Jump to content

List of rail transit stations in the Klang Valley area

From Wikipedia, the free encyclopedia

The Klang Valley is served by the Klang Valley Integrated Transit System, consisting of various rail transit services. Thousands of people use these train services each day. The following are lists of train stations in the Klang Valley which is sorted according to alphabetical order and also according to their routes.

Station list in alphabetical order

StationStation CodePhotoLine(s)OperatorTypeLocal authorityOpenedRemarks
Abdullah Hukum KD01 
 KJ17 
Abdullah Hukum2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
KTM
Rapid Rail
Commuter rail
LRT
Kuala Lumpur1 September 1998 (LRT)
28 October 2018 (KTM Komuter)
Alam Megah KJ35 Alam Megah5 Kelana Jaya LineRapid RailLRTShah Alam30 June 2016
Alam Sutera SP21 Alam Sutera4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Ampang AG18 Ampang3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Ampang Park (LRT) KJ9 Ampang Park5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Walking distance to  PY20  Ampang Park (MRT)
Ampang Park (MRT) PY20 12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023Walking distance to  KJ9  Ampang Park (LRT)
Angkasapuri KD02 Angkasapuri2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Ara Damansara KJ26 Ara Damansara5 Kelana Jaya LineRapid RailLRTPetaling Jaya30 June 2016
Asia Jaya KJ21 Asia Jaya5 Kelana Jaya LineRapid RailLRTPetaling Jaya1 September 1998
Awan Besar SP19 Awan Besar4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Bandaraya AG6 
 SP6 
Bandaraya3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996Walking distance to  KA03  Bank Negara
Bandar Puteri SP27 Bandar Puteri4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Bandar Tasik Selatan KB04 
 KT2 
 SP15 
Bandar Tasik Selatan1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
7 KLIA Transit
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur10 November 1995 (KTM Komuter)
11 July 1998 (LRT)
20 June 2002 (ERL)
There is no paid-area-to-paid-area integration. Walkways connect the three stations.
Bandar Tun Hussein Onn KG29 Bandar Tun Hussein Onn9 Kajang LineRapid RailMRTKajang17 July 2017
Bandar Tun Razak SP14 Bandar Tun Razak4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Bandar Utama KG09 Bandar Utama9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Bangi KB08 Bangi1 Batu Caves-Pulau Sebang LineKTMCommuter railKajang1995
Bangsar (Bank Rakyat-Bangsar) KJ16 Bangsar5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Bank Negara KA03 Bank Negara1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur14 August 1995Walking distance to  AG6  SP6  Bandaraya
Batang Benar KB09 Batang Benar1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Batang Kali KA13 Batang Kali2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Batu 11 Cheras KG30 Batu 11 Cheras9 Kajang LineRapid RailMRTKajang17 July 2017
Batu Caves KC05 Batu Caves1 Batu Caves-Pulau Sebang LineKTMCommuter railSelayangApril 2010
Batu Kentonmen KC02 Batu Kentonmen1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala LumpurApril 2010
Batu Tiga KD10 Batu Tiga2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam1995
Bukit Badak KD13 Bukit Badak2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Bukit Bintang (MRT) (Pavilion-Bukit Bintang) KG18A Bukit Bintang MRT9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Walking distance to  MR6  Bukit Bintang (Monorail)
Bukit Bintang Monorail MR6 Bukit Bintang Monorail8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walking distance to  KG18A  Bukit Bintang (MRT)
Bukit Dukung KG31 Bukit Dukung9 Kajang LineRapid RailMRTKajang17 July 2017
Bukit Jalil SP17 Bukit Jalil4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Bukit Nanas MR8 Bukit Nanas8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walking distance to  KJ12  Dang Wangi
Cahaya AG17 Cahaya3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Cempaka AG16 Cempaka3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Chan Sow Lin AG11 
 SP11 
 PY24 
Chan Sow Lin3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line
Rapid RailLRT
MRT
Kuala Lumpur16 December 1996
(LRT)
16 March 2023
(MRT)
Cheras SP12 Cheras4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Chow Kit MR10 Chow Kit8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Cochrane KG21 Cochrane9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Conlay (Conlay-Kompleks Kraf) PY22 Conlay12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Cyberjaya City Centre (Cyberjaya City Centre-Limkokwing) PY40 Cyberjaya City Centre12 Putrajaya LineRapid RailMRTSepang16 March 2023
Cyberjaya Utara (Cyberjaya Utara-Finexus) PY39 Cyberjaya Utara12 Putrajaya LineRapid RailMRTSepang16 March 2023
Damai KJ8 Damai5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Damansara Damai PY05 Damansara Damai12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Dang Wangi KJ12 Dang Wangi5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Walking distance to  MR8  Bukit Nanas
Dato' Keramat KJ7 Dato' Keramat5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Glenmarie (CGC-Glenmarie) KJ27 Glenmarie5 Kelana Jaya LineRapid RailLRTPetaling Jaya30 June 2016
Gombak KJ1 Gombak5 Kelana Jaya LineRapid RailLRTSelayang1 June 1999
Hang Tuah (BBCC-Hang Tuah) AG9 
 SP9 
 MR4 
Hang Tuah3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
Rapid RailLRT
Monorail
Kuala Lumpur16 December 1996 (LRT)
31 August 2003 (Monorail)
Hospital Kuala Lumpur PY18 Hospital Kuala Lumpur12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Imbi MR5 Imbi8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
IOI Puchong Jaya SP24 IOI Puchong Jaya4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Jalan Ipoh PY15 Jalan Ipoh12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Jalan Kastam KD18 Jalan Kastam2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Jalan Templer KD05 Jalan Templer2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Jelatek KJ6 Jelatek5 Kelana Jaya LineRapid RailLRTAmpang Jaya1 June 1999
Jinjang PY11 Jinjang12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Kajang KB06 
 KG35 
Kajang1 Batu Caves-Pulau Sebang Line
9 Kajang Line
KTM
Rapid Rail
Commuter rail
MRT
Kajang10 November 1995 (KTM Komuter)
17 July 2017 (MRT)
Kajang 2 KB06A Kajang 21 Batu Caves-Pulau Sebang LineKTMCommuter railKajang13 March 2023
Kampung Baru KJ11 Kampung Baru5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Kampung Batu KC03 
 PY13 
Kampung Batu1 Batu Caves-Pulau Sebang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Kuala LumpurApril 2010 (KTM Komuter)
16 June 2022 (MRT)
Kampung Dato Harun KD06 Kampung Dato Harun2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Kampung Raja Uda KD17 Kampung Raja Uda2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Kampung Selamat PY03 Kampung Selamat12 Putrajaya LineRapid RailMRTPetaling Jaya16 December 2016
