000 series) six-car trains for trial operation and training. The full fleet of 84 TX-1000s (14 six-car trains) and 96 TX-2000s (16 six-car trains) was delivered by January 2005. New TX-3000 series trains built by Hitachi Rail entered service on 14 March 2020.

Operation

Metropolitan Intercity Railway Company offers four types of train services on the Tsukuba Express:

  •   : Local (普通, Futsū)
  •   : Semi Rapid (区間快速, Kukan Kaisoku)
  •   : Commuter Rapid (通勤快速, Tsūkin Kaisoku)
  •   : Rapid (快速, Kaisoku)

Station list

Trains stop at stations marked "●" and skip stations marked "|".

During the morning rush hour on weekdays, Semi Rapid trains bound for Akihabara make an additional stop at Rokuchō (marked "▲").

No.Station nameDistanceElec.LocalSemi-RapidCommuter
Rapid
RapidTransfersLocation
JapaneseEnglishWard / CityPrefecture
TX01秋葉原Akihabara0.0 km (0 mi)DCChiyodaTokyo
TX02新御徒町Shin-Okachimachi1.6 km (0.99 mi) Toei Oedo Line (E-10)Taitō
TX03浅草Asakusa3.1 km (1.9 mi) Tokyo Metro Ginza Line (at Tawaramachi (G-18))
TX04南千住Minami-Senju5.6 km (3.5 mi)JJ Joban Line (Rapid)
Tokyo Metro Hibiya Line (H-21)
Arakawa
TX05北千住Kita-Senju7.5 km (4.7 mi)Adachi
TX06青井Aoi10.6 km (6.6 mi)|||
TX07六町Rokuchō12.0 km (7.5 mi)|
TX08八潮Yashio15.6 km (9.7 mi)YashioSaitama
TX09三郷中央Misato-chūō19.3 km (12.0 mi)||Misato
TX10南流山Minami-Nagareyama22.1 km (13.7 mi)JM Musashino LineNagareyamaChiba
TX11流山セントラルパークNagareyama-centralpark24.3 km (15.1 mi)|||
TX12流山おおたかの森Nagareyama-ōtakanomori26.5 km (16.5 mi)TD Tobu Urban Park Line
TX13柏の葉キャンパスKashiwanoha-campus30.0 km (18.6 mi)|Kashiwa
TX14柏たなかKashiwa-Tanaka32.0 km (19.9 mi)|||
TX15守谷Moriya37.7 km (23.4 mi) Jōsō LineMoriyaIbaraki
TX16みらい平Miraidaira44.3 km (27.5 mi)AC||Tsukubamirai
TX17みどりのMidorino48.6 km (30.2 mi)||Tsukuba
TX18万博記念公園Bampaku-kinenkōen51.8 km (32.2 mi)||
TX19研究学園Kenkyū-gakuen55.6 km (34.5 mi)|
TX20つくばTsukuba58.3 km (36.2 mi)

Ridership figures

Fiscal yearPassengers carried
(in millions)
Days operatedPassengers per daySource
200534.69220150,000[8]
200670.69365195,000
200784.85366234,000
200893.21365258,000
200997.79365270,300[9]
2010102.22365283,000[10]
2011104.89366290,000[11]
2012110.66365306,000[12]
2013118.22365323,900[13]
2014118.84365325,600[14]
2015124.14365340,100[15]
2016129.64366354,200[16]
2017135.12365370,200[17]
2018139.74365386,000[18]
2019143.10365395,000[19]
2020100.44365278,000[20]
2021110.61365306,000[21]

See also