Kelana Jaya KJ24 Kelana Jaya5 Kelana Jaya LineRapid RailLRTPetaling Jaya1 September 1998
Kentonmen PY14 Kentomen12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Kepong KA07 Kepong2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995
Kepong Baru PY10 Kepong Baru12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Kepong Sentral KA08 Kepong Sentral2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995Connecting station with  PY08  Sri Damansara Timur
Kerinchi KJ18 Kerinchi5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Kinrara BK5 SP22 Kinrara BK54 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Klang KD14 Klang2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
KLCC KJ10 KLCC5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999Suria KLCC
KLIA T1 KE23 
 KT5 
KLIA6 KLIA Ekspres
7 KLIA Transit
ERLAirport rail linkSepang14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
KLIA T2 KE3 
 KT6 
KLIA 26 KLIA Ekspres
7 KLIA Transit
ERLAirport rail linkSepang1 May 2014
Kota Damansara KG06 Kota Damansara9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Kuala Kubu Bharu KA15 Kuala Kubu Bharu2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor5 January 2008
Kuala Lumpur KA02 Kuala Lumpur1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur14 August 1995
Kuala Lumpur Sentral (KL Sentral) KA01 
 KS01 
 KJ15 
 KE1 
 KT1 
KL Sentral1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
ERL
Airport rail link
Commuter rail
LRT
Kuala Lumpur2001 (Kelana Jaya Line, Batu Caves-Pulau Sebang Line, Tanjung Malim-Port Klang Line)
14 April 2002 (KLIA Ekspres)
20 June 2002 (KLIA Transit)
1 May 2018 (KL Sentral-Skypark Line)
There is no paid-area-to-paid-area integration between the different services in KL Sentral. Walkways to  MR1  KL Sentral Monorail and  KG15  Muzium Negara
The LRT part of this station is known as KL Sentral-redONE
Kuala Lumpur Sentral (KL Sentral) Monorail MR1 KL Sentral Monorail8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  KG15  Muzium Negara
Kuang KA10 Kuang2 Tanjung Malim-Port Klang LineKTMCommuter railSelayang1995
Kuchai PY27 Kuchai12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Kwasa Damansara KG04 
 PY01 
Kwasa Damansara9 Kajang Line
12 Putrajaya Line
Rapid RailMRTShah Alam16 December 2016 (Kajang Line)
16 June 2022 (Putrajaya Line)
Kwasa Sentral KG05 Kwasa Sentral9 Kajang LineRapid RailMRTShah Alam16 December 2016
Labu KB11 Labu1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Lembah Subang KJ25 Lembah Subang5 Kelana Jaya LineRapid RailLRTKuala Lumpur30 June 2016
Maharajalela MR3 Maharajalela8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Maluri (AEON-Maluri) AG13 
 KG22 
Maluri3 Ampang Line
9 Kajang Line
Rapid RailLRT
MRT
Kuala Lumpur16 December 1996 (LRT)
17 July 2017 (MRT)
The MRT station is also known as AEON-Maluri
Masjid Jamek AG7 
 SP7 
 KJ13 
Masjid Jamek3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
Rapid RailLRTKuala Lumpur16 December 1996
(Ampang & Sri Petaling Lines)
1 June 1999
(Kelana Jaya Line)
Medan Tuanku MR9 Medan Tuanku8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Mentari SB2 MentariB1 BRT Sunway LineRapid BusBRTPetaling Jaya2 June 2015
Merdeka KG17 Merdeka9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Integrated (paid-area-to-paid-area) link to  AG8  SP8  Plaza Rakyat
Metro Prima PY09 Metro Prima12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Mid Valley KB01 Mid Valley1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur23 August 2004
Miharja AG12 Miharja3 Ampang LineRapid RailLRTKuala Lumpur16 December 1996
Muhibbah SP20 Muhibbah4 Sri Petaling LineRapid RailLRTKuala Lumpur31 October 2015
Mutiara Damansara KG08 Mutiara Damansara9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Muzium Negara KG15 Muzium Negara9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017Walkways to  KA01  KS01  KJ15  KE1  KT1  KL Sentral and  MR1  KL Sentral Monorail
Nilai KB10 Nilai1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Padang Jawa KD12 Padang Jawa2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam1995
Pandan Indah AG15 Pandan Indah3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Pandan Jaya AG14 Pandan Jaya3 Ampang LineRapid RailLRTAmpang Jaya16 December 1996
Pantai Dalam KD03 Pantai Dalam2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Pasar Seni KJ14 
 KG16 
Pasar Seni5 Kelana Jaya Line
9 Kajang Line
Rapid RailLRT
MRT
Kuala Lumpur1 September 1998 (LRT)
17 July 2017 (MRT)
Walking distance to  KA02  Kuala Lumpur Station
Persiaran KLCC PY21 Persiaran KLCC12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Petaling KD04 Petaling2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur14 August 1995
Port Klang (Pelabuhan Klang) KD19 Port Klang2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Phileo Damansara KG12 Phileo Damansara9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Plaza Rakyat AG8 
 SP8 
Plaza Rakyat3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996Integrated (paid-area-to-paid-area) link to  KG17  Merdeka
Puchong Perdana SP28 4 Sri Petaling LineRapid RailLRTSubang Jaya30 June 2016
Puchong Prima SP29 Puchong Prima4 Sri Petaling LineRapid RailLRTSubang Jaya30 June 2016
Pudu AG10 
 SP10 
Pudu3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996
Pulau Sebang/Tampin KB17 Pulau Sebang/Tampin1 Batu Caves-Pulau Sebang LineKTMCommuter railAlor Gajah10 October 2015
Pusat Bandar Damansara (Pavilion-Pusat Bandar Damansara) KG13 PBD9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Pusat Bandar Puchong SP25 Pusat Bandar Puchong4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Putra KA04 Putra1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
KTMCommuter railKuala Lumpur1995
Putra Heights SP31 
 KJ37 
Putra Heights4 Sri Petaling Line
5 Kelana Jaya Line
Rapid RailLRTSubang Jaya30 June 2016
Putra Permai PY37 Putra Permai12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Putrajaya Sentral KT3 
 PY41 
Putrajaya Sentral7 KLIA Transit
12 Putrajaya Line
ERL
Rapid Rail
Airport rail link
MRT
Putrajaya20 June 2002
(ERL)
16 March 2023
(MRT)
The KLIA Transit part of this station is known as Putrajaya & Cyberjaya
PWTC AG4 
 SP4 
PWTC3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Raja Chulan MR7 Raja Chulan8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Raja Uda (Raja Uda-UTM) PY19 Raja Uda12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Rasa KA14 Rasa2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Rawang KA11 Rawang2 Tanjung Malim-Port Klang LineKTMCommuter railSelayang1995
Rembau KB16 1 Batu Caves-Pulau Sebang LineKTMCommuter railRembau10 October 2015
Salak Selatan (KTM) KB03 Salak Selatan KTM1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Salak Selatan (LRT) SP13 Salak Selatan LRT4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
Salak Tinggi KT4 Salak Tinggi7 KLIA TransitERLAirport rail linkSepang20 June 2002
Segambut KA05 Segambut2 Tanjung Malim-Port Klang LineKTMCommuter railKuala Lumpur1995
Semantan KG14 Semantan9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Senawang KB14 Senawang1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban14 May 2011
Sentul (KTM) KC01 Sentul1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Sentul (LRT) AG2 
 SP2 
Sentul3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Sentul Barat PY16 Sentul Barat12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Sentul Timur AG1 
 SP1 
Sentul Timur3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur11 July 1998
Seputeh KB02 Seputeh1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
Serdang KB05 Serdang1 Batu Caves-Pulau Sebang LineKTMCommuter railSubang Jaya1995
Serdang Jaya PY33 Serdang Jaya12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Serdang Raya Selatan PY32 Serdang Raya Selatan12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Serdang Raya Utara PY31 Serdang Raya Utara12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Seremban KB13 Seremban1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Serendah KA12 Serendah2 Tanjung Malim-Port Klang LineKTMCommuter railHulu Selangor21 April 2007
Seri Setia KD07 Seri Setia2 Tanjung Malim-Port Klang LineKTMCommuter railPetaling Jaya14 August 1995
Setia Jaya (Sunway-Setia Jaya) KD08 
 SB1 
Setia Jaya2 Tanjung Malim-Port Klang Line
B1 BRT Sunway Line
KTM
Rapid Bus
Commuter rail
BRT
Petaling Jaya14 August 1995
(KTM Komuter)
2 June 2015
(BRT)
The BRT part of the station is known as Sunway-Setia Jaya.
Setiawangsa KJ5 Setiawangsa5 Kelana Jaya LineRapid RailLRTAmpang Jaya1 June 1999
Shah Alam KD11 Shah Alam2 Tanjung Malim-Port Klang LineKTMCommuter railShah Alam14 August 1995
South Quay-USJ 1 SB6 Sunway LagoonB1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Sri Damansara Barat PY06 Sri Damansara Barat12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Sri Damansara Sentral PY07 Sri Damansara Sentral12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022
Sri Damansara Timur PY08 Sri Damansara Timur12 Putrajaya LineRapid RailMRTPetaling Jaya16 June 2022Connecting station with  KA07  Kepong Sentral
Sri Delima PY12 Sri Delima12 Putrajaya LineRapid RailMRTKuala Lumpur16 June 2022
Sri Rampai KJ4 Sri Rampai5 Kelana Jaya LineRapid RailLRTKuala Lumpur24 December 2010
Sri Raya KG28 Sri Raya9 Kajang LineRapid RailMRTKajang17 July 2017
Sri Petaling SP18 Sri Petaling4 Sri Petaling LineRapid RailLRTKuala Lumpur11 July 1998
SS15 KJ29 SS155 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
SS18 KJ30 SS185 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Stadium Kajang KG34 Stadium Kajang9 Kajang LineRapid RailMRTKajang17 July 2017
Subang Alam KJ36 Subang Alam5 Kelana Jaya LineRapid RailLRTShah Alam30 June 2016
Subang Jaya KD09 
 KS02 
 KJ28 
Subang Jaya2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
KTM
Rapid Rail
Commuter rail
LRT
Airport rail link
Subang Jaya14 August 1995 (Tanjung Malim-Port Klang Line)
30 June 2016 (LRT)
1 May 2001 (KL Sentral-Skypark Line)
Sultan Ismail AG5 
 SP5 
Sultan Ismail3 Ampang Line
4 Sri Petaling Line
Rapid RailLRTKuala Lumpur16 December 1996
Sungai Besi SP16 
 PY29 
Sungai Besi4 Sri Petaling Line
12 Putrajaya Line
Rapid RailLRT
MRT
Kuala Lumpur11 July 1998
(LRT)
16 March 2023
(MRT)
Sungai Buloh KA09 
 PY04 
Sungai Buloh2 Tanjung Malim-Port Klang Line
12 Putrajaya Line
KTM
Rapid Rail
Commuter rail
MRT
Selayang1995
(KTM Komuter)
16 December 2016
(MRT)
Sungai Gadut KB15 Sungai Gadut1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban14 May 2011
Sungai Jernih KG33 Sungai Jernih9 Kajang LineRapid RailMRTKajang17 July 2017
SunMed SB4 SunMedB1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
SunU-Monash SB5 SunU-MonashB1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Sunway Lagoon SB3 Sunway LagoonB1 BRT Sunway LineRapid BusBRTSubang Jaya2 June 2015
Surian KG07 Surian9 Kajang LineRapid RailMRTPetaling Jaya16 December 2016
Taipan KJ32 Taipan5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Taman Bahagia KJ23 Taman Bahagia5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Connaught KG26 Taman Connaught9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Equine PY36 Taman Equine12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
Taman Jaya KJ20 Taman Jaya5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Melati KJ2 Taman Melati5 Kelana Jaya LineRapid RailLRTSelayang1 June 1999
Taman Midah KG24 Taman Midah9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Mutiara KG25 Taman Mutiara9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Naga Emas PY28 Taman Naga Emas12 Putrajaya LineRapid RailMRTKuala Lumpur16 March 2023
Taman Paramount KJ22 Taman Paramount5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
Taman Perindustrian Puchong SP26 Taman Perindustrian Puchong4 Sri Petaling LineRapid RailLRTSubang Jaya31 March 2016
Taman Pertama KG23 Taman Pertama9 Kajang LineRapid RailMRTKuala Lumpur17 July 2017
Taman Suntex KG27 Taman Suntex9 Kajang LineRapid RailMRTKajang17 July 2017
Taman Tun Dr Ismail (Taman Tun Dr Ismail-Deloitte) KG10 Taman Tun Dr Ismail9 Kajang LineRapid RailMRTKuala Lumpur16 December 2016
Taman Wahyu KC04 Taman Wahyu1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala LumpurApril 2010
Tanjung Malim KA16 Tanjung Malim2 Tanjung Malim-Port Klang LineKTMCommuter railTanjung Malim1 June 2008
Teluk Gadong KD16 Teluk Gadong2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Teluk Pulai KD15 Teluk Pulai2 Tanjung Malim-Port Klang LineKTMCommuter railKlang1995
Terminal Skypark KS03 Terminal Skypark10 KL Sentral-Terminal Skypark LineKTMAirport rail linkSubang Jaya1 May 2018
Tiroi KB12 Tiroi1 Batu Caves-Pulau Sebang LineKTMCommuter railSeremban1995
Titiwangsa AG3 
 SP3 
 MR11 
 PY17 
Titiwangsa3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
Rapid RailLRT
Monorail
MRT
Kuala Lumpur11 July 1998
(LRT)
31 August 2003
(Monorail)
16 March 2023
(MRT)
Tun Razak Exchange (Tun Razak Exchange-Samsung Galaxy) KG20 
 PY23 
Tun Razak Exchange9 Kajang Line
12 Putrajaya Line
Rapid RailMRTKuala Lumpur17 July 2017
(Kajang Line)
16 March 2023
(Putrajaya Line)
Tun Sambanthan MR2 Tun Sambanthan8 KL MonorailRapid RailMonorailKuala Lumpur31 August 2003
Universiti KJ19 Universiti5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 September 1998
UKM KB07 UKM1 Batu Caves-Pulau Sebang LineKTMCommuter railKuala Lumpur1995
UPM PY34 UPM12 Putrajaya LineRapid RailMRTSubang Jaya16 March 2023
USJ 7 KJ31 
 SB7 
USJ75 Kelana Jaya Line
B1 BRT Sunway Line
Rapid Rail
Rapid Bus
LRT
BRT
Subang Jaya30 June 2016
(LRT)
2 June 2015
(BRT)
USJ 21 KJ34 USJ 215 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
Wangsa Maju KJ3 Wangsa Maju5 Kelana Jaya LineRapid RailLRTKuala Lumpur1 June 1999
Wawasan KJ33 Wawasan5 Kelana Jaya LineRapid RailLRTSubang Jaya30 June 2016
16 Sierra PY38 16 Sierra12 Putrajaya LineRapid RailMRTSepang16 March 2023

Station list according to lines

Map
Railway lines around Klang Valley
LinesTypeTerminiNumber of StationsOwnerOperatorStatus
1 Batu Caves-Pulau SebangCommuter railBatu Caves27Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Operational
Pulau Sebang/Tampin
2 Tanjung Malim-Port KlangCommuter railTanjung Malim34Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Operational
Port Klang
3 AmpangLight rapid transit (LRT)Sentul Timur18Prasarana MalaysiaRapid RailOperational
Ampang
4 Sri PetalingLight rapid transit (LRT)Sentul Timur29Prasarana MalaysiaRapid RailOperational
Putra Heights
5 Kelana JayaLight rapid transit (LRT)Gombak37Prasarana MalaysiaRapid RailOperational
Putra Heights
6 KLIA EkspresExpress Airport rail linkKL Sentral3Express Rail LinkExpress Rail LinkOperational
KLIA T2
7 KLIA TransitAirport rail linkKL Sentral6Express Rail LinkExpress Rail LinkOperational
KLIA T2
8 KL MonorailMonorailKL Sentral11Prasarana MalaysiaRapid RailOperational
Titiwangsa
9 KajangMass rapid transit (MRT)Kwasa Damansara29Mass Rapid Transit CorporationRapid RailOperational
Kajang
10 KL Sentral-Terminal SkyparkLimited express airport rail linkKL Sentral3Keretapi Tanah Melayu (KTM)Keretapi Tanah Melayu (KTM)Suspended[1]
Terminal Skypark
11 Shah AlamLight rapid transit (LRT)Bandar Utama25Prasarana MalaysiaRapid RailUnder construction (Opening in 2025)
Johan Setia
12 PutrajayaMass rapid transit (MRT)Kwasa Damansara36Mass Rapid Transit CorporationRapid RailOperational
Putrajaya Sentral
13 Circle MRTMass rapid transit (MRT)Loop line31Mass Rapid Transit CorporationRapid RailPre-construction[2]
B1 BRT SunwayBus rapid transit (BRT)Sunway-Setia Jaya7Prasarana MalaysiaRapid BusOperational
USJ 7

Legend
Integrated ticketing link Interchange station (paid link)

Klrt-unpaid link Connecting station (unpaid link)

Airport interchange Connected with airport

Express train Connected with intercity rail service

Bus interchange Connected with long-distance bus terminal

Rail line denoted in Italics - Under construction

Station name denoted in Italics - Provisioned/future station

Commuter rail lines

The KTM Komuter has two main lines, namely the 1 Batu Caves-Pulau Sebang Line and the 2 Tanjung Malim-Port Klang Line.[3] These two lines begin separately, but share a common route between Putra and KL Sentral stations, before splitting again and heading towards their respective termini. This effectively makes Putra, Bank Negara, Kuala Lumpur and KL Sentral stations interchanges between the two lines. The station codes are given based on the portion of the lines the stations are on. (Station code legend: K-Komuter, A-Tanjung Malim route, B-Pulau Sebang/Tampin route, C-Batu Caves route, D-Port Klang route)

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
1 - KTM Batu Caves-Pulau Sebang Line
 KC05 Batu CavesGombak Selangor
 KC04 Taman Wahyu Kuala Lumpur Federal Territories
 KC03 Kampung BatuKlrt-unpaid link 12 Putrajaya Line
 KC02 Batu Kentonmen
 KC01 Sentul
 KA04 PutraIntegrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link (PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03 Bank NegaraIntegrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02 Kuala LumpurIntegrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
Express train KTM ETS

 KA01 KL SentralIntegrated ticketing link 2 Tanjung Malim-Port Klang Line

Klrt-unpaid link
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS

 KB01 Mid ValleyKlrt-unpaid link (Abdullah Hukum)
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
 KB02 Seputeh
 KB03 Salak Selatan
 KB04 Bandar Tasik SelatanKlrt-unpaid link
4 Sri Petaling Line
7 KLIA Transit
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 KB05 SerdangSubang Jaya Selangor
 KB06 KajangKlrt-unpaid link
9 Kajang Line
Express train KTM ETS
Hulu Langat
 KB06A Kajang 2
 KB07 UKM
 KB08 Bangi
 KB09 Batang BenarSeremban Negeri Sembilan
 KB10 Nilai
 KB11 Labu
 KB12 Tiroi
 KB13 SerembanExpress train KTM ETS
 KB14 Senawang
 KB15 Sungai Gadut
 KB16 RembauRembau
 KB17 Pulau Sebang/TampinExpress train KTM ETSAlor Gajah Malacca
2 - KTM Tanjung Malim-Port Klang Line
 KA16 Tanjung MalimExpress train KTM ETSMuallim Perak
 KA15 Kuala Kubu BharuExpress train KTM ETSHulu Selangor Selangor
 KA14 Rasa
 KA13 Batang KaliExpress train KTM ETS
 KA12 Serendah
 KA11 RawangExpress train KTM ETSGombak
 KA10 Kuang
 KA09 Sungai BulohKlrt-unpaid link
12 Putrajaya Line
Express train KTM ETS
Petaling Jaya
 KA08 Kepong SentralKlrt-unpaid link
12 Putrajaya Line (Sri Damansara Timur)
Express train KTM ETS
 KA07 Kepong Kuala Lumpur Federal Territories
 KA05 Segambut
 KA04 PutraIntegrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link (PWTC)
3 Ampang Line
4 Sri Petaling Line

 KA03 Bank NegaraIntegrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link (Bandaraya)
3 Ampang Line
4 Sri Petaling Line

 KA02 Kuala LumpurIntegrated ticketing link 1 Batu Caves-Pulau Sebang Line

Klrt-unpaid link
5 Kelana Jaya Line (Pasar Seni)
9 Kajang Line (Pasar Seni)
Express train KTM ETS

 KA01 KL SentralIntegrated ticketing link 1 Batu Caves-Pulau Sebang Line


Klrt-unpaid link
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS

 KD01 Abdullah HukumKlrt-unpaid link
5 Kelana Jaya Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)
 KD02 Angkasapuri
 KD03 Pantai DalamKlrt-unpaid link 13 Circle Line
 KD04 PetalingPetaling Jaya Selangor
 KD05 Jalan Templer
 KD06 Kampung Dato’ Harun
 KD07 Seri Setia
 KD08 Setia JayaKlrt-unpaid link B1 BRT Sunway Line (Sunway-Setia Jaya)
 KD09 Subang JayaKlrt-unpaid link
5 Kelana Jaya Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KD10 Batu TigaShah Alam
 KD11 Shah Alam
 KD12 Padang Jawa
 KD13 Bukit BadakKlang
 KD14 Klang
 KD15 Teluk Pulai
 KD16 Teluk Gadong
 KD17 Kampung Raja Uda
 KD18 Jalan Kastam
 KD19 Port Klang

Light rapid transit (LRT) lines

There are three LRT lines in the Klang Valley which are currently operating, namely the 3 Ampang Line, 4 Sri Petaling Line, and 5 Kelana Jaya Line.[4] The 11 Shah Alam Line was proposed in 2015 and is still currently under construction.[5]

The Ampang and Sri Petaling Lines operate as a single LRT system. They share a common route from Sentul Timur station to Chan Sow Lin station, therefore, all stations on this route act as interchange stations between both the lines. After Chan Sow Lin, the lines split toward their respective termini. The Kelana Jaya Line starts in Gombak in the north, passing through the city centre, and terminating at Putra Heights station which is also the southern terminus of the Sri Petaling Line, serving as an interchange between the two lines.

The third LRT system, the Shah Alam Line is planned to be opened in 2025. It will be the first rail transit line in the Klang Valley Integrated Transit System to be situated completely outside the borders of Kuala Lumpur.

This is the new stations numbering of the 3 Ampang Line, which can be found on the Rapid KL's official website here.
This is the stations numbering of 4 Sri Petaling Line, which can be found on Rapid KL's official website here.
Official transit line map of the 5 Kelana Jaya Line, which can be found on Rapid KL's official website here.
Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
3 - LRT Ampang Line
 AG1 Sentul TimurIntegrated ticketing link 4 Sri Petaling Line Kuala Lumpur Federal Territories
 AG2 SentulIntegrated ticketing link 4 Sri Petaling Line
 AG3 TitiwangsaIntegrated ticketing link
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line13 Circle Line
 AG4 PWTCIntegrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG5 Sultan IsmailIntegrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link 8 KL Monorail (Medan Tuanku)

 AG6 BandarayaIntegrated ticketing link 4 Sri Petaling Line

Klrt-unpaid link (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 AG7 Masjid JamekIntegrated ticketing link
4 Sri Petaling Line
5 Kelana Jaya Line
 AG8 Plaza RakyatIntegrated ticketing link
4 Sri Petaling Line
9 Kajang Line (Merdeka)
 AG9 BBCC–Hang TuahIntegrated ticketing link
4 Sri Petaling Line
8 KL Monorail
 AG10 PuduIntegrated ticketing link 4 Sri Petaling Line
 AG11 Chan Sow LinIntegrated ticketing link
4 Sri Petaling Line
12 Putrajaya Line
 AG12 Miharja
 AG13 MaluriIntegrated ticketing link 9 Kajang Line
 AG14 Pandan JayaAmpang Selangor
 AG15 Pandan IndahIntegrated ticketing link 13 Circle Line
 AG16 Cempaka
 AG17 Cahaya
 AG18 Ampang
4 - LRT Sri Petaling Line
 SP1 Sentul TimurIntegrated ticketing link 3 Ampang Line Kuala Lumpur Federal Territories
 SP2 SentulIntegrated ticketing link 3 Ampang Line
 SP3 TitiwangsaIntegrated ticketing link
3 Ampang Line
8 KL Monorail
12 Putrajaya Line13 Circle Line
 SP4 PWTCIntegrated ticketing link 3 Ampang Line

Klrt-unpaid link (Putra)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP5 Sultan IsmailIntegrated ticketing link 3 Ampang Line

Klrt-unpaid link 8 KL Monorail (Medan Tuanku)

 SP6 BandarayaIntegrated ticketing link 3 Ampang Line

Klrt-unpaid link (Bank Negara)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line

 SP7 Masjid JamekIntegrated ticketing link
3 Ampang Line
5 Kelana Jaya Line
 SP8 Plaza RakyatIntegrated ticketing link
3 Ampang Line
9 Kajang Line (Merdeka)
 SP9 BBCC–Hang TuahIntegrated ticketing link
3 Ampang Line
8 KL Monorail
 SP10 PuduIntegrated ticketing link 3 Ampang Line
 SP11 Chan Sow LinIntegrated ticketing link
3 Ampang Line
12 Putrajaya Line
 SP12 Cheras
 SP13 Salak SelatanIntegrated ticketing link 13 Circle Line
 SP14 Bandar Tun Razak
 SP15 Bandar Tasik SelatanKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
7 KLIA Transit
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 SP16 Sungai BesiIntegrated ticketing link 12 Putrajaya Line
 SP17 Bukit Jalil
 SP18 Sri Petaling
 SP19 Awan Besar
 SP20 Muhibbah
 SP21 Alam Sutera
 SP22 Kinrara BK5Subang Jaya Selangor
 SP24 IOI Puchong Jaya
 SP25 Pusat Bandar Puchong
 SP26 Taman Perindustrian Puchong
 SP27 Bandar Puteri
 SP28 Puchong Perdana
 SP29 Puchong Prima
 SP31 Putra HeightsIntegrated ticketing link 5 Kelana Jaya Line
5 - LRT Kelana Jaya Line
 KJ1 GombakExpress train  ECR  East Coast Rail Link (ECR)
Bus interchange Eastern Integrated Terminal (TBT)
Gombak Selangor
 KJ2 Taman Melati Kuala Lumpur Federal Territories
 KJ3 Wangsa Maju
 KJ4 Sri Rampai
 KJ5 SetiawangsaIntegrated ticketing link 13 Circle LineAmpang Selangor
 KJ6 Jelatek
 KJ7 Dato' Keramat Kuala Lumpur Federal Territories
 KJ8 Damai
 KJ9 Ampang ParkKlrt-unpaid link 12 Putrajaya Line
 KJ10 KLCC
 KJ11 Kampung Baru
 KJ12 Dang WangiKlrt-unpaid link 8 KL Monorail (Bukit Nanas)
 KJ13 Masjid JamekIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 KJ14 Pasar SeniIntegrated ticketing link 9 Kajang Line

Klrt-unpaid link (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
Express train KTM ETS

 KJ15 KL Sentral–redONEKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
 KJ16 Bank Rakyat–Bangsar
 KJ17 Abdullah HukumKlrt-unpaid link
2 Tanjung Malim-Port Klang Line
1 Batu Caves-Pulau Sebang Line (Mid Valley)[Note 2]
 KJ18 Kerinchi
 KJ19 UniversitiKlrt-unpaid link 13 Circle Line
 KJ20 Taman JayaPetaling Jaya Selangor
 KJ21 Asia Jaya
 KJ22 Taman Paramount
 KJ23 Taman Bahagia
 KJ24 Kelana Jaya
 KJ25 Lembah Subang
 KJ26 Ara Damansara
 KJ27 CGC-GlenmarieIntegrated ticketing link 11 Shah Alam LineShah Alam
 KJ28 Subang JayaKlrt-unpaid link
2 Tanjung Malim-Port Klang Line
10 KL Sentral-Terminal Skypark Line
Subang Jaya
 KJ29 SS15
 KJ30 SS18
 KJ31 USJ 7Integrated ticketing link B1 BRT Sunway Line
 KJ32 Taipan
 KJ33 Wawasan
 KJ34 USJ 21
 KJ35 Alam MegahShah Alam
 KJ36 Subang Alam
 KJ37 Putra HeightsIntegrated ticketing link 4 Sri Petaling LineSubang Jaya
11 - LRT Shah Alam Line (opening 2025)
 SA01 Bandar UtamaIntegrated ticketing link 9 Kajang LinePetaling Jaya Selangor
 SA02 Kayu Ara
 SA03 BU11
 SA04 Tropicana
 SA05 Damansara Idaman
 SA06 SS 7
 SA07 GlenmarieIntegrated ticketing link 5 Kelana Jaya LineShah Alam
 SA08 Temasya
 SA09 Kerjaya
 SA10 Stadium Shah Alam
 SA12 Dato Menteri
 SA13 Raja Muda
 SA14 UiTM Shah Alam
 SA15 Seksyen 7 Shah Alam
 SA16 Bukit Raja SelatanKlang
 SA17 Bandar Baru Klang
 SA18 Pasar Besar Klang
 SA19 Jalan Meru
 SA20 Pasar Jawa
 SA21 Taman Selatan
 SA22 Seri Andalas
 SA23 Klang Jaya
 SA24 Bandar Bukit Tinggi
 SA25 Bandar Botanik
 SA26 Johan Setia

Bus rapid transit (BRT) Lines

The B1 BRT Sunway Line is a bus rapid transit line in Bandar Sunway, Selangor. The BRT line is a public-private partnership project between Prasarana Malaysia and Sunway Group to provide a better and integrated transit service for the residents and commuters of Bandar Sunway and USJ.[6] A second BRT line known as the B2 BRT Federal Line was proposed but has been scrapped by the government.

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
B1 - BRT Sunway Line
 SB1 Sunway-Setia JayaKlrt-unpaid link 2 Tanjung Malim-Port Klang Line (Setia Jaya)Petaling Jaya Selangor
 SB2 Mentari
 SB3 Sunway LagoonSubang Jaya
 SB4 SunMed
 SB5 SunU-Monash
 SB6 South Quay-USJ 1
 SB7 USJ 7Integrated ticketing link 5 Kelana Jaya Line

Airport rail link lines

There are two main airport rail link systems. One is operated by Express Rail Link (ERL) and another one by Keretapi Tanah Melayu (KTM).

The ERL system consists of two lines, namely the 6 KLIA Ekspres and the 7 KLIA Transit.[7] The KLIA Ekspres is a non-stop service between KL Sentral and the Kuala Lumpur International Airport (KLIA), and does not stop at any station in between (hence the name "express"). The KLIA Transit services all stations between KL Sentral and KLIA (hence the name "transit").

The 10 KL Sentral-Terminal Skypark Line, operated by KTM as part of its KTM Komuter service, serves the Sultan Abdul Aziz Shah Airport (also known as Subang Airport), spanning 26 km from KL Sentral to Terminal Skypark station.[8]

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
6 - ERL KLIA Ekspres
7 - ERL KLIA Transit
 KE1  KT1 KL SentralKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
 Kuala Lumpur Federal Territories
 KT2 Bandar Tasik SelatanKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
4 Sri Petaling Line
Express train KTM ETS
Bus interchange Southern Integrated Terminal (TBS)
 KT3 Putrajaya & CyberjayaKlrt-unpaid link
12 Putrajaya Line (Putrajaya Sentral)
14 Putrajaya Monorail
 Putrajaya
 KT4 Salak TinggiSepang Selangor
 KE2  KT5 KLIA T1Airport interchange Kuala Lumpur International Airport
 KE3  KT6 KLIA T2
10 - KTM KL Sentral-Terminal Skypark Line
 KS01 KL SentralKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
9 Kajang Line (Muzium Negara)
Express train KTM ETS
 Kuala Lumpur Federal Territories
 KS02 Subang JayaKlrt-unpaid link
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
Subang Jaya Selangor
 KS03 Terminal SkyparkAirport interchange Sultan Abdul Aziz Shah AirportShah Alam


Monorail lines

This is the stations numbering of 8 KL Monorail line, which can be found on Rapid KL's official website here.

The 8 KL Monorail is situated entirely within the Kuala Lumpur city centre and serves to connect various shopping and entertainment centres throughout the city centre.

The 14 Putrajaya Monorail is a proposed transit line that was meant to serve the administrative capital of Putrajaya. The line's construction began in 2004 but was halted due to the city's low population. In 2020, plans to resume the construction are underway.

Station CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
8 - KL Monorail
 MR1 KL SentralKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
9 Kajang Line (Muzium Negara)
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
 Kuala Lumpur Federal Territories
 MR2 Tun Sambanthan
 MR3 Maharajalela
 MR4 BBCC–Hang TuahIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 MR5 Imbi
 MR6 Bukit BintangKlrt-unpaid link 9 Kajang Line
 MR7 Raja Chulan
 MR8 Bukit NanasKlrt-unpaid link 5 Kelana Jaya Line (Dang Wangi)
 MR9 Medan TuankuKlrt-unpaid link (Sultan Ismail)
3 Ampang Line
4 Sri Petaling Line
 MR10 Chow Kit
 MR11 TitiwangsaIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
12 Putrajaya Line13 Circle Line

Mass rapid transit (MRT) lines

There are two MRT lines currently operational in the Klang Valley, namely the 9 Kajang Line and the 12 Putrajaya Line.

A third MRT line, the proposed 13 Circle Line, is currently undergoing a pre-construction phase, with constructions of the loop line set to commence in 2023.[2]

CodeStation NameInterchanges/ConnectionsDistrict/CityState/Territory
9 - MRT Kajang Line
 KG04 Kwasa DamansaraIntegrated ticketing link 12 Putrajaya Line
Bus interchange Northern Integrated Terminal (TBU)
Shah Alam Selangor
 KG05 Kwasa Sentral
 KG06 Kota DamansaraPetaling Jaya
 KG07 Surian
 KG08 Mutiara Damansara
 KG09 Bandar UtamaIntegrated ticketing link 11 Shah Alam Line
 KG10 Taman Tun Dr Ismail–Deloitte (TTDI) Kuala Lumpur Federal Territories
 KG12 Phileo Damansara
 KG13 Pavilion Damansara Heights–Pusat Bandar Damansara
 KG14 Semantan
 KG15 Muzium NegaraKlrt-unpaid link (KL Sentral)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail[Note 1]
10 KL Sentral-Terminal Skypark Line
Express train KTM ETS
 KG16 Pasar SeniIntegrated ticketing link 5 Kelana Jaya Line

Klrt-unpaid link (Kuala Lumpur)
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 KG17 MerdekaIntegrated ticketing link (Plaza Rakyat)
3 Ampang Line
4 Sri Petaling Line
 KG18A Pavilion Kuala Lumpur–Bukit BintangKlrt-unpaid link 8 KL Monorail
 KG20 Tun Razak Exchange–Samsung Galaxy (TRX)Integrated ticketing link 12 Putrajaya Line
 KG21 Cochrane
 KG22 AEON–MaluriIntegrated ticketing link 3 Ampang Line
 KG23 Taman Pertama
 KG24 Taman MidahIntegrated ticketing link 13 Circle Line
 KG25 Taman Mutiara
 KG26 Taman Connaught
 KG27 Taman SuntexHulu Langat Selangor
 KG28 Sri Raya
 KG29 Bandar Tun Hussein Onn
 KG30 Batu 11 Cheras
 KG31 Bukit Dukung
 KG33 Sungai Jernih
 KG34 Stadium Kajang
 KG35 KajangKlrt-unpaid link
1 Batu Caves-Pulau Sebang Line
Express train KTM ETS
12 - MRT Putrajaya Line[9]
 PY01 Kwasa DamansaraIntegrated ticketing link 9 Kajang Line
Bus interchange Northern Integrated Terminal (TBU)
Shah Alam Selangor
 PY03 Kampung SelamatPetaling Jaya
 PY04 Sungai BulohKlrt-unpaid link
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 PY05 Damansara Damai
 PY06 Sri Damansara Barat
 PY07 Sri Damansara Sentral
 PY08 Sri Damansara TimurKlrt-unpaid link (Kepong Sentral)
2 Tanjung Malim-Port Klang Line
Express train KTM ETS
 PY09 Metro Prima Kuala Lumpur Federal Territories
 PY10 Kepong Baru
 PY11 Jinjang
 PY12 Sri Delima
 PY13 Kampung BatuKlrt-unpaid link 1 Batu Caves-Pulau Sebang Line
 PY14 Kentonmen
 PY15 Jalan Ipoh
 PY16 Sentul Barat
 PY17 TitiwangsaIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail13 Circle Line
 PY18 Hospital Kuala Lumpur
 PY19 Raja Uda–UTM
 PY20 Ampang ParkKlrt-unpaid link 5 Kelana Jaya Line
 PY21 Persiaran KLCC
 PY22 Conlay–Kompleks Kraf
 PY23 Tun Razak Exchange–Samsung Galaxy (TRX)Integrated ticketing link 9 Kajang Line
 PY24 Chan Sow LinIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
 PY27 KuchaiIntegrated ticketing link 13 Circle Line
 PY28 Taman Naga Emas
 PY29 Sungai BesiIntegrated ticketing link 4 Sri Petaling Line
 PY31 Serdang Raya UtaraSubang Jaya Selangor
 PY32 Serdang Raya Selatan
 PY33 Serdang Jaya
 PY34 UPM
 PY36 Taman Equine
 PY37 Putra Permai
 PY38 16 SierraSepang
 PY39 Cyberjaya Utara–Finexus
 PY40 Cyberjaya City Centre–Limkokwing
 PY41 Putrajaya SentralKlrt-unpaid link
7 KLIA Transit (Putrajaya & Cyberjaya)
14 Putrajaya Monorail
 Putrajaya Federal Territories
13 - MRT Circle Line (Opening 2028)[10]
 CC01 Bukit Kiara SouthIntegrated ticketing link 9 Kajang Line Kuala Lumpur Federal Territories
 CC02 Sri Hartamas
 CC03 Mont Kiara
 CC04 Bukit Segambut
 CC05 Taman Sri Sinar
 CC06 Dutamas
 CC07 Jalan KuchingKlrt-unpaid link 2 Tanjung Malim-Port Klang Line
 CC08 TitiwangsaIntegrated ticketing link
3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line
 CC09 Kampung Puah
 CC10 Jalan Langkawi
 CC11 Danau Kota
 CC12 Setapak
 CC13 Rejang
 CC14 SetiawangsaIntegrated ticketing link 5 Kelana Jaya LineAmpang Selangor
 CC15 AU2
 CC16 Taman Hillview
 CC17 Tasik Ampang
 CC18 Kampung Pandan
 CC19 Pandan IndahIntegrated ticketing link 3 Ampang Line
 CC20 Taman Kencana
 CC21 Taman Cheras Kuala Lumpur Federal Territories
 CC22 Taman MidahIntegrated ticketing link 9 Kajang Line
 CC23 Jalan Yaacob Latif
 CC24 Sri Permaisuri
 CC25 Salak SelatanIntegrated ticketing link 4 Sri Petaling Line
 CC26 KuchaiIntegrated ticketing link 12 Putrajaya Line
 CC27 Jalan Klang Lama
 CC28 Pantai DalamKlrt-unpaid link 2 Tanjung Malim-Port Klang Line
 CC29 Pantai Permai
 CC30 UniversitiKlrt-unpaid link 5 Kelana Jaya Line
 CC31 UM

Klang Valley Integrated Transit Map

The Klang Valley Integrated Transit Map, released by Rapid KL illustrates the connectivity between the different lines through interchanges and connecting stations. The map consists of all operational lines in the Klang Valley Integrated Transit system, as well as the remainder of the Putrajaya Line and the upcoming Shah Alam Line. The map also features stations with parking facilities.

The transit map does not include the proposed Circle Line and Putrajaya Monorail.

  • Latest version: [1]

Notes

References

🔥 Top keywords: Main PageSpecial:SearchWikipedia:Featured picturesYasukeHarrison ButkerRobert FicoBridgertonCleopatraDeaths in 2024Joyce VincentXXXTentacionHank AdamsIt Ends with UsYouTubeNew Caledonia2024 Indian general electionHeeramandiDarren DutchyshenSlovakiaKingdom of the Planet of the ApesAttempted assassination of Robert FicoLawrence WongBaby ReindeerXXX: Return of Xander CageThelma HoustonFuriosa: A Mad Max SagaMegalopolis (film)Richard GaddKepler's SupernovaWicked (musical)Sunil ChhetriXXX (2002 film)Ashley MadisonAnya Taylor-JoyPlanet of the ApesNava MauYoung SheldonPortal:Current eventsX-Men '97